Housing Units - DPS - Addendum No. 2 - Calendar of Events Revision Date Issued: 11/12/2026
Open State & local contract opportunity Posted
- Solicitation number
- 3000026791
- State
- Louisiana
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- LaPAC Help Group lapachelpgroup@la.gov (225) 342-8010
Updated .
About this opportunity
The Louisiana Office of State Procurement on behalf of the Department of Public Safety is requesting bids for demolition of an existing building structure and construction of four modular housing units at 6868 Nicholson Drive, Baton Rouge, Louisiana, with bids due November 5, 2026 at 10:00 a.m. CST. A mandatory jobsite visit is required prior to bid submission; bidders must contact Chief Ed Branch at (225) 925-4911 or (985) 515-5864 to schedule and must submit either a completed Jobsite Verification Form or a signed agency letter confirming attendance with their bid.
Bidders must hold a valid Contractors' License in the appropriate classification and display the license number on the bid envelope. The scope encompasses full demolition including interior and exterior components, mechanical and electrical systems, and below-grade elements; site preparation including foundation construction per structural drawings, grading, drainage, crane pads, and staging areas; and delivery, installation, and completion of four modular housing units (a men's dorm at 782 square feet and three additional structures at 8,002 square feet each) per manufacturer specifications and applicable codes. Contractors must locate and coordinate disconnection of all existing utilities and ensure proper abandonment per provider and jurisdictional requirements.
A bid security of 5% of the total bid amount is required, submitted with the bid. Bids must remain firm for 30 calendar days following opening and include all permits, governmental fees, licenses, inspections, and taxes on an F.O.B. destination basis. Upon award, contractors must execute a Performance Bond and Labor and Materials Payment Bond, each equal to 100% of the contract amount. Contractors must maintain Workers' Compensation, Commercial General Liability, Automobile Liability ($1,000,000 combined single limit), Builder's Risk, and Pollution Liability insurance (if hazardous materials are present), all from A.M. Best A-:VI or higher carriers, with the State named as additional insured. Liquidated damages are $100 per day for completion delays. Progress payments are monthly at 90% of contract price for projects exceeding 30 days, with 10% final payment withheld for 45 days following substantial completion. The contract may be extended for two additional 12-month periods at the same terms, with a maximum total term not to exceed 36 months. Written inquiries are due October 22, 2026; responses are provided by October 29. Bidders must be registered in the LaGov vendor system prior to submission.
Opportunity text
3 versions
Update #3 · Latest ·
Demolition of existing building structure and construction of four modular housing units (one men's dorm at 782 square feet and three additional structures at 8,002 square feet each) at 6868 Nicholson Drive, Baton Rouge, Louisiana for the Department of Public Safety and Corrections. Project scope includes full demolition of existing structure, site preparation with foundation construction per structural drawings, grading, drainage, crane pads, staging areas, and delivery, installation, and completion of modular units per manufacturer specifications and applicable codes.
Update #2 ·
Demolition of existing building structure and construction of four modular housing units (one men's dorm at 782 square feet and three additional structures at 8,002 square feet each) at 6868 Nicholson Drive, Baton Rouge, Louisiana. Project scope includes full demolition of existing structure, site preparation with foundation construction per structural drawings, grading, drainage, crane pads, staging areas, and delivery, installation, and completion of modular units per manufacturer specifications and applicable codes. The Contractor shall supply all labor, equipment, supplies, and materials to complete the work.
Update #1 ·
Demolition of existing building structure and construction of three new buildings (Men's Dorm - 782 sq ft, Women's Dorm - 8,002 sq ft, Recreation Building - 8,002 sq ft) and/or four modular buildings for the Department of Public Safety and Corrections (DPS). The Contractor shall supply all labor, equipment, supplies, and materials to complete the project as per specifications.
Files
| File | Type | Posted |
|---|---|---|
| 3000026791-2.pdf | ||
| Addendum No. 2 - Calendar of Events Revision.docx | DOCX document | |
| Addendum No. 1 - Calendar of Events Revision.docx | DOCX document | |
| 3000026791-1.pdf | ||
| Revised Attachment A - Special Terms and Conditions Pages 1-14.docx | DOCX document | |
| Attachment B - Job Site Verification Form - Page 1.docx | DOCX document | |
| Attachment C - Specifications - Pages 1-5.docx | DOCX document | |
| Attachment D - Building Plans - Pages 1-17.pdf | ||
| 3000026791.pdf | ||
| Attachment A - Special Terms and Conditions Pages 1-14.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity