About this opportunity
Rockford School District 205 is soliciting bids under IFB 27-04 for a complete roof replacement at Jefferson High School, with bids due November 3, 2026 at 2:00 p.m. CST. Bids must be submitted in physical form through the Bonfire Hub portal, because Illinois statute does not accept electronically transmitted bids. Intent to Bid submission is due on the same date, and questions closed October 27, 2026.
Scope covers full roof tear-off to the structural deck, including vapor retarders, insulation, base and perimeter edge flashings, copings, and related components. Deck inspection and repair may include steel roof deck replacement sections per project specifications. The new roofing assembly includes substrate board, vapor retarder, insulation, walkways, and either a Thermoplastic Polyolefin (TPO) or EPDM membrane system, installed ballasted and/or fully adhered.
Bidders must register for a Euna Supplier Network account to download the bid documents. The package includes Bid Documents, the Project Manual (RPS Jefferson HS Re-Roofing LDG 2026-050), and Drawings (2026-050 JHS REROOF Set dated September 29, 2026). The opportunity is classified under UNSPSC codes for building and facility construction, nonresidential building construction, roofing services, and school building construction services. The listing is assigned to Rock Island County, Illinois, and was posted October 29, 2026.
Opportunity text
Full Roof Tear-Off: Removal of the existing roof down to the structural roof deck, including vapor retarders, insulation, base flashings, perimeter edge flashings, copings, and related components. Deck Preparation & Repair: Inspection, preparation, and repair of damaged areas on the existing roof deck (which may include steel roof deck replacement sections per project specifications). New Roofing System Installation: Installation of a new roofing assemblyincluding a substrate board, vapor retarder, insulation, walkways, and a Thermoplastic Polyolefin (TPO) or EPDM membrane system (ballasted and/or fully adhered).
Files
| File | Type | Posted |
|---|---|---|
| Rockford School District 205 27-04 jefferson hs roof replacement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity