Klosterman Road and Pinellas Trail 30" Force Main Replacement - Professional Engineering Services

Closed State & local contract opportunity

Solicitation number
24-0125-RFP-CCNA
State
Florida
Responses due

Opportunity facts

UNSPSC codes
Show all 23
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Pinellas County is seeking professional engineering services for the Klosterman Road and Pinellas Trail 30" Force Main Replacement project through a Request for Proposal (RFP) issued on November 1, 2024. The primary objective is to engage a professional engineering firm to perform comprehensive design services, including limited hydraulic modeling, permitting, bidding, and post-design services for replacing a 30-inch sanitary sewer force main that has reached the end of its useful life. The project route spans from Belcher Road to Pinellas Trail and then south along Pinellas Trail to the Dunn Water Reclamation Facility. Key deliverables include preliminary engineering, design services at 30% and 90% stages, permitting, bidding services, and construction support. The evaluation criteria totals 1,000 points, with weighted categories assessing firm qualifications, project understanding, team capabilities, past project experience, and local business participation. Written questions are due by November 20, 2024, with all submittals required by November 30, 2024. The contract duration is set for 765 consecutive calendar days from the Notice to Proceed.

The county encourages participation from Small Business Enterprise (SBE) firms, offering up to 100 points for SBE certification in the evaluation process. While no specific set-aside designations are explicitly mentioned, the procurement appears to be open to qualified engineering firms with demonstrated expertise in municipal infrastructure replacement projects. The engineering assessment by Reiss Engineering indicates the total replacement cost for the force main segments is approximately $7.56 million, which suggests a significant budget range for the project. The county reserves the right to rank firms, negotiate with the highest-ranked firm, and select the proposal that best serves Pinellas County's interests. Existing infrastructure includes a 30-inch ductile iron force main along the Pinellas Trail and Klosterman Road, which has experienced corrosion and reduced pipe wall thickness, necessitating comprehensive replacement. The project aims to minimize community disruption while establishing more resilient infrastructure along the existing alignments.

Opportunity text

The purpose of this Contract is to engage a professional engineering firm to perform design services, including limited hydraulic modelling, permitting, bidding and post design services for the replacement of a 30" sanitary sewer force main located in North Pinellas County. The existing 30" force main has reached the end of its useful life and needs to be replaced. The project route is along Klosterman Road, from Belcher Road to Pinellas Trail, then south along Pinellas Trail to the Dunn Water Reclamation Facility.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity