Killingworth elementary school boiler piping redesign
Closed State & local contract opportunity Posted
- Solicitation number
- 1830
- State
- Connecticut
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from webprocure.proactiscloud.com. Updated .
About this opportunity
This solicitation is a Request for Quotation (RFQ) issued by Regional School District No. 17 in Killingworth, Connecticut for the KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING REDESIGN project. The project scope includes demolition of eight hot water circulator pumps and their electrical circuits, as well as partial demolition of existing hot water supply and return piping, valves, and fittings. The new work involves re-piping the hot water supply and return into a primary-secondary configuration, installing two new constant speed primary pumps at the two boilers, two new base-mounted secondary pumps with variable speed drives, modifying the existing Alerton DDC system to control the new pumps, and insulating all hot water supply and return piping in the boiler room. The RFQ is open to all vendors, with a start date of May 19, 2021 and an end date of June 3, 2021. Interested vendors can download the solicitation documents, including drawings, from the Regional School District No. 17 website.
The RFQ does not specify any set-aside designations, restrictions on the types of organizations that can respond, or list any incumbent vendors or current contractors. It also does not provide details on funding sources or the total estimated value of the project. The solicitation documents do not indicate if there are any existing infrastructure or technology requirements that need to be integrated. Vendors are allowed to enter negative values, and line items are not excluded from the bid total. Contact information is provided for the procurement officer, John Mercier, who can be reached for any questions.
Opportunity text
The project demolition scope includes demolition of eight (8) hot water circulator pumps and their corresponding electrical circuits, and partial demolition of existing hot water supply and return piping, valves, and fittings. The project new work scope includes re-piping the hot water supply and return piping into a primary-secondary configuration, installation of two (2) new constant speed primary pumps at the two (2) boilers, installation of two (2) new base-mounted secondary pumps with variable speed drives, modification of the existing Alerton DDC system to control the new pumps, and insulation of all hot water supply and return piping in the boiler room. Documents are also downloadable at https://www.rsd17.org/district/business-office