Klosterman Road and Pinellas Trail 30" Force Main Replacement - Professional Engineering Services
Closed State & local contract opportunity
- Solicitation number
- 24-0125-RFP-CCNA
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 91340 Construction, Pipeline
- 91356 Construction, Utility/Underground Projects
- 92533 Engineer Services, Professional
- 92535 Environmental Engineering
- 92536 Engineering Services (Not Otherwise Classified)
- 92583 Sanitary Engineering
- 92587 Sewage Collection, Treatment, And Disposal/Engineering
- 92596 Waste Water Treatment Engineering
- UNSPSC codes
- 72141126 Underground utilities construction service
- 72141110 Oil and gas branch line construction service
- 95121641 Pumping station
- 81102501 Mine permitting service
- 95121800 Utility buildings and structures
- 72141112 Natural gas compressor station construction service
- 95121803 Nuclear power station
- 95121802 Substation
- 95121801 Radar station
- 81101607 Textile engineering service
Show all 23
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 72141124 Pipe laying service
- 95121640 Pipeline
- 72141111 Gas main construction service
- 72141114 Pipeline wrapping service
- 72141113 Oil and gas pipeline construction service
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81102702 Process control system design and engineering service
- 81101531 Sanitation engineering service
- 81101529 Acoustic engineering
- 81101606 Marine engineering
- 76121701 Sewage treatment services
- Point of contact
-
- Pamela Ulrich plulrich@pinellascounty.org (727) 464-3150
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Pinellas County is seeking professional engineering services for the Klosterman Road and Pinellas Trail 30" Force Main Replacement project through a Request for Proposal (RFP) issued on November 1, 2024. The primary objective is to engage a professional engineering firm to perform comprehensive design services, including limited hydraulic modeling, permitting, bidding, and post-design services for replacing a 30-inch sanitary sewer force main that has reached the end of its useful life. The project route spans from Belcher Road to Pinellas Trail and then south along Pinellas Trail to the Dunn Water Reclamation Facility. Key deliverables include preliminary engineering, design services at 30% and 90% stages, permitting, bidding services, and construction support. The evaluation criteria totals 1,000 points, with weighted categories assessing firm qualifications, project understanding, team capabilities, past project experience, and local business participation. Written questions are due by November 20, 2024, with all submittals required by November 30, 2024. The contract duration is set for 765 consecutive calendar days from the Notice to Proceed.
The county encourages participation from Small Business Enterprise (SBE) firms, offering up to 100 points for SBE certification in the evaluation process. While no specific set-aside designations are explicitly mentioned, the procurement appears to be open to qualified engineering firms with demonstrated expertise in municipal infrastructure replacement projects. The engineering assessment by Reiss Engineering indicates the total replacement cost for the force main segments is approximately $7.56 million, which suggests a significant budget range for the project. The county reserves the right to rank firms, negotiate with the highest-ranked firm, and select the proposal that best serves Pinellas County's interests. Existing infrastructure includes a 30-inch ductile iron force main along the Pinellas Trail and Klosterman Road, which has experienced corrosion and reduced pipe wall thickness, necessitating comprehensive replacement. The project aims to minimize community disruption while establishing more resilient infrastructure along the existing alignments.
Opportunity text
The purpose of this Contract is to engage a professional engineering firm to perform design services, including limited hydraulic modelling, permitting, bidding and post design services for the replacement of a 30" sanitary sewer force main located in North Pinellas County. The existing 30" force main has reached the end of its useful life and needs to be replaced. The project route is along Klosterman Road, from Belcher Road to Pinellas Trail, then south along Pinellas Trail to the Dunn Water Reclamation Facility.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity