GSC_Lambdin_Chiller_100_CD_NBP.pdf
PDF 1 MB Posted
- Attached to
- Lambdin Hall chiller replacement
- Solicitation number
- PE-57600-RFQ-2027-000000016
- Issued by
- Jones County, Georgia
About this file
This is a set of 100% Construction Documents prepared by NBP Engineers, Inc. for Gordon State College's Lambdin Hall Chiller Replacement project located in Barnesville, Georgia. The project involves the replacement of an air-cooled chiller system and includes demolition and new work across the mechanical yard on the first floor and the mechanical room on the third floor. The scope encompasses HVAC work including chiller replacement, piping modifications, pump installations with variable frequency drive (VFD) controls, expansion tank installation, and associated controls and instrumentation. Electrical work includes new disconnects, circuit breakers, conduit routing, and connections to support the new chiller and VFD equipment. The construction documents are dated October 29, 2026, and represent the final design phase for bidding and construction purposes.
The documents include detailed mechanical and electrical drawings showing demolition plans, new work layouts, piping schematics, equipment schedules, and electrical single-line diagrams. Key equipment specifications include two redundant end-suction pumps (P-1 and P-2) rated at 70 GPM with VFD controls, a Carrier 30RC air-cooled chiller with nominal capacity of 120 tons, Armstrong pumps with BACnet/MSTP communication capability, and new electrical service upgrades including an 800-amp fused disconnect and 800-amp/3-phase breaker. The project consultant is NBP Engineers, Inc., located in Macon, Georgia, with a Certificate of Authorization expiring June 30, 2028. The drawings note that existing conditions were documented to the best of the engineer's knowledge, but discrepancies between design documents and actual site conditions should be reported to the design professional and owner prior to performing work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gordon State Lambdin Hall Chiller_Project Man.pdf | ||
| Invitation to Bid.pdf | ||
| Gordon State Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX OF
DRAWINGS
PROJECT CONSULTANTS
NBP ENGINEERS, INC.
MACON, GEORGIA316 CORPORATE PARKWAY
NBP
ENGINEERS
CONSULTANTS
478-745-1691 www.nbpengineers.com
PROJECT No. 26056
BARNESVILLE, GEORGIA
TITLESHEET NO.
M10
ABBREVIATIONS, LEGENDS, & SCHEDULES - HVAC
M30
M00
PARTIAL FIRST FLOOR /MECH. YARD - DEMOLITION & NEW WORK - HVAC
M20 PARTIAL THIRD FLOOR MECH. RM. - DEMOLITION & NEW WORK - HVAC
CHILLED WATER PIPING SCHEMATIC - DEMOLTION & NEW WORK - HVAC
E00
E10 PARTIAL FIRST FLOOR /MECH. YARD - DEMOLITION & NEW WORK - ELEC
E20 PARTIAL THIRD FLOOR MECH. RM. - DEMOLITION & NEW WORK - ELEC
LEGEND, & RISER - ELECTRICAL
LAMBDIN HALL - CHILLER REPLACEMENT
GORDON STATE COLLEGE
10.29.2026 100% CONSTRUCTION DOCUMENTS
P:\26056\26056m00.dgn
DATE PLOTTED
DGN FILE
28-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26056\26056m00.dgn
AS SHOWN
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
L A
M B
D
IN
H
A L L C
H
IL
L E
R R
E P
L A
C E
M E
N T
B a rn e s v il le
G e o rg ia
LTF
DRH
10.29.2026
26056
DRH
C O
N S T
R U
C T
IO
N
D
C U
M E
N T S
M00
SCHEDULES - HVAC
LEGENDS, &
ABBREVIATIONS,
A COMPRESSED AIR
AAV AUTOMATIC AIR VENT
AF AIR FOIL
-AFF ABOVE FINISHED FLOOR
AV ACID VENT
AVD AUTOMATIC VOLUME DAMPER
AW ACID WASTE
-AC ABOVE CEILING
AH- AIR HANDLING UNIT
BBD BOILER BLOW DOWN
BE BOTTOM ELEVATION
BOL BOTTOM OF LINE (UNINSULATED)
BOD BOTTOM OF DUCT
BP- BOOSTER PUMP
BTUH BRITISH THERMAL UNIT PER HOUR
-BF BELOW FLOOR
BFP BACK FLOW PREVENTOR
C CONDUIT
CC COOLING COIL
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CAB CABINET FAN
CF CENTRIFICAL FAN
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CFT CHEMICAL FEED TANK
CH CABINET HEATER
CHR CHILLER
CL CENTER LINE
CO CLEANOUT
CP CHILLER PUMP
CPHB CHROME PLATED HOSE BIBB
CT COOLING TOWER
CU COPPER
CV- CONVECTOR
Cv VALVE COEFFICIENT
D DRAIN
DDC DIRECT DIGITAL CONTROL
DHW DOMESTIC HOT WATER
DN DOWN
DP DIFFERENTIAL PRESSURE
DS DOWN SPOUT
DSO DOWN SPOUT OVER FLOW
DX DIRECT EXCHANGE
EAD EXHAUST AIR DAMPER
EAT ENTERING AIR TEMPERATURE
EDB ENTERING DRY BULB
EWB ENTERING WET BULB
ESP END SUCTION PUMP
ESP EXTERNAL STATIC PRESSURE
ELL ELBOW
ET EXPANSION TANK
EQT EQUIPMENT TRAP SET
EWT ENTERING WATER TEMPERATURE
EX EXPANSION TANK LINE
EXT EXTERNAL
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
F&BP FACE & BYPASS
FC FAN COIL UNIT
BPD BYPASS DAMPER
EAL EXHAUST AIR LOUVER
ECH ELECTRIC CABINET HEATER
ABBREVIATIONS
FD FLOOR DRAIN
FF FOULING FACTOR
FF- FLY FAN
FF FINISHED FLOOR
FF FINAL FILTER
FFM FIRE FLOW METER
FLEX FLEXIBLE
FM FIRE MAIN
FMS FLOW METER STATION
FOF FUEL OIL FLOW
FOR FUEL OIL RETURN
FOV FUEL OIL VENT
FOP FUEL OIL PUMP
FP FIRE PUMP
FP- FAN POWERED
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRT FLOW RATE TRANSMITTER
FT FEET
G LOW PRESSURE GAS
GA GAUGE
GPM GALLONS PER MINUTE
GT GREASE TRAP
GTH GRAND TOTAL HEAT
H HEIGHT
HC HEATING COIL
HB HOSE BIBB
HBT HORIZONTAL BLOW THROUGH
HD HUB DRAIN
HDT HORIZONTAL DRAW THROUGH
HP HORSEPOWER/HIGH PRESSURE
HPA HIGH PRESSURE AIR
HPG HIGH PRESSURE GAS
HPS HIGH PRESSURE STEAM
HPWS HEAT PUMP WATER SUPPLY
HPWR HEAT PUMP WATER RETURN
HSC HORIZONTAL SPLIT CASE
HWG HOT WATER GENERATOR
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
ILC IN-LINE CENTRIFICAL
IT INTERVAL TIMER
IN INCHES
INV INVERT
JB JUNCTION BOX
L LENGTH
LR LONG RADIUS
LAT LEAVING AIR TEMPERATURE
LCP LOCAL CONTROL PANEL
LDB LEAVING DRY BULB
LN LIQUID NITROGEN
LWB LEAVING WET BULB
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM
MAV MANUAL AIR VENT
MVD MANUAL VOLUME DAMPER
MAX MAXIMUM
MBH ONE THOUSAND BTUH PER HOUR
MCC MOTOR CONTROL CENTER
MIN MINIMUM
MH MAN HOLE
MP SUMP (MUD) PUMP
MPS MEDIUM PRESSURE STEAM
MPR MEDIUM PRESSURE RETURN
MTS MEDIUM TEMPERATURE SUPPLY
MTR MEDIUM TEMPERATURE RETURN
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MZ MULTIZONE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTSIDE AIR DAMPER
ODT OUTDOOR TEMPERATURE
PC PUMP CONDENSATE
PD PRESSURE DROP
PRV PRESSURE REDUCING VALVE
PWF PROPELLER WALL FAN
R REFRIGERANT
RA RETURN AIR
RAD RETURN AIR DAMPER
RAS RELIEF AIR SUPPLY
RP RECIRCULATING PUMP
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RD ROOF DRAIN
RV RELIEF VALVE
SR SHORT RADIUS
OAL OUTSIDE AIR LOUVER
SAN SANITARY SEWER
SC SILL COCK
SCD SMOKE DAMPER
SD STORM DRAIN
SD SMOKE DETECTOR
SF SQUARE FEET
SDO STORM DRAIN OVERFLOW
SHC SENSIBLE HEAT CAPACITY
SP STAND PIPE
SP SUMP PUMP
SPS STATIC PRESSURE SENSOR
STA STATION
TR TEMPERED WATER RETURN
UG UNDERGROUND
VAC VACUUM PIPING
VDT VERTICAL DRAW THROUGH
VTR VENT THROUGH ROOF
WB WET BULB
O2 OXYGEN
F DEGREES FAHRE C DEGREES CENTI
WM WATER METER
WL WATER LINE
WH WATER HEATER
WG WATER GAUGE
W WIDTH
W WASTE
VT VERTICAL TURBINE
VFD VARIABLE FREQUENCY DRIVE
VB VACUUM BREAKER
VAV VARIABLE AIR VOLUME
V VENT
UC UNDERCUT (DOOR - 3/4")
V- VALVE
TOS TOP OF STRUCTURE
TB THRUST BLOCK
T TEMPERED WATER
STR STRAINER
SP STATIC PRESSURE
SP SPRINKLER PIPE
SG SPECIALTY GAS
EUH ELECTRIC UNIT HEATER
RECIRCULATING
DHR DOMESTIC HOT WATER
TRANSMITTER
DPT DIFFERENTIAL PRESSURE
PER MINUTE
SCIM STANDARD CUBIC INCHES
TEMPERATURE
SST SATURATED SUCTION
(UNINSULATED)
TE TOP ELEVATION
(TOWER) PUMP
TP CONDENSER WATER
FSD FIRE/SMOKE DAMPER
EA EXHAUST AIR
MA MIXED AIR
AE ADJUSTABLE AIR EXTRACTOR
RAO RETURN AIR OPENING
AD AREA DRAIN/ACCESS DOOR
SPS
SD
COMBINATION STARTER
STARTER
PIPE SLEEVE
CONCENTRIC REDUCER
PIPE ANCHOR
HVAC LEGEND
BALL VALVE WITH
3/4" HOSE END
BALANCE VALVE
THREADED & FLANGED
GLOBE VALVE
CHECK VALVE
3-WAY MIXING VALVE
BALL VALVE
BUTTERFLY VALVE
SOLENOID VALVE
CONTROL VALVE
PLAN VIEW
2-WAY MOTORIZED VALVE
RELIEF VALVE
FLANGED UNION
BRANCH OUT TOP
STRAINER
BRANCH OUT BOTTOM
ELBOW DOWN
ELBOW UP
TEE OUT TOP
BLIND FLANGE
PIPE CAP
AUTOMATIC AIR VENTAAV
FLEX. PIPE CONN.
BACKFLOW PREVENTER
THERMOMETER
TEE OUT BOTTOM
MANUAL AIR VENT
PIPE TEST PLUG
HEATING WATER FLOW
COLD WATER DOMESTIC
NATURAL GAS
CONDENSER WATER FLOW
DRAIN
HEATING WATER RETURN
HOT WATER DOMESTIC
G
D
DUCT SIZE FIRST DIMENSION
IS SIDE SHOWN
24\12
DOOR GRILLE
REFERS TO DETAIL OR
PLAN ON SHEET M-1.THERMOSTAT
INTERVAL TIMER
T
I.T.
1\M-4
DUCT/PLENUM w/LINER
FIRE DAMPER
ELBOW WITH
TURNING VANES
FLEX. DUCT CONN.
TURNING VANES
ELBOW WITHOUT
ADJUSTABLE AIR
EXTRACTOR
INSULATED FLEX. DUCT
INSULATED FLEX. DUCT
c
ECCENTRIC REDUCER
HWS
HWR
SCHS
SCHR
CONDENSER WATER RETURN
CS
CR
STATIC PRESSURE SENSOR
SMOKE DETECTOR
POINT OF CONNECTION
DUCT SPLIT
THREADED & FLANGED
THREADED & FLANGED
UNION
GAUGE TAPPING
GAUGE WITH TAPPING
THREADED & FLANGED
THREADED & FLANGED
PIPE SOCKET WELL
FLOW INDICATOR BALANCER
M
T G THERMOSTAT w/GROUND
ANNULAR ELEMENT FLOW STATION
M
DAMPER - BLADE VIEW DAMPER - END VIEW
xx{K OR xx/xx}K ROUND OR FLAT OVAL DUCT (K)
DOUBLE WALL INSULATED
ROUND OR FLAT OVAL DUCTxx{ OR xx/xx}
CHILLED WATER FLOW
CHILLED WATER RETURN
CHS
CHR
WATER SUPPLY
SECONDARY CHILLED
WATER RETURN
SECONDARY CHILLED
CV
CVA
CONSTANT VOLUME
ADJUSTABLE
CONSTANT VOLUME
CFM
PRESSURE SENSOR
NOTIFY DESIGN PROFESSIONAL AND OWNER OF ANY DISCREPANCIES PRIOR TO PERFORMING ANY WORK.
IS ANTICIPATED THERE ARE DISCREPANCIES VERSUS THE AS-BUILT CONDITIONS. CONTRACT TO IDENTIFY AND
SURVEYS. THESE DOCUMENTS REFLECT EXISTING CONDITIONS TO THE BEST OF OUR KNOWLEDGE. HOWEVER, IT
THESE DRAWINGS HAVE BEEN PRODUCED UTILIZING A COMBINATION OF ORIGINAL DESIGN DOCUMENTS AND FIELD
MINIMUM
CAPACITY-MBH
RATING
EWT LWT
WATER
FLOW-GPM
EVAPORATOR DATA
MAXIMUM PRESSURE
DROP-FT-H O
FOULING
FACTOR
MAX. TOTAL
INPUT
ELECTRICAL DATA
KW
MARK VOLTAGE/PHASE/HERTZ
EACH
REMARKS
AIR COOLED CHILLER SCHEDULE
MIN.
IPLV
CHR-1
MANUFACTURERS
YORK TRANE
NOTES:
MINIMUM
TONS
NOM. CAPACITY
MARK SERVICE
TYPE
PUMP
GPM APPROX.
FT.H O
MAX. MIN.
EFF.%
REMARKS
2 B&G(EA.) HP
MANUFACTURERS
PUMP SCHEDULE
PATTERSON
RPM
56 42 120 0.0001 79.2 208/3/60 15.9 YLAA CGAM 1 2
NOTES:
1 PUMPS ARE N+1 REDUNDANT.
P-1
P-2
CHILLED WATER
CHILLED WATER
ES
ES
5.0
5.0
E1510-2BD
E1510-2BD
VFD
VFD
UNIT MUST HAVE A BACNET/MSTP COMMUNICATION CARD.
UNIT COMPRESSORS MUST HAVE HIGH HOT GAS BYPASS AND VARIABLE SPEED CONDENSER FAN(S) ON LEAD CIRCUIT.
HVES-1.5BA
HVES-1.5BA
70 839 15.3
CARRIER
30RC
ARMSTRONG
4030-3X1.5X8
4030-3X1.5X8
P:\26056\26056m10.dgn
DGN FILE
28-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26056\26056m10.dgn
AS SHOWN
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
L A
M B
D
IN
H
A L L C
H
IL
L E
R R
E P
L A
C E
M E
N T
B a rn e s v il le
G e o rg ia
LTF
DRH
10.29.2026
26056
DRH
N S T
R U
C T
C U
M E
N T S
1 12
STAIR 2
1 1 1
MECH. YARD
1 13
MECH. SHAFT
1 12
STAIR 2
1 1 1
MECH. YARD
1 13
MECH. SHAFT
GENERATOR
EXISTING
FF
CHR
CHS
4"
4" UP
PIPE SLEEVE
(TYPICAL)
PIPE SUPPORT
CONCRETE
EXISTING CONCRETE PAD
"C
H S
"C
H R
M10
SCALE:
= 1'-0
4 0 2 4 8
N
GENERATOR
EXISTING
FF
PARTIAL FIRST FLOOR/MECHANICAL YARD - DEMOLITION - HVAC
CHR
CHS
4"
4" UP
PIPE SLEEVE
(TYPICAL)
PIPE SUPPORT
CONCRETE
S Y
S T
E M
G R
A P
H
IC
IS
P L
A Y
S T
A R
T
S T
O P
E N
A B
L E
D
IS
A B
L E
O P
E N
C L
O S
E
S T
A R
T
S T
P
A
K E
U P
S E
T P
O
IN
T
A
J
U S
T
D
N T
R O
L
D
IF
F E
R E
N T
IA
L
P
R E S
S U
R E
P R
E S
S U
R E
S
W
IT
C H
A U
X
IL
IA
Y
N T
A C
T
A L
A
N T
A C
T
T E
M P
E R
A T
U R
E
R E
L A
T
IV
U
M
ID
IT
Y
P R
E S
S U
R E
H
IG
H
L
W
L
IM
IT
R
T A
L
IZ
A T
IO
N
P R
O P
O R
T
IO
N A
L
P R
O P
IN
T E
G R
A L
T
IM
E
S
C H
E D
U L
E
S
S
O P
T
IM
A R
T
S T
O P
D A
Y
N
IG
T B
A C
K
D E
M A
IT
C Y
C L
E
R E S
T
IM
IZ
A T
IO
N
E C
O N
O M
IZ
E R
F A
IL
U
D E (S
T E S
A
N D
N O
T E S
OUTPUTS INPUTS SOFTWARE
DDC PANELS
INPUT/OUTPUT
SUMMARIES
DIGITAL ANALOG ANALOG ALARM DDC ENERGY MGMT.DIGITAL
C U
R R
E
L A
Y
D R
IV
E
S
T A
T U
S
S P
E E
D
IN
D
IC
A T
IO
N
S P
E
N T
R O
L
E
W
IT
C H
C O
C A
L C
U L
A T
IN
T
P O
S
IT
IO
N
IN
D
IC
A T
IO
N
O P
E N
C L
O S
S
IT
IO
N
ACP
S T
A T
U S
T R
E
G
LOGS
F
E N
F U
O S
E
CHILLED WATER SYSTEM
TAG POINT DESCRIPTION
CHR-1 CHILLER
CCHILLER PUMPS - VFD CONTROL
1. FAILURE MODES:
2. WHERE FAILURE MODE IS INDICATED, THE INDICATED POSITION SHALL OCCUR ON INTERRUPTION OF
ELECTRIC POWER TO THE DDC PANEL.
L - LAST COMMAND
O - OPEN OR ON
C - CLOSE OR OFF
W A
T
F
O W
INPUT/OUTPUT NOTES:
CP-1
HT HEAT TRACE
DI
HT
SCALE:
= 1'-0
4 0 2 4 8
N
NEW WORK - HVAC
DEMOLITION &
FLOOR/MECH YARD -
PARTIAL FIRST
LINE LEGEND
POINT OF CONNECTION
NEW WORK
EXISTING TO REMAIN
DEMOLITION
NOTES:(THIS SHEET ONLY)
PARTIAL FIRST FLOOR/MECHANICAL YARD - NEW WORK - HVAC
NEW BUTTERFLY VALVE (TYP)
TRACE TO ALL EXPOSED CH PIPING
APPLY NEW HYDRONIC HEAT
EXISTING CONCRETE PAD
TO BE REPLACED IN NEW WORK
REMOVE EXISTING HEAT TRACE;
"C
H S
"C
H R
CHR-1
NEW CHILLER
& REPLACED IN NEW WORK
TO CHILLER TO BE REMOVED
EXISTING VALVES & PIPING
NEW 4" RUNOUT WITH BUTTERFLY VALVE AND BLIND FLANGE FOR
FUTURE CONNECTION OF TEMPORARY CHILLER.
PROVIDE NEW PIPE SUPPORTS WITH CONCRETE BASE AS REQUIRED.
CHILLER
AIR COOLED
EXISTING
REMOVE
CONCRETE PAD
ON EXISTING
AI AODI DO
CHR-1
CHR-1
CHILLED WATER FLOW DIAGRAM - HVAC
NOT TO SCALE
C H S
C H
R
4"
CHR-
PIPING AT CHILLER YARD
HEAT TRACE ALL EXPOSED
P:\26056\26056m20.dgn
DGN FILE
28-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26056\26056m20.dgn
AS SHOWN
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
L A
M B
D
IN
H
A L L C
H
IL
L E
R R
E P
L A
C E
M E
N T
B a rn e s v il le
G e o rg ia
LTF
DRH
10.29.2026
26056
DRH
N S T
R U
C T
C U
M E
N T S
T T
SD
T
P
S
24"{
AP
AP
72/30
C ƒ"
4"
3"
VFD-1 VFD-2
4"CHR
4"CHS
FDFD
AHU-1
2"CHR
2"CHS
1‚"HWS
1‚"HWR
2"
1‚"
4"
CHR
DDCICS
C H S
M U
W
ABOVE SA DUCT
48"X60" w/FD
4" DN
80/80
L-1
(TYPICAL)
PIPE SLEEVE
TANK
EXPANSION
SUPPORT (TYP)
6"x4" CONCRETE
COOLING COIL
ACCESS
MIXING BOX
FILTER
PREHEAT COIL
FAN
DAMPER CONTROLLER
VENTURI
M20
SCALE:
= 1'-0
4 0 2 4 8
N
T T
SD
T
P
S
24"{
AP
AP
72/30
C
1"CF ƒ"
4"
3"
P-1
P-2
VFD-1 VFD-2
4"CHR
4"CHS
FDFD
AHU-1
2"CHR
2"CHS
1‚"HWS
1‚"HWR
2"
1‚"
4"
CHR
DDCICS
C H S
M U
W
ABOVE SA DUCT
48"X60" w/FD
4" DN
PARTIAL THIRD FLOOR MECHANICAL ROOM - DEMOLITION - HVAC
80/80
L-1
(TYPICAL)
PIPE SLEEVE
TANK
EXPANSION
CHEMICAL FEED
SCALE:
= 1'-0
4 0 2 4 8
N
PARTIAL THIRD FLOOR MECHANICAL ROOM - NEW WORK - HVAC
NEW WORK - HVAC
DEMOLITION &
FLOOR MECH. RM. -
PARTIAL THIRD
LINE LEGEND
POINT OF CONNECTION
NEW WORK
EXISTING TO REMAIN
DEMOLITION
AIR SEPARATOR
SUPPORT (TYP)
6"x4" CONCRETE
COOLING COIL
ACCESS
MIXING BOX
FILTER
PREHEAT COIL
FAN
DAMPER CONTROLLER
VENTURI
NOTES:(THIS SHEET ONLY)
REMOVE EXISTING PUMP, ISOLATION VALVE, TRIPLE DUTY VALVE,
FLEX CONNECTORS, STRAINER, CONTROLS, GAUGES, AND
ASSOCIATED STARTER FOR REPLACEMENT IN NEW WORK.
REMOVE EXISTING CHEMICAL FEEDER FOR REPLACEMENT
IN NEW WORK.
NEW VFD ON WALL.
NEW P-2 ON EXISTING CONCRETE PAD, REFER TO DETAIL.
P-1
P-2
NEW P-1 ON EXISTING CONCRETE PAD, REFER TO DETAIL.
CHEMICAL FEED
NEW
VFD P-2
P-1
VFD
P:\26056\26056m30.dgn
DGN FILE
28-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26056\26056m30.dgn
AS SHOWN
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
L A
M B
D
IN
H
A L L C
H
IL
L E
R R
E P
L A
C E
M E
N T
B a rn e s v il le
G e o rg ia
LTF
DRH
10.29.2026
26056
DRH
N S T
R U
C T
C U
M E
N T S
T
C H S
C H
R
AHU-1
E X
P
AAV
4" 4"
C H
R
C H
R
4" 4"
C H
RC
H
R
4"
4"
4"4"
CHR
ƒ" ƒ"
D
PRV
CW
1 ‚"
4"
4"
4"
4"
4"4"
AAV
AAV
CHR
T4"
CHR
CHS
2"4"
CHR
2"
4"
4" 1 •"
3"
C H
R C H S
3"
M U
PAN (TYPICAL)
SS DRAIN
PAD (TYPICAL)
CONCRETE
SENSOR (TYPICAL)
TEMPERATURE
VENTURI
INSIDE MECH. SHAFT
CHR/S PIPING DROP
M30
NOT TO SCALE
CHILLED WATER PIPING SCHEMATIC - DEMOLITION - HVAC
NEW WORK - HVAC
DEMOLITION &
PIPING SHEMATIC -
CHILLED WATER
T
C H S
C H
R
AHU-1
E
X P
AAV
P-1
2•"3"
2"
4" 4"
C H
R
C H
R
P-2
2•"
3"
2"
4" 4"
C H
RC
H
R
CF
CF
1"
4"
4"
4"4"
CHR
ƒ" ƒ"
D
PRV
CW
1 ‚"
4"
4"
4"
4"
4"4"
AAV
AAV
CHR
T4"
CHR
CHS
2"4"
CHR
2"
4"
4" 1 •"
3"
C H
R C H S
3"
M U
PAN (TYPICAL)
SS DRAIN
PAD (TYPICAL)
CONCRETE
CHEMICAL FEED
ONE SHOT
SENSOR (TYPICAL)
TEMPERATURE
VENTURI
INSIDE MECH. SHAFT
CHR/S PIPING DROP
NOT TO SCALE
CHILLED WATER PIPING SCHEMATIC - NEW WORK - HVAC
LINE LEGEND
POINT OF CONNECTION
NEW WORK
EXISTING TO REMAIN
DEMOLITION
EXTEND PAD AS REQUIRED FOR NEW WORK. REFER TO DETAIL.
NEW END SUCTION PUMP ON EXISTING CONCRETE PAD,
REPLACEMENT IN NEW WORK.
REMOVE EXISTING CHEMICAL FEEDER FOR
GAUGES, AND ASSOCIATED STARTER FOR REPLACEMENT IN NEW WORK.
TRIPLE DUTY VALVE, FLEX CONNECTORS, STRAINER, CONTROLS,
REMOVE EXISTING PUMP, ISOLATION VALVES,
NOTES:(THIS SHEET ONLY)
AIR COOLED CHILLER ISOMETRIC
DRAIN VALVE WITH HOSE
CONNECTION AT LOW POINT
M.A.V. AT
HIGH POINTS
(FOR ESTIMATING PURPOSES ONLY. PROVIDE PIPING ARRANGEMENT FOR UNIT FURNISHED.)
C H S
C H
R
CABLE ON PIPING
OUTDOORS ABOVE
GRADE
FLANGE ON GROUND
CONDUCTOR TO EVAPORATOR
ELECTRIC HEATING
WALL
AS SYSTEM PIPE.
MANUAL AIR VENT
TERMINATE DRAIN WITH HOSE END
CONNECTION 18" ABOVE FLOOR.
WHERE AIR VENTS OCCUR ABOVE ACCESSIBLE
CEILING. LOCATE VALVE AND TERMINATE DRAIN
HERE, UNLESS NOTED OTHERWISE AND POSITION
VALVE FOR VERTICAL DOWN DISCHARGE.
•" PIPE SAME MATERIAL
2•"
VERTICAL
PIPE
SUPPORT
WELDED PIPETHREADED / BRAISED
PIPING
BALL VALVE (EXPOSED) OR
GATE VALVE (CONCEALED)
ARRANGEMENT FOR LOCATIONS
WITH LIMITED CLEARANCE
6"MAX.
NOT TO SCALE
NOT TO SCALE
BRANCH CIRCUIT FROM
PANELBOARD,SWITCHGEAR,OR MCC
(2600)
SYSTEM SHOWN IN NORMAL (VFD NOT BYPASSED)
NUMBERS IN PARENTHESES INDICATE DIVISION
UNDER WHICH WORK OR EQUIPMENT IS SPECIFIED.
NOT TO SCALE
MODE, MOTOR RUNNING.
OVERLOAD
CIRCUIT
BREAKER
VFD SINGLE LINE DIAGRAM
VFD PACKAGE
RECTIFIER AND
INVERTER
NOTES:(THIS DETAIL ONLY)
TYPICAL END SUCTION PUMP
ELEVATION
FLEXIBLE CONNECTION
FLEXIBLE COUPLING AND
COUPLING GUARD
PIPE INSULATION
PRESSURE GAUGE
TEST PLUG
‚" BALL VALVE, TYPICAL
ADJUSTABLE FOOT
FULL SIZE BLOWDOWN ‚" DRAIN
TO FLOOR DRAIN
PAN (CHILLED WATER
PUMP(S) ONLY
18 GA. S.S. DRIP
2"
1"
SUCTION DIFFUSER
WITH STRAINER
BALL OR BUTTERFLY
•" DRAIN TAPPING
PIPE TO FLOOR DRAIN
CIRCUIT SETTER
NOT TO SCALE
(2600)
(2300)
MOTOR (2300)
EXISTING CONCRETE BASE
CHEMICAL FEED
NEW ONE SHOT
P-1 P-2
1"
CF
CF
3 3
A
BC
E
TO SYSTEM
B - ƒ" TO DISCHARGE OF PUMP.
C - ƒ" TO SUCTION OF PUMP.
F - RISER CLAMP. WELD TO 2X3/4 " FLAT
OFFSET BRACKET TO WALL.
A - CHEMICAL FEEDER TANK.
D - ƒ" TO FLOOR DRAIN.
D
4"MIN.
WELD
F
BALL VALVES
BY-PASS CHEMICAL FEEDER
NEW NEW
E - ‚" BALL VALVE FOR VENT.
NOT TO SCALE
P:\26056\26056e00.dgn
DGN FILE
28-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26056\26056e00.dgn
AS SHOWN
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
L A
M B
D
IN
H
A L L C
H
IL
L E
R R
E P
L A
C E
M E
N T
B a rn e s v il le
G e o rg ia
BCO
KMS
10.29.2026
26056
MJS
N S T
R U
C T
C U
M E
N T S
E00
ELECTRICAL
LEGEND, & RISER -
NOT TO SCALE
CONNECTION TO EQUIPMENT
CAP
CONDUIT DOWN
CONDUIT UP
RECEPTACLES
CIRCUITS
ELECTRICAL LEGEND
DUPLEX RECEPTACLE - NORMAL
QUAD - NORMAL
GFCI DUPLEX RECEPTACLE - NORMAL
GFCI QUAD - NORMAL
SPECIAL - TYPE NOTED OR SHOWN
WEATHER PROOF RECEPTACLE (GFCI)
ELECTRIC WATER COOLER RECEPTACLE(GFCI)
CONDUIT CONCEALED IN CEILING OR WALL
CONDUIT IN GROUND, SLAB, OR UNDER FLOOR
FLEXIBLE RACEWAY
RACEWAY EXPOSED
WP
AC
ABOVE COUNTER DUPLEX RECEPTACLE (COORDINATE
HEIGHT WITH ARCHITECT)DUPLEX RECEPTACLE - TAMPER PROOFT
HOMERUN - ONE ARROW PER CIRCUIT
WP
PANELBOARD-250 VAC OR LESS
SURFACE MOUNTED
PANELBOARD-250 VAC OR LESS
RECESSED
PANELBOARD-OVER 250 VAC
SURFACE MOUNTED
PANELBOARD-OVER 250 VAC
RECESSED
BACKBOARD
J
M
GENERAL EQUIPMENT
T
JJ
TRANSFORMER
FRAME AMPS/POLES/NEMA TYPE
FUSE PER MANUFACTURERS RECOMMENDATIONS
ENCLOSED BREAKER-RECESSED IN WALL
ENCLOSED CIRCUIT BREAKER
EMERGENCY PUSHBUTTON
COMBINATION STARTER AND DISCONNECT
EXHAUST FAN
MANUAL STARTER AND MOTOR RATED SWITCH
MOTOR
JUNCTION BOX - WALL/CEILING/FLOOR
SURGE SUPPRESSOR
DISCONNECT SWITCH: "F" IF FUSED
F
SLAB OR BELOW GRADE
GROUNDING CONDUCTOR- UNDER
G
C GROUND ROD - C IF CHEMICAL
GROUND CONNECTION (SCHEMATIC)
GROUNDING
PARTIAL POWER RISER
LB
EXISTING
CB
EXISTING
LGA
EXISTING
LC
EXISTING
CC
EXISTING
LAP
EXISTING
TCS
EXISTING
TCS
EXISTING
SIEMENS SWBD
EXISTING
CHILLER
NEW
FF
SAME LOCATION
BREAKER WITH NEW IN THE
REPLACE THE EXISTING 800A/3P
PUMPS
PANEL TO BE REUSED FOR THE NEW
THE EXISTING 40/3 BREAKERS IN THIS
F-CH-CNTRL
DISCONNECT
FUSED
NEW 30/3/3R
F-CH
DISCONNECT
FUSED
NEW 800/3/3R
LIQUIDTITE WITHIN 24".
1#4/0G IN 4" IMC. TRANSITION TO
ROUTE 3#600 KCMIL CU CONDUCTORS,
WITH PIPE SUPPORT ON 36" INTERVALS.
CHILLER MAY BE ROUTED ON GRADE
NEW CONDUIT FROM DISCONNECT TO
P:\26056\26056e10.dgn
DGN FILE
28-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26056\26056e10.dgn
AS SHOWN
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
L A
M B
D
IN
H
A L L C
H
IL
L E
R R
E P
L A
C E
M E
N T
B a rn e s v il le
G e o rg ia
BCO
KMS
10.29.2026
26056
MJS
N S T
R U
C T
C U
M E
N T S
1 12
STAIR 2
1 14
BREAK RM
MECH. 121
MECH.
MECH.
1 1 1
MECH. YARD
1 13
MECH. SHAFT
1 12
STAIR 2
1 14
BREAK RM
MECH. 121
MECH.
MECH.
1 1 1
MECH. YARD
1 13
MECH. SHAFT
GENERATOR
EXISTING
(TYPICAL)
PIPE SUPPORT
CONCRETE
EXISTING CONCRETE PAD
LGA
SWBD
EXISTING PULLBOX
CHR-1
NEW CHILLER
E10
SCALE:
= 1'-0
4 0 2 4 8
N
GENERATOR
EXISTING
FF
PARTIAL FIRST FLOOR/MECHANICAL YARD - DEMOLITION - ELEC
(TYPICAL)
PIPE SUPPORT
CONCRETE
SCALE:
= 1'-0
4 0 2 4 8
N
NEW WORK - ELEC
DEMOLITION &
FLOOR/MECH YARD -
PARTIAL FIRST
PARTIAL FIRST FLOOR/MECHANICAL YARD - NEW WORK - ELEC
EXISTING CONCRETE PAD
CHILLER
AIR COOLED
EXISTING
REMOVE
GENERAL NOTES:(THIS SHEET ONLY)
A
DOCUMENTS AND ACTUAL CONDITIONS AT THE SITE MAY VARY.
OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT"
BEEN PREPARED USING "AS-DESIGN" DOCUMENTS. NEITHER THE
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE
B
TO COMPLETE THE DEMOLITION/NEW WORK.
CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED
SCOPE OF DEMOLITION/NEW WORK AND IN NO WAY RELIEVES THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL
C COORDINATE DEMOLITION WORK WITH NEW WORK.
D
AREA REQUIRING WORK.
COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO OR NEAR
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS,
E
TEXTURE, QUALITY, ETC.)
MATERIAL, SIZE, ALIGNMENT, JOINT WORK, FINISHES, COLOR,
SURFACES SHALL BE REPAIRED TO MATCH EXISTING (IN
MECHANICAL, ELECTRICAL, AND PLUMBING WORK), SUCH
WHERE SURFACES ARE DAMAGED BY DEMOLITION (INCLUDING
F
EXISTING SURROUNDINGS.
ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH
COVER FOR ANY ABANDONED BOXES. WHERE CONDUIT IN SLAB IS
SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK
LONGER BE IN USE TO THE POINT OF LAST TERMINATION. THERE
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO
NOTES:(THIS SHEET ONLY)
LGA
SWBD 2
2 REMOVE EXISTING 800A CHILLER BREAKER AND REPLACE WITH NEW.
EXISTING PULLBOX
BE REUSED.
EXISTING CONDUCTORS FROM THE PULLBOX TO THE SWITCHBOARD TO
LOCATION.
THE LOAD SIDE OF THE OLD DISCONNECT TO THE DEMOLISHED CHILLER
REMOVE EXISTING CONDUCTORS (OR ABANDON IF UNDERGROUND) FROM
5 REMOVE EXISTING DISCONNECTS AND REPLACE WITH NEW.
FF
THE OLD. FUSE DOWN TO NEW CHILLER MOCP (400A ASSUMED)
PROVIDE A NEW 800A FUSED DISCONNECT IN THE SAME LOCATION AS
CONTROLLER.
EXTEND A NEW PORTION OF THE CIRCUITOVER TO THE HEAT TRACE
LOCATION. MAKE ALL CONNECTIONS BACK TO EXISTING 120V CIRCUITS.
PROVIDE NEW FUSED DISCONNECT TO REPLACE THE OLD IN THE SAME
THE DEMOLISHED CHILLER.
WAS LOCATED. TRACE EXISTING CIRCUIT TO CONFIRM IT SERVES ONLY
ADD NEW 800A/3P BREAKER IN THE SAME SPACE AS THE EXISTING
CONTROLLER. MAKE ALL FINAL CONNECTIONS.
3#10 IN •" IMC ROUTED NEATLY ALONG WALL TO NEW HEAT TAPE
P:\26056\26056e20.dgn
DGN FILE
28-OCT-2026
SEAL
SCALE:
FILE PATH:
SHEET NUMBER:
316 CORPORATE PARKWAY
NBP Engineers, Inc.
MACON, GEORGIA 31210
NBP
ENGINEERS
478-745-1691 www.nbpengineers.com
No. REVISIONS/SUBMISSIONS DATE
DRAWN:
CHECKED:
DESIGNED:
DATE:
PROJECT NUMBER:
P R
O J E
C T
T
IT
L E
SHEET TITLE:
CONSULTANTS
THIS DRAWING IS THE PROPERTY OF THE
ENGINEER AND MAY NOT BE REPRODUCED
OR USED IN WHOLE OR IN PART
WITHOUT HIS WRITTEN PERMISSION. IT IS
TO BE USED FOR THE PROJECT
SPECIFICALLY IDENTIFIED HEREIN AND TO
BE RETURNED UPON REQUEST.
P:\26056\26056e20.dgn
AS SHOWN
COA Expiration: 6.30.2028
COA#PEF000774
NBP Engineers, Inc.
N B P P ro je c t
N o
G O
R D
O N S
T A
T E C
O L L E
G E
L A
M B
D
IN
H
A L L C
H
IL
L E
R R
E P
L A
C E
M E
N T
B a rn e s v il le
G e o rg ia
BCO
KMS
10.29.2026
26056
MJS
N S T
R U
C T
C U
M E
N T S
T
P
S
C
VFD-1 VFD-2
AHU-1
DDCICS
L-1
TANK
EXPANSION
COOLING COIL
ACCESS
MIXING BOX
FILTER
PREHEAT COIL
FAN
DAMPER CONTROLLER
P-1
P-2
VFD P-2
P-1
VFD
E20
SCALE:
= 1'-0
4 0 2 4 8
N
T
P
S
C
P-1
P-2
VFD-1 VFD-2
AHU-1
DDCICS
PARTIAL THIRD FLOOR MECHANICAL ROOM - DEMOLITION - ELEC
L-1
TANK
EXPANSION
CHEMICAL FEED
SCALE:
= 1'-0
4 0 2 4 8
N
PARTIAL THIRD FLOOR MECHANICAL ROOM - NEW WORK - ELEC
NEW WORK - ELEC
DEMOLITION &
FLOOR MECH. RM. -
PARTIAL THIRD
COOLING COIL
ACCESS
MIXING BOX
FILTER
PREHEAT COIL
FAN
DAMPER CONTROLLER
GENERAL NOTES:(THIS SHEET ONLY)
A
DOCUMENTS AND ACTUAL CONDITIONS AT THE SITE MAY VARY.
OWNER NOR THE ARCHITECT WARRANT THESE TO BE "AS-BUILT"
BEEN PREPARED USING "AS-DESIGN" DOCUMENTS. NEITHER THE
DRAWINGS FOR ARCHITECTURAL AND ENGINEERING WORK HAVE
B
TO COMPLETE THE DEMOLITION/NEW WORK.
CONTRACTOR FROM PROVIDING ANY AND ALL WORK REQUIRED
SCOPE OF DEMOLITION/NEW WORK AND IN NO WAY RELIEVES THE
THE WORK INDICATED IS INTENDED TO SHOW THE GENERAL
C COORDINATE DEMOLITION WORK WITH NEW WORK.
D
AREA REQUIRING WORK.
COMPONENTS, BUILDING SYSTEMS, ETC. ADJACENT TO OR NEAR
PROTECT FROM DAMAGE/MAINTAIN EXISTING ITEMS,
E
TEXTURE, QUALITY, ETC.)
MATERIAL, SIZE, ALIGNMENT, JOINT WORK, FINISHES, COLOR,
SURFACES SHALL BE REPAIRED TO MATCH EXISTING (IN
MECHANICAL, ELECTRICAL, AND PLUMBING WORK), SUCH
WHERE SURFACES ARE DAMAGED BY DEMOLITION (INCLUDING
F
EXISTING SURROUNDINGS.
ABANDONED CUT FLUSH TO FLOOR AND FINISH TO MATCH
COVER FOR ANY ABANDONED BOXES. WHERE CONDUIT IN SLAB IS
SHALL BE NO UNTERMINATED CONDUCTORS. PROVIDE BLANK
LONGER BE IN USE TO THE POINT OF LAST TERMINATION. THERE
REMOVE ALL CONDUCTORS FROM CIRCUITS THAT WILL NO
NOTES:(THIS SHEET ONLY)
VFD 2
G
THE BREAKERS AND CONDUCTORS TO POWER THE NEW VFDs.
THE TWO 40/3P BREAKERS CURRENTLY SERVING THE PUMPS. REUSE
PANEL LC IS LOCATED OFF THE SHEET IN THIS LOCATION, AND HAS
THE BREAKERS AND CONDUCTORS TO POWER THE NEW VFDs.
THE TWO 40/3P BREAKERS CURRENTLY SERVING THE PUMPS. REUSE
PANEL LC IS LOCATED OFF THE SHEET IN THIS LOCATION, AND HAS
(LIQUIDTITE WITHIN 24").
VFD LOCATIONS. MAKE ALL FINAL CONNECTIONS WITH 3#8, 1#10G IN ƒ" C
NEW VFDs BY DIV 23. EXTEND THE EXISTING CIRCUITS TO THE NEW
PREP EXISTING CIRCUITS FOR CONNECTION TO THE NEW VFDs.
| 26056aCov |
| 26056m00 |
| 26056m10 |
| 26056m20 |
| 26056m30 |
| 26056e00 |
| 26056e10 |
| 26056e20 |
File details come from the government source that posted it. Updated .