MWA AMI_Ad_04_23_25.pdf

PDF 80 KB Posted

Attached to
Large Meter and Advanced Metering Infrastructure (AMI) Device Installation
Solicitation number
PE-33561-NONST-2025-000000028
Issued by
Bibb County, Georgia

About this file

The document is an Advertisement for Request for Proposals (RFP) issued by the Macon Water Authority (MWA) in Georgia, seeking installation services for Advanced Metering Infrastructure (AMI)-enabled large water meters. The project involves labor services to install approximately 2,200 water meters within the MWA's service area, with the AMI system hardware being purchased separately through Neptune Technology Group. The RFP aims to identify and shortlist qualified firms, who may be invited to an interview for the installation services.

The preliminary engineer's budgetary estimate for the project is $3,500,000.00, excluding optional bid items. Interested firms can obtain RFQ documents by contacting Gene Inman, Project Manager, at ginman@maconwater.org or by accessing the documents on the Macon Water Authority website at www.maconwater.org/mwa-project-bid-documents. The MWA reserves the right to reject any or all RFPs and to waive technicalities and informalities, providing flexibility in the selection process.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MACON WATER AUTHORITY

ADVERTISEMENT FOR REQUEST FOR PROPOSALS FOR

INSTALLATION SERVICES FOR AMI-ENABLED LARGE WATER

METERS

The Macon Water Authority is soliciting Statements of Qualifications from firms interested in providing installation services for the Large Meter and Advanced Metering Infrastructure (AMI) Device Installation Project in Macon, Georgia. This Request for Proposal (RFP) seeks to identify potential providers of the above-mentioned services. Some Firms that respond to the RFP, who are determined by the Owner to be especially qualified, may be shortlisted and may be invited to an interview for these services.

Scope of Services

The Project consists of labor services to install approximately 2,200 water meters within the Owner’s service area. The Owner is purchasing the AMI system hardware through a separate agreement with Neptune Technology Group.

The preliminary engineer’s budgetary estimate for the project is $3,500,000.00, excluding Optional Bid Items listed in the pricing tables of the RFP.

RFQ documents may be obtained by contacting:

Macon Water Authority

Gene Inman, Project Manager ginman@maconwater.org

Copies may also be found on the Macon Water Authority website, www.maconwater.org/mwa-project-bid-documents.

The owner reserves the right to reject any or all RFPs, and to waive technicalities, and informalities.

mailto:ginman@maconwater.org http://www.maconwater.org/mwa-project-bid-documents

File details come from the government source that posted it. Updated .