Covered_Parking_Sketch.pdf

PDF 77 KB Posted

Attached to
McIntosh Power Plant Covered Parking
Solicitation number
2026-RFP-062
Issued by
Polk County, Florida

About this file

This is a covered parking sketch document prepared for the City of Lakeland, Florida's solicitation for design, fabrication, shop drawings, and construction of covered parking structures at the C.D. McIntosh Power Plant. The sketch provides conceptual designs and dimensional specifications for eight distinct parking areas (Units 5 Parking A, B, C, and D, plus additional MREP Resource Center and supporting structures) throughout the plant facility. The design drawings, prepared using SOLIDWORKS, include multiple views with scale references (1:384 and 1:20 detail scales) showing structural support configurations, parking dimensions ranging from 90 feet to 207 feet in length, support post specifications of 4 inches by 4 inches positioned 5 feet from roof low side, and angular measurements of 84 degrees for certain structural elements. The City of Lakeland is accepting bids with a proposal due date of July 7, 2026, and may award all or part of the eight parking areas to one or multiple contractors based on pricing and selection criteria. Prospective bidders are encouraged to schedule site walkdowns at the C.D. McIntosh Power Plant prior to bid submission by contacting David Holdener at 863-242-0202 or david.holdener@lakelandelectric.com to verify field conditions and clarify project scope.

The selected contractor shall be responsible for field-condition verification, design finalization, shop-drawing preparation, fabrication, and full installation of all parking systems in compliance with the Florida Building Code. The contractor must identify and report any constructability concerns to the City prior to fabrication to ensure proper project execution. No specific contract value, contract term, renewal options, incumbent contractor, or funding source is identified in the project documentation. The City has provided a covered-parking selection-criteria document to guide contractor evaluation, and all submission documents include required forms such as contractor safety evaluation forms, indemnification templates, human-trafficking affidavits, and contractor annual audit forms.

View the file

Other files

File Type Posted
McIntosh_Power_Plant_Covered_Parking.pdf PDF
Covered_Parking_Selection_Criteria.docx DOCX document
Covered_Parking_Sketch.pdf PDF
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

150ft 40ft 20ft

60ft 20ft

MREP Conceptual

Supports Centered

Resource Center Conceptual

9ft

20in

18ft

68ft

20ft

5ft

9ft

18in

20ft

50ft 110ft

5ft 20ft

9ft

20in

20ft 20ft

60ft

5ft

9ft

20in

20ft

90ft

20ft 84deg

5ft A

Unit 5 Parking A Conceptual

9ft

20in

20ft 20ft 90ft

5ft

Scale 1:384

9ft 20in

4in 4in

DETAIL A

SCALE 1 : 20

WFM

Unit 5 Conceptual

Unit 5 Parking B Conceptual

All supports 4in by 4 in

All supports 5 feet from roof low side

SOLIDWORKS Educational Product. For Instructional Use Only.

84deg

207.1ft

20ft

5ft 20ft

110ft

20ft

9ft 20in

Unit 5 Parking C Conceptual

90ft

20ft 10ft 84deg 5ft

20ft 108in 20in

Unit 5 Parking D Conceptual

Scale 1:384 SOLIDWORKS Educational Product. For Instructional Use Only.

Sheet1
Drawing View1
Drawing View2
Drawing View3
Drawing View4
Drawing View5
Drawing View6
Drawing View7
Drawing View8
Drawing View9
Drawing View10
Drawing View11
Drawing View12
Drawing View13
Drawing View14
Drawing View15
Drawing View16
Drawing View17
Drawing View18
Detail View A (1 : 20)
Sheet2
Drawing View20
Drawing View21
Drawing View22
Drawing View23
Drawing View24
Drawing View25

File details come from the government source that posted it. Updated .