This is a Building Plans attachment (Attachment D) for a housing construction project in Louisiana involving the Department of Public Safety (DPS). The project encompasses three new buildings: Building A (Men's Dorm, 782 square feet), Building B (Women's Dorm, 8,002 square feet), and Building C (Recreation Building, 8,002 square feet). The plans include site layouts showing existing conditions and proposed demolition, as well as detailed floor plans for each structure. Door and window schedules are provided, specifying fire-rated assemblies with self-closers for exterior doors and appropriate interior door types. The overall site plan illustrates the spatial arrangement of the three dormitory buildings and recreation facility.
The structural specifications establish minimum design requirements for concrete, requiring a minimum compressive strength of 3,000 psi at 28 days and compliance with ACI-318 standards. Reinforcing steel must conform to ASTM Grade 60 specifications with detailed requirements for laps, splices, ties, and embedment lengths. Soil compaction is designated as the owner's and general contractor's responsibility at 95 percent standard Proctor density per ASTM D-698. Foundation design is based on a minimum bearing capacity of 2,000 PSF. Critical contractor responsibilities include field verification of slab elevations with a professional land surveyor prior to forming, adherence to concrete placement standards per ACI-301 and ACI-318, and preparation of excavation surfaces to be flat, level, and free of debris. No field observation is provided under the structural engineer's seal unless otherwise noted in writing on the plans.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3000026791-2.pdf | ||
| Addendum No. 2 - Calendar of Events Revision.docx | DOCX document | |
| Addendum No. 1 - Calendar of Events Revision.docx | DOCX document | |
| 3000026791-1.pdf | ||
| Revised Attachment A - Special Terms and Conditions Pages 1-14.docx | DOCX document | |
| 3000026791.pdf | ||
| Attachment A - Special Terms and Conditions Pages 1-14.docx | DOCX document | |
| Attachment C - Specifications - Pages 1-5.docx | DOCX document | |
| Attachment B - Job Site Verification Form - Page 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Existing Overall Site Plan
Attachment D - Building Plans RFx: 3000026791
Enlarged Existing/ Demolition Site plan
Overall New Site Plan
Women’s Dorm
Men’s Dorm
Recreation Building
Men’s Dorm
Men’s Dorm
M en
’s D or m
M en
’s D
W om en ’s
D
Re cr ea tio n Bu ild in g
Enlarged New Site Plan
Building “A” Floor Plan- Men’s Dorm
Building A 782 sqft
Building B 8002 sqft
Building “B” Floor Plan – Women’s Dorm
Door Schedule
1. 36”x 80” 20 minute fire rated assembly and self-closer, sound core exterior type door
2. 36”x 80” 20 minute fire rated assembly and self-closer, sound core exterior type door
3. 24”x80” Interior door. 20 minute fire rated assembly and self-closer. Sound core interior type door
4. 24”x80” interior door, hollow core interior door
5. 32”80” interior door. Hollow core interior door
Window Schedule
A. 48”54” horizontal side, egress type
Building “C” Floor Plan- Recreation Building Building C 8002 sqft
1. 36”x80” sound core exterior type door
2. 36”x 80” interior door, hollow core interior door
Window Schedule
48”x54” horizontal slide, egress type
General
1. Beam dimensions shown are minimum required and may not be reduced, nor enlarged without approval of the engineer.
2. No field observation is provided under this seal unless otherwise noted in writing on this plan.
3. Top of slab elevation is for reference only. The Contractor shall verify required top of slab elevation with professional land surveyor prior to setting forms.
Concrete
1. The concrete design is based upon concrete mix, yielding minimum compressive strength of 3000 psi at 28 days.
Concrete design mix shall be in accordance with ACI – 318 (latest version). No chlorides shall be allowed.
2. Laps, splices, ties and embedment lengths for reinforcing steel shall be in accordance with A.C.I manual of standard practice, details, and detailing of concrete reinforcement ACI 318, ACI 315, and in accordance with C.R.S.I. standards. Concrete work shall be in strict accordance with A.C.I. standard specification for concrete and reinforced concrete. Concrete placement shall conform to A.C.I. 301 and A.C.I. 318.
3. Compression embedment length shall be 30 bar diameters unless noted otherwise.
4. Clear distance between adjacent layers of reinforcement shall be 2 inches minimum unless noted otherwise.
5. The Contractor shall be allowed to make splices in addition to those indicated on the drawings or essential to constructability, subject to engineers’ approval.
6. Subject to the engineer's approval, bars may be shifted slightly in the field where necessary to avoid openings, pipes, embedded items, or other obstructions.
7. Hooks and bends should be in accordance with A.C.I. 318
8. Placement, clearances, and minimum concrete cover for reinforcing shall be provided in accordance with ACI
318. S
9. See architectural drawings for type of slab elevations, slopes, recesses, ledges, and steps.
10. Bottoms of excavations and earthen forms shall be flat, level, true to grade and line, and completely free of loose dirt, debris, and slush, dampen earth against which concrete is poured just prior to the pour, but do not pour into trenches with standing water.
11. Forms for exposed finish concrete: plywood, metal, metal-framed plywood faced, or other acceptable panel-type materials to provide continuous straight, smooth exposed services. Reinforcing steel shall be great 60 bar conforming to the latest edition of ASTM.
Soil
1. Soil compaction is the responsibility of the owner and general Contractor. Compaction shall be 95% standard proctor in accordance with ASTM D – 698. Foundation is designed for minimum capacity of 2000 PSF allowable bearing and a plasticity index <20. Owner shall obtain soil report to verify conditions prior to construction.
Failure to probably test or compact soil will avoid engineers design and hold engineers harmless if differential settlement occurs.
2. Remove a minimum of 8” of existing unstable soil prior to placing engineered fill material. Any trees removed must have root ball completely removed. Grinding of stump to remove will not be allowed.
3. Subgrade fill shall be AASHO classification A-4 material or better. Soil compaction tests will be required per ASTMD698 and 1557 submit results to engineer prior to proceeding with excavation of footings and filling of site. Failure to probably compact soil will void engineers design and hold engineer harmless if differential settlement occurs.
4. Exterior and interior footings do not have to penetrate below natural soil provided that a minimum of 2 to 1 slope of fill is maintained beyond foundation perimeter and compaction requirements have been met. Any fill material brought into the forms and the fill is not extending beyond perimeter must have footings penetrate into 12” inches into natural ground. A maximum 18 inches of fill may be placed on the site unless approved by Design engineer.
Maximum differential fuel shall not exceed 20%.
5. Runoff water must be carried away from slab to prevent saturation of sub-base fill during and after construction and throughout the structures’ life. It is the responsibility of the owner and general contractor to provide positive drainage away from the foundation. Any landscaping must be installed so as to not collect water at foundation edges. Trees within close proximity shall be removed to prevent root system from affecting the moisture content of the foundation and or from their roots extending under the slab. Trees within close proximity that will affect moisture conditions at the foundation edge must have a properly designed and installed root barrier system, or they must be removed prior to construction.
Site Plan
General Notes
1. Data systems by DPS under separate contract. The Contractor shall provide conduit and backboxes in the project.
2. All wiring shall be type THHN. Modular building panel feeders shall be aluminum.
3. Electrical conduits shall be SCH. 40 gray PVC run under the modular buildings. Feeders shall be run from MDP to each modular building power panel. Exact routing shall be determined in field. Utilize junction boxes or lb fittings as required. Coordinate exact requirements with successful modular building contractor.
4. Ground shall be in accordance with NEC Article 250.
5. The Contractor shall provide 1 year warranty for labor and materials. All equipment shall be installed in accordance with manufacturer’s recommendations.
6. The Contractor shall clean surplus materials from site upon completion and leave site equal to pre-contruction quality.
7. Installation shall conform to NEC and local/state requirements.
8. The Contractor shall Provide new 2” conduit for data. Route conduit to utility pole.
9. The Contractor shall coordinate exact location of power panels, sewer and water connections in new modular buildings prior to running conduit and piping. Make adjustments as necessary.
10. For all new openings in walls; seal, patch and paint to match existing wall. Opening shall be slightly larger than conduit, neatly cut/cored as applicable. Page 13 of 17
11. The Contractor shall route wiring in modular buildings above ceiling. Use surface mounted plastic raceway from exposed drops to devices.
12. Modular buildings are pre-plumbed with a single point connection and have one power panel. The Contractor shall verify in field. Note: If buildings are not pre-plumbed or have more than one panel, notify engineer.
13. The Contractor shall coordinate electrical service with Entergy.
The Contractor shall be responsible for the following:
1. Connect to existing sewer treatment plant. Coordinate in field.
2. Connect to existing water main. Verify in field.
3. Underground electrical feeder.
4. Electrical up from U.G. provide weatherproof junction box.
5. Connect to existing modular building panel. Verify in field ground per NEC 250.
6. Connect to modular building water. Provide ball valve. Verify in field.
7. 2” fire water to riser.
8. 2” it conduit with pullstring U.G. from utility pole to it rack. Verify exact location in field.
9. U.G. 2” IT conduit with pullstring from building to building it racks. Verify in field.
10. U.G. Fire alarm conduit linking buildings.
11. Power for heater. Homerun to 20A, 1P breaker in panel MDP.
12. Provide tamper switches for valves in hot box.
13. Proposed location of post mounted FDC. Provide check valve per NFPA-13R requirements.
14. Thrust block per NFPA-13R.
Building “A” Floor Plan Men’s Dorm
Building “B” Floor Plan Women’s Dorm
Building “C” Floor Plan Recreation Building
GENERAL ELECTRICAL NOTES THIS SHEET:
1. ALL WIRING SHALL BE TYPE THHN.
2. UNDERGROUND CONDUITS SHALL BE SCH. 40 GRAY PVC BURIED 24" DEEP. PROVIDE METALLIC TRACER TAPE 12" ABOVE
CONDUITS. SCHEMATIC ROUTING SHOWN ON DRAWING, VERIFY EXACT ROUTING IN FIELD.
3. ABOVE GROUND CONDUIT SHALL BE RIGID GALVANIZED CONDUIT. UTILIZE JUNCTION BOXES OR LB FITTINGS AS
REQUIRED.
4. GROUNDING SHALL BE IN ACCORDANCE WITH NEC ARTICLE 250.
5. PROVIDE 1 YEAR WARRANTY FOR LABOR AND MATERIALS. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL CLEAN SURPLUS MATERIALS FROM SITE UPON COMPLETION AND LEAVE SITE EQUAL TO PRE-
CONSTRUCTION QUALITY.
7. EXCAVATION AND TRENCHING SHALL BE AS REQUIRED FOR NUMBER OF CONDUITS RUN. BACKFILL WITH SUITABLE
MATERIALS.
8. INSTALLATION SHALL CONFORM TO NEC AND LOCAL/STATE REQUIREMENTS.
9. PROVIDE 3 NEW 2" CONDUITS FOR FIRE ALARM, INTERCOM AND (1) SPARE FOR DATA. STUBOUT ABOVE CEILING IN
EXISTING BUILDING.
10. COORDINATE EXACT LOCATION OF POWER PANELS IN NEW MODULAR BUILDINGS PRIOR TO RUNNING CONDUIT. MAKE
ADJUSTMENTS AS NECESSARY.
11. FOR ALL NEW OPENINGS IN WALLS; SEAL, PATCH AND PAINT TO MATCH EXISTING WALL. OPENING SHALL BE SLIGHTLY
LARGER THAN CONDUIT,NEATLY CUT/CORED AS APPLICABLE.
12. ROUTE WIRING IN MODULAR BUILDINGS ABOVE LAY-IN CEILING. USE SURFACE MOUNTED METAL RACEWAY FOR
EXPOSED DROPS TO DEVICES.
13. ALL CONDUIT RUNS THROUGH EXISTING CANOPIES OR BUILDINGS SHALL BE RUN IN A NEAT WORKMANLIKE MANNER, PARALLEL TO BUILDING LINES AND CONCEALED WHERE POSSIBLE. REMOVE AND REINSTALL CEILING TILES AS REQUIRED.
ON CANOPIES RUN IN PIPE RACKS WITHOUT CAUSING A VISUAL DISTRACTION AND MAINTAIN THE MAXIMUM HEADROOM
POSSIBLE. COORDINATE EXACT ROUTING WITH ARCHITECT PRIOR TO INSTALLATION.
14. AT CONTRACTORS OPTION CONDUITS MAY BE DIRECTIONALLY BORED.
GENERAL MECHANICAL NOTES THIS SHEET:
1. MODULAR BUILDINGS ARE PRE-PLUMBED WITH SINGLE POINT CW & SS CONNECTIONS.
2. COORDINATE EXACT LOCATION OF WATER AND SEWER TIE-IN WITH MODULAR BUILDING.
3. SEWER PIPING SHALL BE SCH. 40 SOLID CORE PVC WITH SOLVENT WELD FITTINGS.
4. WATER PIPING SHALL BE HDPE SDR-9.
GENERAL FIRE PROTECTION NOTES THIS SHEET:
1. ENTIRE BUILDING SHALL BE PROTECTED WITH NFPA-13R
SPRINKLER SYSTEM.
2. ALL INTERIOR PIPING SHALL BE CPVC RUN CONCEALED.
3. ALL SPRINKLER HEADS SHALL BE LISTED RESIDENTIAL TYPE.
SPECIFIC NOTES THIS SHEET:
1. FIRE ALARM JUNCTION BOX. PROVIDE POWER FROM EXISTING PANEL.
2. HOMERUN TO 20A BREAKER IN MODULAR BUILDING PANEL.