Lift station #24 – electrical panel replacement and upgrade

Closed State & local contract opportunity Posted

Solicitation number
UT26-04A
State
Florida
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from palmbayflorida.bonfirehub.com. Updated .

About this opportunity

Brevard County, Florida is procuring electrical contractor services for the replacement and upgrade of the electrical control panel at Lift Station #24 through a competitive sealed bid process. The project involves removing the existing electrical control panel and installing a new, fully functional, code-compliant panel to support wastewater pumping operations. The contractor must furnish all labor, supervision, materials, equipment, tools, and permits necessary to complete the work, including reconnection of existing pumps, motors, floats, alarms, and ancillary equipment to the new panel. Deliverables include comprehensive testing and commissioning of the new panel, verification of proper operation of all controls and safety features, updated panel schematics, wiring diagrams, equipment cut sheets, warranty documentation, and as-built drawings. All work must be completed within 60 days of purchase order issuance, with work hours restricted to 7:00 a.m. through 4:00 p.m., Monday through Friday. The contractor must comply with all applicable federal, state, and local codes, NEC standards, OSHA requirements, and City specifications, and is responsible for obtaining all necessary permits and coordinating utility locates through Sunshine 811. The deadline for proposal submission is February 27, 2026, with the opportunity having been posted on February 13, 2026.

Pricing for this project is based on Brevard County Schools Contract 21-656-B-JW for Electrical Contractor Services, with line item pricing required for the electric panel, materials, labor costs broken down by position and hourly rates, and a markup not to exceed 15% of the panel and materials combined. The specific budget range or award value is not disclosed in the procurement documents. Specific set-aside designations or restrictions on respondent eligibility are not detailed in the available documentation. The contractor bears full responsibility for site safety, including implementation of warning signs, safety precautions, jobsite cleanup, and proper debris disposal. No incumbent vendors or current contractors are listed in the procurement materials, and the project involves integration with existing wastewater infrastructure and equipment at the lift station facility.

Opportunity text

Replacing the existing lift station electrical control panel with a new, fully functional, code-compliant panel.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity