The City of Hollywood, Florida is soliciting bids under IFB-435-26-JM for construction of Lift Station W-27 upgrades, force main replacement, and stormwater improvements at Rotary Park, with a non-mandatory pre-bid conference on November 17, 2026 and bids due December 9, 2026. A local Hollywood vendor preference applies: local vendors within 5% of the lowest bid may submit a second offer and win the award with a bid at least 1% lower than the non-local low bidder.
Bidders must hold an active Florida General Contractor license and demonstrate completion of at least three similar projects within the past seven years, each involving a pump station with pumps larger than 60 HP and force main installation of 16-inch or larger pipe for a minimum of 1,000 linear feet. The scope includes replacing three pumps with four dry pit submersible pumps, building a new electrical room, adding variable frequency drives, replacing the emergency generator and electrical gear, rehabilitating and coating the wet well, installing a 20-inch epoxy-lined ductile iron force main of approximately 1,600 linear feet, abandoning existing 10-inch and 12-inch cast iron force mains, and completing stormwater improvements including exfiltration trench, high-performance polypropylene pipe, and a 48-inch inline check valve. The project is located at 3102-3150 Taft Street, Hollywood, Florida 33021. The bid form includes 34 line items and three allowance line items totaling $1.81 million for permits and fees, undefined conditions, and special inspector costs.
The contract term is 780 calendar days from award, with substantial completion in 720 days and final completion in 780 days. The City reserves the right to extend the contract for up to 120 additional days. A bid guaranty equal to 5% of the bid amount is required, and the successful bidder must furnish performance and payment bonds each equal to 100% of the contract price. Required coverage includes Commercial General Liability of $2.0 million per occurrence and $5.0 million aggregate, Commercial Automobile Liability of $1.0 million combined single limit, Workers' Compensation with Employers' Liability of $1.0 million per category, and Contractors' Pollution Liability of $1.0 million per claim, with the City named as additional insured. Pricing must include delivery and installation on an FOB Destination basis and remain valid for 120 days from solicitation opening. Bids are submitted through the OpenGov e-procurement portal, and an addendum revision is attached to the solicitation.
Opportunity text
Lift Station Improvements: 1. Replacement of 3 existing pumps and extended shaft motors with 4 dry pit submersible pumps and motors. 2. Construction of a new electrical room on the ground floor, complete with air-conditioning and lighting. 3. Addition of variable frequency drives (VFDs). 4. Replacement of all station piping and valves 5. Replacement od sump pumps. 6. Addition of flow meter, vault and accessories on the discharge force main. 7. Replacement of emergency generator with a skid-mounted generator in a sound attenuated enclosure with subbase, dual wall, diesel fuel storage tank. 8. Demolition of existing bulk diesel fuel storage tank and associated structure. 9. Replacement of all electrical gear, controls, and instruments. 10. Replacement of all interior and exterior lighting. 11. Removal of existing ventilation systems, and installation of new ventilation system including ductwork, stack, wet well ventilator and exhaust/supply fans. 12. Replacement of station roofing, exterior doors, and louvers. 13. Replacement of station monorail system. 14. Rehabilitation and specialty coating of wet well. 15. Interior and exterior painting of pump station structure. 16. Site work, including site restoration, perimeter fencing, access driveway, sidewalk installation, and landscaping. B. Force Main: 1. Installation of 20-inch epoxy lined, ductile iron force main from Lift Station W-27 to the existing 48-inch ductile iron force main on Taft Street. 2. Abandon-in-place existing 10-inch and 12-inch cast iron discharge force mains from Lift Station W-27 to the existing 48-inch ductile iron force main on Taft Street. C. Stormwater Improvements: 1. Installation of approximately 300 linear feet of exfiltration trench on Roosevelt Street;. 2. Installation of approximately 450 linear feet of 24-inch high performance polypropylene pipe in North 31st Road, extending from Roosevelt Street to Taft Street, then extending east on Taft Street until the alley directly west of Rotary Park. 3. Installation of approximately 350 linear feet of 15-inch high performance polypropylene pipe in the alley directly west of Rotary Park to Arthur Street. 4. Installation of a 48-inch inline check valve and access structure on the existing 48-inch reinforced concrete pipe that discharges to the C-10 canal on Arthur Street.