Large Meter and Advanced Metering Infrastructure (AMI) Device Installation
Closed State & local contract opportunity Posted
- Solicitation number
- PE-33561-NONST-2025-000000028
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 81584 Valves, Temperature And Pressure Regulating
- 81590 Water Gauges, Columns, Etc.
- 89044 Meters, Water
- 89045 Meter Fittings, Water, Accessories, Parts, And Conversion Kits
- 89046 Meter Reading Devices
- 91063 Public Utilities: Water, Sewer And Gas Maintenance And Repair
- 96185 Utility Services, Water
- 96246 Installation And Removal Services (Not Otherwise Classified)
- UNSPSC codes
- 23201004 Wetted wall column
- 23201005 Bubble columns
- 83100000 Utilities
- 83101601 Supply of natural gas
- 83101603 Oil pipeline services
- 83101802 Supply of two phase electricity
- 83101803 Supply of three phase electricity
- 39121800 Intelligent Building Installations IBI
- 81102400 Electrical power transmission engineering
- 83101800 Electric utilities
Show all 28
- 70171607 Water pricing services
- 83101604 Gas pipeline services
- 83101801 Supply of single phase electricity
- 40141602 Needle valves
- 41112504 Water meters
- 81141508 Meter proving production test
- 41112505 Water meter spares
- 43221733 Remote automatic meter reading system
- 83101500 Water and sewer utilities
- 83101600 Oil and gas utilities
- 83101510 Chilled water
- 83101602 Supply of fuel oil
- 83101605 Gas facility charge
- 83101804 Electric power transmission services
- 83101805 Industrial electric power distribution
- 83101806 Rural electrical power distribution
- 83101807 Municipal electric power distribution
- 56131700 Merchandiser installation hardware, shelving systems and accessories
- Point of contact
-
- Gene Inman ginman@maconwater.org (478) 464-5635
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Macon Water Authority is seeking Statements of Qualifications from firms to provide installation services for a Large Meter and Advanced Metering Infrastructure (AMI) Device Installation Project in Macon, Georgia. The procurement involves labor services to install approximately 2,200 water meters within the authority's service area, specifically in Bibb County. Key objectives include replacing existing water meters with new AMI-enabled large meters, with the AMI system hardware being separately purchased from Neptune Technology Group. Interested firms must submit their qualifications by June 24, 2025, with the potential to be shortlisted and invited for an interview. Evaluation will likely focus on the firm's technical capabilities, experience with large-scale water meter installations, and demonstrated expertise in AMI deployment. Prospective bidders can obtain Request for Qualifications (RFQ) documents by contacting Gene Inman, Project Manager, at ginman@maconwater.org or by accessing the documents on the Macon Water Authority website at www.maconwater.org/mwa-project-bid-documents. The Macon Water Authority reserves the right to reject any or all proposals and to waive technicalities and informalities.
While no specific set-aside designations or restrictions on respondent types are explicitly mentioned in the documentation, the preliminary engineer's budgetary estimate for the project is $3,500,000.00, excluding optional bid items. The procurement appears to be open to qualified professional engineering and installation firms with specific expertise in water meter infrastructure and AMI technology. No incumbent vendors are identified in the current documentation, and the project involves integrating new AMI devices with existing water infrastructure in the Macon Water Authority's service area. The authority will be purchasing the AMI system hardware separately through Neptune Technology Group, which suggests a potential existing technological framework that new installers will need to successfully integrate with. Firms responding to this RFQ should be prepared to demonstrate technical competence, previous successful large-scale meter installation projects, and the capability to complete the comprehensive installation of 2,200 water meters within the specified project parameters.
Opportunity text
The Macon Water Authority is soliciting Statements of Qualifications from firms interested in providing installation services for the Large Meter and Advanced Metering Infrastructure (AMI) Device Installation Project in Macon, Georgia. This Request for Proposal (RFP) seeks to identify potential providers of the above-mentioned services. Some Firms that respond to the RFP, who are determined by the Owner to be especially qualified, may be shortlisted and may be invited to an interview for these services. Scope of Services: The Project consists of labor services to install approximately 2,200 water meters within the Owner¿s service area. The Owner is purchasing the AMI system hardware through a separate agreement with Neptune Technology Group. RFQ documents may be obtained by contacting: Macon Water Authority Gene Inman, Project Manager ginman@maconwater.org Copies may also be found on the Macon Water Authority website, www.maconwater.org/mwa-project-bid-documents. The owner reserves the right to reject any or all RFPs, and to waive technicalities, and informalities. The Macon Water Authority, Ron Shipman, Executive Director & President.
Files
| File | Type | Posted |
|---|---|---|
| MWA AMI_Ad_04_23_25.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity