About this opportunity
Venture Academy, through Weber County School District in Utah, is requesting proposals for construction of a new pre-engineered metal building gymnasium and remodeling of an existing gymnasium to create two new classrooms at 508 N 1500 W, Marriott-Slaterville, Utah, with proposals due July 21, 2026. The project must reach substantial completion by August 2027.
The new gym addition spans approximately 14,000 square feet and includes one full-size regulation basketball court, 6–8 rows of retractable bleachers, an entry vestibule, three restrooms, a custodial closet, and three large storage rooms. An attached lower-ceiling space (approximately 20' × 100') provides additional support facilities. The existing gym remodel converts a 33' × 55' area on the south end into two vertically stacked classrooms accessible via existing upper-level walkways and elevator, with a new exterior egress stair required on the west side. The remaining north portion of the gym (approximately 60' × 55') will continue to operate as auxiliary gym space.
New gym construction will commence while school is in session; interior classroom remodeling will begin around May 2027. Bidders must account for ongoing school operations and associated scheduling constraints during execution.
The RFP document is available; it contains evaluation criteria, technical specifications, bonding and insurance requirements, and full terms and conditions. The document does not explicitly state contract value, set-aside or preference programs, an incumbent contractor, or specific funding sources.
Opportunity text
Purpose Venture Academy is adding an approximately 12,000 square foot pre-engineered metal building Gym adjacent to the existing High School building as well as remodeling a portion of the existing gym to create 2 new classrooms. The project should reach substantial completion by August, 2027. New Gym construction will begin while school is in session, the interior classroom remodel will begin on or around May 2027. Project Description Location - 508 N 1500 W, Marriott-Slaterville, UT 84404 Gym Addition The gym addition will be approximately 14,000 sq ft (100' x 120' large space, and 20' x 100' attached lower ceiling space) and will include: - One full-size regulation basketball court - 6-8 rows of retractable bleachers along one side - An attached lower-height add-on (approximately 20' x 100') including: - Entry vestibule - Approximately three (3) restrooms - Custodial closet - Three (3) large storage rooms accessible from the gym (one of these rooms could be converted to dressing room stalls, no showers). Existing Gym Remodel (Classrooms) A portion of the existing gym (CMU construction) will be remodeled to create two (2) classrooms: - Approximately 33' x 55' area on the south end of the existing gym - Classrooms will be vertically stacked (two-story configuration) - Access to the second-floor classroom will utilize existing upper-level walkways and elevator. - A new exterior egress stair is required on the west side of the building - The remaining north portion of the gym (approx. 60' x 55') will remain in use as an auxiliary gym space