McIntosh Power Plant Covered Parking

Closed State & local contract opportunity Posted

Solicitation number
2026-RFP-062
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Lakeland is soliciting bids for design, fabrication, shop drawings, and construction of covered parking structures at the C.D. McIntosh Power Plant, with proposals due July 7, 2026. The City may award all or part of eight distinct parking areas to one contractor based on pricing and other selection criteria.

The scope requires the selected contractor to perform field-condition verification, design, shop-drawing preparation, fabrication, and full installation of parking systems across eight separate areas throughout the plant. The contractor must identify and report constructability concerns to the City prior to fabrication and ensure all work complies with Florida Building Code. Site walkdowns are available by request prior to bid submission; prospective bidders should contact David Holdener at 863-242-0202 or david.holdener@lakelandelectric.com to schedule.

Submission documents include a detailed parking sketch, contractor safety evaluation form, indemnification templates for consultants and contractors, human-trafficking affidavit, and a contractor annual audit form. The City has posted a covered-parking selection-criteria document guiding evaluation. No specific contract value, contract term, or incumbent is identified in the posting.

Opportunity text

The City of Lakeland is seeking a qualified contractor to provide design, fabrication, shop drawings, and construction services for several covered parking structures at the C.D. McIntosh Power Plant. The project consists of eight (8) different parking areas throughout the plant. The selected contractor shall be responsible for design, preparation of shop drawings, fabrication, and full installation of the parking systems. The City of Lakeland may award all or part of the parking areas to one contractor based on pricing and other selection criteria.

The contractor shall verify all field conditions. Any constructability concerns shall be brought to the City's attention prior to fabrication. The vendor is responsible for ensuring proper installation and alignment with Florida Building code.

Site walkdowns can be scheduled at the C.D. McIntosh Power Plant prior to bid submission for prospective bidders to review site conditions, ask questions, and fully understand the project scope, by contacting David Holdener 863.242.0202 or david.holdener@lakelandelectric.com.

Files

File Type Posted
McIntosh_Power_Plant_Covered_Parking.pdf PDF
McIntosh_Power_Plant_Covered_Parking.pdf PDF
McIntosh_Power_Plant_Covered_Parking.pdf PDF
Covered_Parking_Selection_Criteria.docx DOCX document
Covered_Parking_Selection_Criteria.docx DOCX document
Covered_Parking_Sketch.pdf PDF
Covered_Parking_Sketch.pdf PDF
Covered_Parking_Sketch.pdf PDF
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Consultant.doc DOC document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor.doc DOC document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Contractor_Safety_Evaluation_Form.pdf PDF
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Indemnification_2026_Vendor.doc DOC document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Show all 32

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors