LSC Kingwood Fire Science Water Line and Septic System Project
Closed State & local contract opportunity Posted
- Solicitation number
- CSP-26-08-10
- State
- Texas
- Responses due
Opportunity facts
- NIGP codes
- UNSPSC codes
- 72141124 Pipe laying service
- 95121640 Pipeline
- 72141123 Manhole construction service
- 72141111 Gas main construction service
- 72141113 Oil and gas pipeline construction service
- 72141114 Pipeline wrapping service
- 95121811 Aquaduct or other water supply conduit, except pipeline
- 72141511 Digging services
- 72141126 Underground utilities construction service
- 72121505 Waste water and sewage treatment plant construction service
Show all 31
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 95121810 Irrigation and flood control waterworks
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 72103305 Drain laying service
- 72141120 Sewer line construction service
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 72121504 Waste disposal plant construction service
- 72141121 Water main construction service
- 72141125 Pumping station construction service
- 95121805 Well
- 95121804 Water tower
- Point of contact
-
- Lydia Sterling lydia.sterling@lonestar.edu (832) 813-6211
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
Lone Star College System (LSCS) is requesting competitive sealed proposals for construction of water line and septic system infrastructure at the LSC-Kingwood Fire Science facility, with proposals due September 25, 2026 at 2:00 p.m. CT, and a mandatory site visit on September 9, 2026 at 9:00 a.m.
The scope encompasses installation of public 12-inch and 8-inch water mains, a private 8-inch fire service line, fire-rated compound water meter assembly vault, RPZ backflow prevention assembly, aerobic septic system with drip irrigation disposal field, and associated utility appurtenances, testing, restoration, startup, and commissioning. The contractor must obtain all permits, conduct soil testing for septic system sizing, coordinate with existing campus utilities, and comply with City of Houston standards, TCEQ requirements, and Texas Department of Licensing and Regulation standards. Pricing must include all labor, materials, equipment, supervision, permitting, testing, inspections, and closeout services, with delivery FOB Lone Star College System.
The estimated project budget is $500,000. The project is funded with federal funds, triggering compliance with 2 CFR Part 200, the Clean Air Act, and the Federal Water Pollution Control Act. Contractors must comply with Davis-Bacon wage rates for Harris and Montgomery counties and submit performance and payment bonds for 100 percent of the contract amount. Insurance requirements include workers' compensation, general liability, and builder's risk coverage. Three references from companies or school systems other than LSCS are required.
Evaluation criteria allocate 50 points to price, 20 points to schedule, 10 points to relevant experience, 5 points each to safety record, firm qualifications, and project team, and 5 points to technical approach. Questions are due September 11, 2026 at 12:00 p.m. CT, with responses posted by September 18. Board approval is expected December 3, 2026.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity