Passaic Valley Water Commission is requesting sealed bids for improvements at the Little Falls Water Treatment Plant Chemical Fill Station, with bids due June 9, 2026 at 2:00 p.m. local time. The project involves replacement of five 2-inch diameter chemical pipes, valves, and disconnects; installation of check valves on each chemical line; cutting and capping of inactive pipes; replacement of concrete pad and bollards; replacement of existing compressed air pipe and hose reel; and replacement and installation of heat trace systems at 800 Union Blvd, Totowa, New Jersey.

All bidders must comply with the Local Public Contracts Law (N.J.S.A. 40A:11-1 et seq.), the Ownership Disclosure Notice (N.J.S.A. 52:24.1), and Affirmative Action Requirements (N.J.S.A. 10:5-32), along with applicable state laws. The successful contractor must comply with prevailing local minimum wage rates as determined by the New Jersey Department of Labor.

The contract will be awarded to the lowest responsible bidder. Questions regarding bid documents are due May 26, 2026 at 3:00 p.m. A non-mandatory pre-bid conference is scheduled for May 19, 2026 at 10:00 a.m. at the Little Falls Water Treatment Plant Auditorium and Chemical Fill Station. Bid documents are available in electronic form upon request to lbresemann@pvwc.com, and all submissions must use standardized forms provided in the submission package without modification or alteration. The Passaic Valley Water Commission reserves the right to reject any and all bids or waive minor informalities or irregularities in proposals received.

Opportunity text

This Contract is for the improvements at the Chemical Fill Station including replacement of five (5) 2 Diameter chemical pipes, valves, and disconnects, installation of a check valve at each of the five chemical lines, cut and cap the inactive pipes, replacements of concrete pad and bollards, replacement of existing compressed air pipe and hose reel, replacement of existing and installation of new heat trace systems.