1830_Aug_30_24_solicitation_doc.pdf
PDF 18 KB Posted
- Solicitation number
- 1830
- Issued by
- Middlesex County, Connecticut
About this file
This document is a Request for Quotation (RFQ) for the KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING REDESIGN project issued by Regional School District No. 17. The project scope includes demolition of existing hot water circulator pumps, piping, valves, and fittings, and the installation of new primary and secondary hot water pumps, re-piping, and modifications to the Alerton DDC control system. The RFQ is open to all vendors, with a start date of May 19, 2021 and an end date of June 3, 2021. The estimated total value is not provided.
The RFQ specifies free on-board destination delivery terms and standard payment terms. Contact information is provided for John Mercier, who can be reached for any questions. The RFQ includes several downloadable documents, such as the project specifications, mechanical and electrical drawings, and an addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| solicitation_summary.pdf | ||
| 1830_Sep_9_24_solicitation_doc.pdf | ||
| 1830_Sep_30_24_solicitation_doc.pdf | ||
| 1830_Sep_16_24_solicitation_doc.pdf | ||
| 1830_Oct_7_24_solicitation_doc.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 1830
KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING
REDESIGN
Request for Quotation (RFQ)
Regional School District No. 17
May 19, 2021 - June 03, 2021
Page:2
General Header Information
This bid has no questions defined.
No. 1830 Title: KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING
REDESIGN
Start Date: May 19, 2021 at 7:00:00 AM EDT End Date: June 03, 2021 at 3:00:00 PM EDT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: The project demolition scope includes demolition of eight (8) hot water circulator pumps and their corresponding electrical circuits, and partial demolition of existing hot water supply and return piping, valves, and fittings. The project new work scope includes re-piping the hot water supply and return piping into a primary-secondary configuration, installation of two
(2) new constant speed primary pumps at the two (2) boilers, installation of two (2) new base-mounted secondary pumps with variable speed drives, modification of the existing Alerton DDC system to control the new pumps, and insulation of all hot water supply and return piping in the boiler room. Documents are also downloadable at https://www.rsd17.org/district/business-office
Delivery Terms: Free On Board Destination Payment Terms: See Payment Notes Contact Information: Regional School District No. 17
John Mercier 57 Little City Road Higganum CT, 06441 United States Tel: 860-345-4534 Fax:
jmercier@rsd17.org
Contact Details: If you have any questions, please contact:
John Mercier 57 Little City Road Higganum CT, 06441 United States Tel: 860-345-4534 Fax:
jmercier@rsd17.org
Selected Categories:
Page:3
Documents:
Killingworth Elementary School Boiler Piping Redesign.pdf
Mechanical and Electrical Drawings.pdf
KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING REDESIGN - Addendum 1.pdf
Page:4
Item Specifications
No. Item Alternative Supplier Part No Mfr.
Name
Mfr. No Del
Date
Unit Unit Bid Qty. Total
1 HVAC each 1.00
Item Specification for HVAC
Description:
Allow Vendor to Enter Negative Value : No
Exclude Line Item from Bid Total : No
Page:5
File details come from the government source that posted it. Updated .