Collective Storm Drainage Improvements - Series W

Closed State & local contract opportunity Posted

Solicitation number
FY27-ITBCon-13
State
North Carolina
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Charlotte Water is requesting sealed bids for rehabilitation and repair of high-hazard dam discharge infrastructure, under drains, and storm drainage infrastructure at Linda Lake and Oakwood Dams, with bids due July 16, 2026 at 10:00 a.m. local time. The City of Charlotte has established a Minority Women-Owned and Small Business Enterprise (MWSBE) participation goal of 5.00% for this project.

The work involves both Linda Lake and Oakwood Dams located in Mecklenburg County and Cleveland Town, North Carolina. A pre-bid conference is scheduled for July 1, 2026 at 10:00 a.m. via Microsoft Teams; attendance is highly encouraged but not mandatory. Both the pre-bid conference and public bid opening will be available remotely via Teams for public viewing. Sealed bids will be opened publicly at the Contracts Administration Section, 5100 Brookshire Boulevard, Charlotte, North Carolina 28216.

The estimated project cost is $426,213. Bid security is required in accordance with Article 8 of the Instructions to Bidders. Bidding documents are available from Richa Graphics through multiple locations and online at http://planroom.richa.com. All addenda, clarifications, and related information will be posted on the City of Charlotte's Procurement Portal at https://charlottenc.bonfirehub.com, and bidders are responsible for monitoring this portal for updates. Inquiries regarding MWSBE participation may be directed to 704-336-4138 or www.charlottebusinessinclusion.com. North Carolina laws and regulations apply, and the City reserves the right to reject any or all bids. Reasonable accommodations and auxiliary aids will be provided upon a 72-hour written request, and bidding documents are available in alternative formats upon the same timeframe.

Opportunity text

2 versions

Update #2 · Latest ·

The Collective Storm Drainage Improvement Project Series W will include 2 separate projects with this series. 10208 and 10209 Crestwood Drive will include 207 linear feet of new 48" RCP that will connect an existing upstream creek channel to Providence Lake. The 48" RCP installation will be approximately 7-14 feet deep and foundation protection approved by a professional engineer is anticipated. 10208 and 10209 Crestwood Drive anticipates foundation protection at 10201 and 10209 Crestwood Drive. 7211 Quail Meadow Lane will include 717 linear feet of new 42" RCP, 60 linear feet of new 38" x 60" elliptical RCP, and 19 linear feet of new 15" RCP. The new storm pipe system will run along Quail Meadow Lane and outlet on Quail Hollow Homeowners Association Inc. property.

Update #1 ·

This project consists of the rehabilitation and repairing of high-hazard dam discharge infrastructure, under drains, and storm drainage infrastructure at both Linda Lake and Oakwood Dams.

Files

File Type Posted
Collective SDIP - Series W.pdf PDF
Linda Lake - Oakwood Pond Rehabilitation.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors