Horseshoe Lake SP Pump Station Sheet Pile Material
Closed State & local contract opportunity Posted
- Solicitation number
- 26-422DNR-REALT-B-53121
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Kara Glaub kara.m.glaub@illinois.gov (217) 557-1235
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The State of Illinois Department of Natural Resources is conducting an emergency purchase of sheet piling materials to stabilize a causeway at Horseshoe Lake State Park in Madison County, with bids due September 20, 2026.
The scope comprises 44 pieces of PZC 18 domestic hot rolled steel sheet piling, each 40 feet in length, rolled to ASTM A-572 grade 50 specifications, uncoated, with handling holes and weighing 50.40 pounds per linear foot; and 4 US 90 corner connectors, each 40 feet in length. All materials must be new, unused, and free from defect.
The emergency procurement classification may shorten standard competitive bidding procedures and timelines to accommodate urgent causeway stabilization needs. No estimated contract value, incumbent vendor, evaluation criteria, or question deadline is identified in the posting.
Opportunity text
Emergency Purchase of materials to stabilize a causeway at Horseshoe Lake State Park in Madison County. New PZC 18 Domestic Hot Rolled Steel Sheet Piling. Rolled in accordance with ASTM A-572 gr 50 specifications, uncoated. In singles with handling holes. 44 pieces. Length - 40. Weight per linear foot - 50.40. US 90 Corner Connectors. 4 pieces. Length - 40. Product must be new, unused and free from defect.
Files
| File | Type | Posted |
|---|---|---|
| State of Illinois - natural resources 53121 - 26-422DNR-REALT-B-53121.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity