HMA Resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue

Closed State & local contract opportunity Posted

Solicitation number
61M64
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Illinois Department of Transportation (IDOT) is requesting bids for HMA resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue in the Villages of Western Springs and La Grange, Cook County, with electronic bids due September 18, 2026 at 12:00 p.m. via the iCX-Integrated Contractors Exchange system. The project is subject to prevailing wage requirements and includes DBE reporting provisions under Illinois public works law.

The scope spans 5,361.37 feet (1.015 miles gross length) and includes HMA surface removal and resurfacing, patching, curb and gutter repairs, sidewalk repairs with ADA-compliant ramps, drainage structure adjustments and replacements, solar-powered flashing beacon installations, pavement markings, and miscellaneous related work. AT&T utility manholes require frame and cover adjustments. The contract will be awarded to the lowest responsive and responsible bidder based on competitive unit pricing across multiple line items.

Construction cannot begin before June 1, 2027, with required completion by August 6, 2027, plus 10 working days for parkway restoration, cleanup, and punch list items. Working hours are restricted to 7:30 a.m. to 8:00 p.m. weekdays and 9:00 a.m. to 5:00 p.m. Saturdays, with no Sunday work permitted. Construction must align with summer breaks for Lyons Township High School and Nazareth Academy.

Contractors must comply with BNSF Railway requirements, including mandatory Right of Entry permits, contractor orientation training, and E-rail safe ID badges for all workers in railroad right-of-way. BNSF flagger requirements apply between 9:30 a.m. and 2:30 p.m. Monday through Friday on Gilbert Avenue and Hillgrove Avenue. Supplemental sod watering must occur a minimum of twice weekly with liquidated damages of $20 per square yard per day for late completion.

Opportunity text

The work consists of HMA surface removal and resurfacing of Gilbert Avenue with patching, curb repairs, sidewalk repairs, intersection ADA improvements, drainage structure adjustments and replacements, flashing beacons, and pavement markings and miscellaneous items of work required to complete the project as shown on the plans and described herein. Location: The project is located on Gilbert Avenue, from 47th Street to Ogden Avenue, in the Village of Western Springs and the Village of La Grange, Cook County, Illinois. A location map is shown on the cover of the Plans. Gross Length: 5,361.37 Ft. (1.015 Miles). Net Length: 5,314.83 Ft. (1.006 Miles).

Files

File Type Posted
ILDOT 61M64-029.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors