This is a Scope of Work specification document for the Louisiana Department of Public Safety and Corrections (DPS) related to RFx 3000026791, which involves the demolition of an existing building structure and construction of four modular buildings at the DPS facility located at Building Housing Unit 6868 Nicholson Drive, Baton Rouge, Louisiana 70820. The contractor must provide all labor, equipment, supplies, and materials necessary to complete both the demolition and modular building installation phases. A mandatory jobsite visit is required, with Chief Ed Branch serving as the site visit contact (office: 225-925-4911; cell: 985-515-5864; email: ed.branch2@la.gov). The scope encompasses locating and verifying all existing utilities, coordinating disconnection of electrical, water, sanitary sewer, storm drainage, natural gas, communications, and fire protection systems, and ensuring proper abandonment of utilities according to provider and jurisdictional requirements. The demolition phase requires removal of the entire building structure including all interior and exterior components, mechanical and electrical systems, below-grade elements, and all associated debris, which must be disposed of at approved facilities. The contractor must maintain safe pedestrian and vehicle access throughout the project, control dust and debris, manage drainage and erosion, and deliver the site in a clean, safe, and stable condition ready for new construction.
The modular buildings must be furnished, delivered, set, installed, and completed in accordance with all contract documents, manufacturer specifications, and applicable codes and regulations. Site preparation requirements include constructing foundations per structural drawings, performing site grading and drainage work, establishing crane pads and staging areas, and verifying final finished floor elevations prior to modular unit installation. The contractor is responsible for protecting existing structures, utilities, pavement, and landscaping during all phases of work and for coordinating operations with the DPS owner, utility providers, and relevant authorities. The specifications emphasize that utilities must be located through actual field investigation rather than reliance on existing drawings or records, and that all utility companies and locating services must be contacted prior to excavation. No pricing terms, set-aside provisions, funding sources, or contract award dates are specified in this document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3000026791-2.pdf | ||
| Addendum No. 2 - Calendar of Events Revision.docx | DOCX document | |
| Addendum No. 1 - Calendar of Events Revision.docx | DOCX document | |
| 3000026791-1.pdf | ||
| Revised Attachment A - Special Terms and Conditions Pages 1-14.docx | DOCX document | |
| 3000026791.pdf | ||
| Attachment A - Special Terms and Conditions Pages 1-14.docx | DOCX document | |
| Attachment B - Job Site Verification Form - Page 1.docx | DOCX document | |
| Attachment D - Building Plans - Pages 1-17.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C – Specifications RFx 3000026791
Scope of Work:
The Contractor shall supply all labor, equipment, supplies, and materials to complete the demolition of a building structure and construction of four modular buildings for the Department of Public Safety and Corrections (DPS).
Location:
Building Housing Unit 6868 Nicholson Drive Baton Rouge, LA 70820
Site Visit Contact:
Chief Ed Branch, ed.branch2@la.gov, Office: (225) 925-4911, Cell: (985) 515-5864
Specifications:
The Contractor shall be responsible for the following:
Existing Utilities
· The Contractor shall locate and verify all existing underground and aboveground utilities before beginning demolition or excavation by performing the mandatory jobsite visit.
· The Contractor shall coordinate disconnection of electrical, water, sanitary sewer, storm drainage, natural gas, communications, fire protection and other utilities serving structures to be demolished.
· Utilities to be abandoned shall be disconnected, capped, plugged, or otherwise terminated in accordance with the requirements of the utility provider and authority having jurisdiction
· Existing utilities, serving structures or site areas to remain shall be protected and maintained in service. Any unknown or unidentified utility encountered during demolition shall be treated as active until verified otherwise. The Contractor shall immediately notify the owner of any unidentified utility or condition that may affect the work Building Demolition
· Removing existing structures indicated on the drawings in their entirety, including building components, interior and exterior finishes, roofing, mechanical, electrical, plumbing, site connections, and other associated work unless specifically noted to remain.
· Removing existing fountains, footings, piers, slabs, aprons, and other below-grade structural elements associated with structures being removed, unless specifically indicated to remain.
· Removing existing debris, abandoned equipment, concrete, masonry, metal, wood, and other materials within the demolition area.
· Removing demolition debris from the site and dispose of materials at a legal and approved disposal facility.
· The Contractor shall not burn, bury, or abandon demolition debris on the project site.
· Demolition shall be performed in a sequence that prevents damage to existing structures, utilities, pavement, landscaping, and other items to remain.
Site demolition
· Removing existing walks, curbs, pavement, concrete, aprons, site structures, fencing, signage, light poles, site equipment, and other side improvements indicated for removal.
· Protecting existing trees, landscaping, pavement, utilities, drainage structures, and other site features indicated to remain.
· Providing temporary fencing and barricades as required to separate demolition operations from occupied areas and public access.
· Maintain safe, pedestrian and vehicle access throughout the project as required by the Agency.
· The Contractor shall control dust, mud, debris, and other conditions resulting from demolition operations.
· Drainage and erosion control.
· Maintaining existing drainage patterns during demolition and site preparation unless otherwise indicated
· Protecting existing catch basins, train structures, ditches, culvert, and storm drain systems to remain.
· The Contractor shall not allow any demolition debris, soil, concrete, or other materials to enter existing drainage systems.
Final Site Condition
· Upon completion of demolition, the Contractor shall leave the site clean, safe, stable, and ready for subsequent construction.
· Removing all demolition debris, temporary facilities, equipment, and unused material from the site.
· Removing all unsuitable material, organic material, debris and abandoned construction from areas to receive new work.
· Capping & securing all abandoned utilities as required.
· Backfilling and compacting all excavations and voids created by demolition as required for the new work.
· Providing temporary stabilization of disturbed areas until the final site construction commences.
· The Agency shall accept the site prior to commencement of new construction in the affected area.
Renovation Site Plans
· The modular buildings shall be furnished delivered, set, installed, connected, and completed in accordance with the contract documents, approved modular building manufacturer's drawings, engineers, documents, specifications, and all applicable codes and regulations.
· The modular building manufacturer and installing contractor shall review all contract documents prior to fabrication, delivery, and installation
· All modular building components shall be designed, fabricated, transported, set, anchored, and installed in accordance with the requirements of the approved modular building system.
· Field verify existing conditions, including grades, foundations, utility locations, access conditions, and dimensions, prior to fabrication or installation
Foundation
· Foundations shall be constructed in accordance with the structural drawings and approved modular building manufacturers’ requirements.
· Foundation dimensions, elevations, anchor locations, bearing conditions, and connection requirements shall be verified prior to delivery of modular building units.
· The Contractor shall verify that foundations are complete, cured, and ready to receive modular units prior to scheduling delivery.
Site preparation
· Site preparation shall be completed prior to delivery of modular building units.
· Providing required site grading, drainage, access roads, crane pads, staging areas, and other site improvements required for delivery and authorization.
· Site grades shall provide positive drainage away from the modular buildings.
· Verifying final finished floor elevations prior to setting the modular units.
· The Contractor shall maintain access for delivery trucks, cranes, rigging equipment, fire department access, and emergency vehicles throughout the installation process.
· Protecting completed site work, utilities, pavements, landscaping, and existing structures during delivery and installation.
General Terms:
· Demolition shall be performed in a safe and controlled manner. The Contractor shall provide all shoring, bracing, barricades, fencing, dust control, temporary protection, and other measures required to protect persons, existing property, and adjacent construction.
· The Contractor shall be responsible for maintaining the structural stability of all existing structures, site features, and adjacent construction that are to remain.
· Do not remove, cut, damage, or disconnect any existing system or component that is to remain in service.
· The Contractor shall coordinate demolition operations with the owner, utility providers, and all appropriate authorities having jurisdiction.
· Utilities shall be located by actual field investigation. Do not rely solely upon existing drawings or utility records.
· The Contractor shall contact all appropriate utility companies and utilize the appropriate utility locating service before excavation.