Jackson county UPS replacement project
Open State & local contract opportunity Posted
- Solicitation number
- PE-67800-NONST-2027-000000051
- State
- Georgia
- Responses due
Opportunity facts
- NIGP codes
- UNSPSC codes
- 72154023 Lightning conductor erection service
- 71112125 Electric wireline operation base and logistics
- 71161208 Electric wireline surface equipment services
- 72151522 Electrical luminary service
- 71161207 Electric wireline manpower services
- 72151500 Electrical system services
- 72151524 Industrial electrical service
- 72151501 Lighting installation services
- 71112124 Electric wireline open hole services
- 71161209 Electric wireline mechanical and auxiliary services
- Point of contact
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
Jackson County Board of Commissioners is soliciting bids under ITB 260011 from electrical contractors and UPS system integrators to replace uninterruptible power supply systems at the Courthouse Data Center and the Sheriff/E911 Center Data Center, with a mandatory pre-bid conference on November 10, 2026 and bids due November 19, 2026 at 2:00 p.m. EST. Acceptable UPS manufacturers are limited to Schneider Electric Galaxy Series or Eaton Enterprise/data-center models with verified EcoStruxure compatibility, and alternate manufacturers will not be accepted.
Bidders must show applicable Georgia electrical contractor licensing, manufacturer authorization or certification, experience with comparable mission-critical installations, and at least three references, including one public safety or government facility. Contractors must participate in E-Verify under Georgia's Illegal Immigration Reform and Enforcement Act of 2011. The scope covers complete, fully operational systems with new batteries, maintenance bypass equipment, electrical work, integration with the County's existing Schneider Electric EcoStruxure monitoring environment, startup and commissioning, coordinated cutover, removal and disposal of existing equipment, documentation, and staff training. The 911 Center technical specification describes a modular UPS with matching battery cabinet, sidecar, and raised-floor stands. Existing UPS units must remain operational until the County authorizes cutover, and removal before approved cutover is prohibited. Cutover labor must be priced for nights and weekends.
Bidders must submit separate fixed-price proposals for each data center, itemized by major project component, and include a 5% bid bond with the bid. Performance and payment bonds equal to 100% of the contract price are required upon award. The contract term is 14 months from the Notice to Proceed, which must be issued within 30 days of award. Commercial general liability insurance of at least $1,000,000 is required. Payment terms are Net 30 with monthly invoicing for completed and inspected work. The County may reject any or all bids and may cancel the contract on 60 days' written notice.
The mandatory pre-bid conference is November 10, 2026 at 3:30 p.m. EST at the Jackson County Administrative Building, with site walkthroughs lasting approximately two hours. Written questions are due November 11, 2026 at 5:00 p.m. EST.
Opportunity text
Jackson County Board of Commissioners (hereafter referred to as Jackson County) is requesting bids from qualified electrical contractors and Uninterruptible Power Supply (UPS) system integrators for the replacement of existing UPS systems serving critical Information Technology and Public Safety infrastructure at two County facilities: 1. Jackson County Courthouse Data Center 2. Jackson County Sheriff / E911 Center Data Center The project shall include all equipment, materials, labor, supervision, engineering coordination, electrical work, manufacturer services, startup, testing, commissioning, monitoring integration, documentation, training, removal of existing equipment, and other work necessary to provide complete and fully operational UPS systems. The County's data centers support critical government, network, server, telecommunications, public safety, Sheriff, and E911 systems. Maintaining electrical availability throughout the project is therefore a critical requirement. The existing UPS systems shall remain fully operational and continue protecting the existing critical loads until the County authorizes the final cutover. Removal or disconnection of an existing UPS prior to the approved cutover is prohibited.
Files
| File | Type | Posted |
|---|---|---|
| 2026_06_25 Jackson County_911 Call Center_UPS.pdf | ||