Lehi City Olympic Park Playground RFP
Closed State & local contract opportunity Posted
- Solicitation number
- Lehi 2026-08
- State
- Utah
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 805 Sporting Goods, Athletic Equipment And Athletic Facility Equipment
- 650 Park, Playground, Recreational Area And Swimming Pool Equipment And Supplies
- 65012 Climbers, Playground
- 65018 Combination Sets, Playground
- 65072 Swings, Playground
- 65038 Playground Equipment (Not Otherwise Classified) (See 420-04 For Bleachers)
- 65060 Slides, Playground
- 65054 Seesaws, Playground
- 90916 Athletic Facility Construction
- 98863 Park Area Construction/Renovation
- UNSPSC codes
- 49241502 Playground climbing apparatus
- 49241507 Playground sandboxes
- 49241501 Playground swings
- 49241504 Playground slides
- 49221532 Playground system
- 49241505 Playground see saws
- 72153103 Playground construction and equipment installation service
- 49000000 Sports and Recreational Equipment and Supplies and Accessories
- 49240000 Recreation and playground and swimming and spa equipment and supplies
- 49241500 Playground equipment
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
Lehi City Corporation is requesting proposals for design, procurement, and supervised installation of a replacement playground system and engineered wood fiber surfacing at Olympic Park, 2700 W Parkside Dr, Lehi, Utah, with responses due October 23, 2026 at 5:00 p.m. MST. No set-asides or preference programs apply.
The scope covers complete playground replacement for the 5–12 year age group within approximately 2,500 square feet (58' × 44'), with all equipment required to meet or exceed current CPSC, ASTM, IPEMA, and ADA guidelines. The City will remove the existing playground structure, including footings and surfacing, prior to contractor work. Respondents must remove remaining existing elements, provide installation supervision from the manufacturer or certified representative, supply protective temporary fencing, and deliver manufacturer's warranty documentation upon completion. The project must be completed no later than April 30, 2027.
The maximum dollar allocation is $115,000. Bid proposals must include itemized cost breakdowns separating equipment, surfacing, freight, and installation costs, with all pricing remaining firm throughout the contract duration. Responses must include transmittal letters, project team qualifications, client references with previous work examples, detailed timelines, and GAAP-compliant financial reports from the past three fiscal years.
Evaluation criteria include contractor qualifications, professional reputation, quality of goods and services, financial resources, schedule availability, ability to provide future maintenance, and proposed pricing. The City reserves the right to reject any or all proposals and to negotiate elements if deemed in the City's best interest. Proposals are submitted electronically through the Bonfire platform. Supporting site plan and photographic reference documents are attached.
Opportunity text
Playground replacement at Olympic Park 2700 W Parkside Dr, Lehi, UT 84043
Files
| File | Type | Posted |
|---|---|---|
| 3-Olympic North.JPG | JPG image | |
| 2-Olympic Overhead.JPG | JPG image | |
| 1-Olympic Park RFP.pdf | ||
| 4-Olympic South.JPG | JPG image |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity