Labor, materials, and equipment for the abandonment of wastewater treament plant

Closed State & local contract opportunity Posted

Solicitation number
2024 - 008
State
South Carolina
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

Clarendon County, located in South Carolina, is seeking qualified contractors for Invitation to Bid (ITB 2024-008) to abandon the wastewater treatment facility located at 3180 White Oak Dr. in Manning, SC. The comprehensive project requires contractors to provide labor, materials, and equipment for complete facility decommissioning, including removing electrical wiring, control panels, service poles, three concrete basins, three aeration lagoon baffles, four surface aerator pumps, and the facility liner. All removed debris must be transported to the Clarendon County Landfill, with work to be completed within 120 days following the Notice to Proceed. A mandatory pre-bid meeting is scheduled for September 5, 2024, at 9:00 AM, with bid submissions due by 2:00 PM on September 20, 2024. Contractors must comply with local, state, and federal regulations, including SC Department of Health and Environmental Control (SCDHEC) guidelines, and demonstrate expertise through detailed references, proper licensing, worker's compensation insurance, and evidence of similar project experience. The project involves comprehensive site remediation, including pumping effluent from lagoon surfaces, treating solids with caustic lime, removing and cleaning equipment, mixing solids with soil, and restoring the site with grassing for soil stabilization.

While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the bid documents indicate that Clarendon County reserves the right to accept or reject any bids and will be the sole judge of bid compliance. The county requires contractors to provide comprehensive documentation of their capabilities and past performance. Payment terms include invoicing based on actual services received, with payments processed within 30 days of service acceptance. The final project inspection will be conducted by the Clarendon County Engineer, with a closeout inspection by SCDES. An interesting addendum note specifies that the County requests the spray pump from the well be saved and taken into County possession upon removal. Additional site-specific requirements include capping the irrigation spray line at the road and ensuring ponds are filled in and slightly sloped to prevent water retention. While no specific budget range is provided in the documents, the comprehensive nature of the project suggests a substantial investment in facility decommissioning and environmental remediation.

Opportunity text

The work for this project generally consists of (but not limited to): providing all labor, equipment, materials, and supervision for the removal of existing piping, pumps and wiring, and back fill lagoons per SCDES regulations, related demolition, removal and proper disposal of all generated debris from this location in Clarendon County

Files

File Type Posted
2024 - 008 Addendum 1 - Final.pdf PDF
2024 -008 WWTP - FINAL.pdf PDF