Installation of Windows at Marydia

Closed State & local contract opportunity

Solicitation number
RFQ #16-526-CV
State
Florida
Responses due

Opportunity facts

UNSPSC codes
Show all 32
Point of contact

Updated .

About this opportunity

The Kissimmee Utility Authority (KUA) issued Request for Quotation #16-526-CV for the installation of windows at the Marydia Substation Pavilion located at 1150 Garden Street in Kissimmee, Florida. The procurement specifically sought the supply and turn-key installation of twelve sliding windows with specific technical requirements, including Low-E glass, argon gas insulation, and screens to enclose a picnic pavilion. Key deliverables included windows rated for 100 mph wind speed, with superior thermal performance and 99.9% UV light blocking capabilities. The project required comprehensive installation services involving break metal work at columns, setting blocks, epoxy compound application, and proper sealing. A pre-bid meeting was scheduled for July 22, 2016, at 8:00 AM at the project site, with quotations due by July 29, 2016, at 3:00 PM. Evaluation criteria encompassed pricing structure, response time, workmanship quality, contractor capabilities and experience, financial capability, and compliance with KUA's terms and conditions. Bidders were required to provide a ten-year warranty on the laminated glass and maintain comprehensive insurance with minimum $1,000,000 combined single limit for general and automobile liability.

No specific set-aside designations for disadvantaged enterprises were explicitly noted in the documentation. Three vendors submitted bids: BlackStreet Enterprises LLC dba BSE Construction Group LLC (lowest total bid at $14,278.52), Grove Construction ($28,411.54), and Window World Orlando ($13,147.00). The project required contractors to be properly licensed by the State of Florida and obtain all necessary building permits from Osceola County. Contractors were mandated to comply with federal, state, and local regulations, including OSHA, EPA, Florida Building Code (2014), and ANSI/ASTM standards. The quotation period remained valid for ninety days from the opening date, with the intent to award to the lowest responsive and responsible quoter. The total project budget appeared to range between approximately $13,000 and $28,500 based on the submitted bids. No incumbent vendor information was explicitly detailed, and no specific technology integration requirements were mentioned beyond the window installation specifications.

Opportunity text

The intent of this specification is to identify the requirements for the furnishing the materials and labor to install windows in the picnic pavilion at 1150 Garden Street, Kissimmee, FL. The bidder shall identify in his bid all deviations from the requirements of the specification.

Files

File Type Posted
Tabulation.pdf PDF
Addendum_1.pdf PDF
RFQ_16-526-CV_WINDOW_INSTALLATION_MARYDIA.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity