First Aid Building Improvements

Closed State & local contract opportunity Posted

Solicitation number
26-24
State
New Jersey
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Housing Authority of the City of Camden (HACC) is soliciting bids on residential unit rehabilitation services for 42 units across four public housing developments under IDIQ Contract 26-24, with bids due October 14, 2026 and a mandatory pre-bid meeting and site visit on September 29, 2026 at 9:30 a.m. This is a federally funded project subject to Davis Bacon wage rates and HUD Section 3 hiring requirements.

Eligible bidders must be qualified, licensed, and insured contractors with a minimum of three years' experience in residential unit renovations. The scope encompasses general construction, painting, carpentry, cleaning, plumbing, mechanical, and electrical services across Baldwin's Run I (9 units), Baldwin's Run II (9 units), Chelton Terrace Phase II (9 units), and Kennedy Tower (15 units) in Camden. Contractors must secure all necessary permits and comply with applicable building codes.

The contract period is 180 calendar days from Notice to Proceed, with work completion required within that timeframe. Liquidated damages are assessed at $500 per day for delays beyond the completion date. Bidders must submit pricing on a unit basis using Davis Bacon wage rates applicable to Camden County. The HACC reserves the right to make multiple awards to different contractors.

Bid surety requirements include a bid guarantee of 10 percent of the total bid amount (not to exceed $20,000) and a Performance Bond equal to 100 percent of the contract value. Contractors must provide Commercial General Liability coverage of $2 million, Excess Umbrella Liability of $4 million, Workers Compensation Insurance, and list the HACC as an additional insured. Award goes to the lowest responsible bidder subject to HACC acceptance and approval of all required documentation. Questions are due October 2, 2026 at 2:00 p.m.

Opportunity text

2 versions

Update #2 · Latest ·

Project 1 Exterior Concrete and Masonry 1.1 Concrete work approximately 550 SF. Remove vegetation, weeds, roots and loose aggregate in designated generator yard and fence-side areas (Photos A1, A10, A11). Verify limits with Borough. Excavate unsuitable material, compact subgrade, provide minimum 4-inch compacted dense-graded aggregate and minimum 4-inch 4,000-psi air-entrained exterior concrete for pedestrian/maintenance loading; provide supported welded wire reinforcement or engineer-approved equivalent. Vehicle loading, if intended, requires separate design. 1.2 Drainage and finish. Form and grade for positive drainage away from building, generator and neighboring property without blocking doors or existing drains; target approximately 1/4 inch per foot where feasible and approved. Provide isolation/control joints, broom finish, curing and protection. Sawcut neatly at existing slabs; coordinate transitions and trip hazards. 1.3 Generator and utilities. Do not alter generator foundation, exhaust, ventilation clearances, gas/electrical connections, access panels, or underground lines (Photo A1). Confirm manufacturer clearances and utility locations before excavation. Protect fence posts, drainage, and existing conduit. 1.4 Stucco/corner restoration. At the front corners and textured side walls (Photos A2, A3, A5), sound-test and remove loose/delaminated stucco to stable substrate; repair damaged corner profile and cracked/chipped areas with compatible exterior stucco repair system; match texture and cure before painting. Protect overhead wires, meter, piping and service equipment. 1.5 Wall-to-slab joint. At alleyway wall/slab interface (Photos A3, A4), remove failed sealant/debris, repair sound substrate and install compatible exterior elastomeric sealant and backer rod where joint geometry permits. Preserve weeps, flashing, drainage paths and the visible cable/penetration; have its function verified before disturbing it. 1.6 Painting. Prime repaired areas and apply two compatible exterior masonry finish coats, matching existing color and texture as closely as practical; extend to natural breaks when needed for uniform appearance. 1.7 Restoration. Protect the existing sidewalk, brick pavers, rear fence and metal-clad structure (Photos A2, A10, A11); remove debris and restore disturbed surfaces. Project 2 Basement Waterproofing and Storage 2.1 Areas. Approximately 170 SF designated secure storage and 420 SF remaining basement, total approximately 590 SF; reported ceiling height 80 inches. Field verify all dimensions and obstructions (Photos A6A9). Storage use only, subject to code review. 2.2 Moisture assessment. Before coating, investigate source of staining, efflorescence, deterioration, wall penetrations, floor cracks and moisture at exposed masonry (Photos A6A8). Document findings and submit a compatible remediation proposal. Do not claim that waterproofing paint alone corrects active groundwater or hydrostatic pressure. 2.3 Waterproofing walls and floor. Remove failed coatings and loose material; clean and repair masonry joints/cracks and penetrations. Install manufacturer-approved interior waterproofing system appropriate to actual substrate and moisture conditions, including compatible wall/floor transition treatment. Active infiltration or necessary drainage redesign shall be addressed by approved design before finish installation. 2.4 Epoxy floor. Mechanically prepare approximately 590 SF of slab, repair defects, test moisture and install compatible mitigation primer as required, then commercial two-component epoxy coating with slip-resistant finish. Follow manufacturer cure times and coverage rates. 2.5 Secure enclosure. Build lockable storage partition/door at approved approximately 170-SF layout using moisture-resistant and code-compliant materials, fire separation where required, commercial lockset and appropriate egress hardware. Maintain access to furnace, combustion air, piping, electrical panels and service clearances (Photo A7). No storage shall obstruct heating equipment or exits. 2.6 Under-stair space. Include under-stair area only where fire protection, access and egress requirements permit. Coordinate enclosure with stairway design (Photo A9). 2.7 Walls and ceiling. Prepare and prime surfaces, then apply two compatible interior finish coats to designated masonry walls and exposed ceiling, protecting wiring, fixtures, mechanical equipment, identification labels and other items not intended to be coated (Photos A6A8). 2.8 Stairway. Inspect existing open-riser wooden staircase, treads, stringers, connections, handrail, guard and headroom (Photo A9). Include defined minor repairs in base bid; obtain separate alternate for complete code-compliant replacement. Replacement details and any structural work require code/design review. 2.9 Acceptance. Demonstrate proper door operation, accessible mechanical equipment, cured/adhesive coatings and completed stair work. Submit warranties and clean all spaces

Update #1 ·

The Housing Authority of the City of Camden (HACC) is hereby soliciting invitations for bids (IFB) for residential unit pricing from qualified, licensed, and insured contractors to rehab Forty-Two (42) units located throughout our public housing developments located in the City of Camden.