IEPA SRF Census Tract 12 - Block Level Lead Service Line Replacements
Open State & local contract opportunity Posted
- Solicitation number
- 1347469
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Nancy Peshoff nancy.peshoff@cityofchicago.org (312) 744-7664
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
City of Chicago Department of Water Management is soliciting proposals for block-level lead service line replacements in Census Tract 12 within Cook County, Illinois, funded through the Illinois EPA State Revolving Fund, with proposals due December 9, 2026. The opportunity was posted October 31, 2026. The source does not name a set-aside or preference program.
The work includes, but is not limited to, replacing lead service lines from the street water main to the point of connection inside each residence. Required tasks include excavating and removing or abandoning the existing lead line; installing a new corporation stop, a copper service line of at least 1 inch (or matching a larger existing diameter), a curb stop, a shut-off box, insulation, and PVC casing as required; and removing and replacing residential or mainline sanitary sewer where the Chicago Plumbing Code (latest edition) is not met. The Chicago Department of Water Management provides the meter. Additional work covers testing, flushing, backfill, and temporary pavement per the plans and City of Chicago project standards; permitting, pre-construction meetings, mobilization, traffic control and protection, trenching, grading, compaction, tree protection, trench maintenance, and debris removal.
Opportunity text
The work for which proposals are invited includes but is not limited to the replacement of lead services lines, from the water main in the street to the point of connection located inside each residence; excavation, removal or abandonment of the existing lead service line, installation of a new corporation stop, installation of a new copper service line (1-inch diameter minimum or match existing diameter if larger) and curb stop, shut-off box, insulation and PVC casing as required; installation of a new meter (meter provided by Chicago Department of Water Management), removal and replacement of residential sanitary sewer and/or mainline sanitary at those locations where the requirement of the Chicago Plumbing Code (latest edition) are not met, testing and flushing, backfill and temporary pavement as defined in the plans, detailed specifications and in accordance with all City of Chicago project standards. The work also includes but is not limited to permitting, pre-construction meeting(s), site mobilization, providing traffic control and protection for the duration of the work, trenching, grading, backfilling, compaction of excavations, protection of trees, maintenance of trenches and removal of all construction debris.
Files
| File | Type | Posted |
|---|---|---|
| city of chicago 1347469.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity