1830_Aug_30_24_solicitation_doc.pdf

PDF 18 KB Posted

Attached to
KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING REDESIGN
Solicitation number
1830
Issued by
Middlesex County, Connecticut

About this file

This document is a Request for Quotation (RFQ) for the KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING REDESIGN project issued by Regional School District No. 17. The project scope includes demolition of existing hot water circulator pumps, piping, valves, and fittings, and the installation of new primary and secondary hot water pumps, re-piping, and modifications to the Alerton DDC control system. The RFQ is open to all vendors, with a start date of May 19, 2021 and an end date of June 3, 2021. The estimated total value is not provided.

The RFQ specifies free on-board destination delivery terms and standard payment terms. Contact information is provided for John Mercier, who can be reached for any questions. The RFQ includes several downloadable documents, such as the project specifications, mechanical and electrical drawings, and an addendum.

View the file

Other files

File Type Posted
solicitation_summary.pdf PDF
1830_Sep_9_24_solicitation_doc.pdf PDF
1830_Sep_30_24_solicitation_doc.pdf PDF
1830_Sep_16_24_solicitation_doc.pdf PDF
1830_Oct_7_24_solicitation_doc.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: 1830

KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING

REDESIGN

Request for Quotation (RFQ)

Regional School District No. 17

May 19, 2021 - June 03, 2021

Page:2

General Header Information

This bid has no questions defined.

No. 1830 Title: KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING

REDESIGN

Start Date: May 19, 2021 at 7:00:00 AM EDT End Date: June 03, 2021 at 3:00:00 PM EDT Vendor Q&A Start Date:

Vendor Q&A End Date:

Estimated Total Value:

Who can respond to this bid? : All Vendors Description: The project demolition scope includes demolition of eight (8) hot water circulator pumps and their corresponding electrical circuits, and partial demolition of existing hot water supply and return piping, valves, and fittings. The project new work scope includes re-piping the hot water supply and return piping into a primary-secondary configuration, installation of two

(2) new constant speed primary pumps at the two (2) boilers, installation of two (2) new base-mounted secondary pumps with variable speed drives, modification of the existing Alerton DDC system to control the new pumps, and insulation of all hot water supply and return piping in the boiler room. Documents are also downloadable at https://www.rsd17.org/district/business-office

Delivery Terms: Free On Board Destination Payment Terms: See Payment Notes Contact Information: Regional School District No. 17

John Mercier 57 Little City Road Higganum CT, 06441 United States Tel: 860-345-4534 Fax:

jmercier@rsd17.org

Contact Details: If you have any questions, please contact:

John Mercier 57 Little City Road Higganum CT, 06441 United States Tel: 860-345-4534 Fax:

jmercier@rsd17.org

Selected Categories:

Page:3

Documents:

Killingworth Elementary School Boiler Piping Redesign.pdf

Mechanical and Electrical Drawings.pdf

KILLINGWORTH ELEMENTARY SCHOOL BOILER PIPING REDESIGN - Addendum 1.pdf

Page:4

Item Specifications

No. Item Alternative Supplier Part No Mfr.

Name

Mfr. No Del

Date

Unit Unit Bid Qty. Total

1 HVAC each 1.00

Item Specification for HVAC

Description:

Allow Vendor to Enter Negative Value : No

Exclude Line Item from Bid Total : No

Page:5

File details come from the government source that posted it. Updated .