The Town of Manchester Water & Sewer Department (MWDS) in Hartford County, Connecticut, is seeking qualified contractors to install a monorail fall protection system with gantry cranes at the Globe Hollow Water Treatment Facility. The project requires fabrication, delivery, installation, and training for a fall protection system designed to enhance worker safety on sedimentation basins. Engineered fall protection systems from manufacturers like DBI/Sala or MSA are preferred, with specific technical requirements including a maximum 13-foot span between anchors, capability to support two users simultaneously, and compliance with OSHA 1926.502 regulations. The procurement is structured as a Request for Proposal (RFP #22/23-24), with proposals evaluated across five weighted categories: safety information (40%), proposal quality (30%), contractor experience (10%), references (10%), and price (10%). Key deadlines include a mandatory pre-bid site visit on November 17, 2022, at 10:00 am, and proposal submissions due by December 16, 2022, at 11:00 am through the Town of Manchester's OpenGov Portal. The target implementation date is January 1, 2023, with project completion required within six months of work start.
Contractor qualifications include a minimum of 10 years of experience in fall protection, documented system fabrication and installation experience, maintenance capabilities, and proof of installing at least two systems in the previous 12 months. The RFP includes a living wage certification requirement, with provisions for potential exemptions for nonprofits, contractors with fewer than 25 eligible employees, or those with contract values under $25,000. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, the contract includes comprehensive insurance requirements that vary based on contract value. The technical specifications call for 316 Stainless Steel components, including a 7x7, 5/16-inch cable with 8,500 lbs breaking strength, and require installation by manufacturer-authorized, trained, and certified personnel. Though no specific budget range is provided, the detailed technical requirements suggest a complex infrastructure project with significant safety and engineering specifications. The project includes a one-year correction period after substantial completion and mandates a lifetime manufacturer warranty.
Opportunity text
The Town of Manchester Water & Sewer Department (MWDS) has identified the need to install a plain and trussed monorail fall protection system with gantry cranes on the sedimentation basins at the Globe Hollow Water Treatment Plant. We are seeking proposals from qualified Contractors for fabrication, delivery, installation, and training on a Fall Protection System design provided in this proposal. Engineered fall protection systems such as DBI/Sala or MSA will be given priority
The target implementation date for this service is January 1, 2023 and completion of work should be no later than six (6) months after start of work.