IEPA SRF Census Tract 14 - Block Level Lead Service Line Replacements
Open State & local contract opportunity Posted
- Solicitation number
- 1347471
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Nancy Peshoff nancy.peshoff@cityofchicago.org (312) 744-7664
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
IEPA SRF is inviting proposals for block-level lead service line replacements in Census Tract 14 of Cook County, Illinois, with proposals due December 16, 2026. The source was posted October 31, 2026.
The work covers replacement of lead service lines from the street water main to the point of connection inside each residence. It includes excavation and removal or abandonment of the existing line; a new corporation stop; a new copper service line of at least 1-inch diameter, or matching a larger existing diameter; a curb stop, shut-off box, insulation, and PVC casing as required; and installation of a meter furnished by the Chicago Department of Water Management. Where Chicago Plumbing Code requirements are not met, the scope extends to removal and replacement of residential sanitary sewer or mainline sanitary at those locations. Supporting tasks include permitting, pre-construction meetings, mobilization, traffic control, tree protection, trenching, backfill, testing and flushing, temporary pavement, and debris removal. The source describes these tasks as "includes but is not limited to" and requires work to City of Chicago project standards, to the City's satisfaction and acceptance.
Opportunity text
The work for which proposals are invited includes but is not limited to the replacement of lead services lines, from the water main in the street to the point of connection located inside each residence; excavation, removal or abandonment of the existing lead service line, installation of a new corporation stop, installation of a new copper service line (1-inch diameter minimum or match existing diameter if larger) and curb stop, shut-off box, insulation and PVC casing as required; installation of a new meter (meter provided by Chicago Department of Water Management), removal and replacement of residential sanitary sewer and/or mainline sanitary at those locations where the requirement of the Chicago Plumbing Code (latest edition) are not met, testing and flushing, backfill and temporary pavement as defined in the plans, detailed specifications and in accordance with all City of Chicago project standards. The work also includes but is not limited to permitting, pre-construction meeting(s), site mobilization, providing traffic control and protection for the duration of the work, trenching, grading, backfilling, compaction of excavations, protection of trees, maintenance of trenches and removal of all construction debris as described in the detailed specifications , including all appurtenant work and accessories, to the complete satisfaction of, approval and acceptance by the City.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity