This is a Notice to Bidders and Specifications document issued by the Illinois Department of Transportation (IDOT) for Contract No. 61M64, a road construction project in Cook County involving the Village of Western Springs and the Village of La Grange. The work consists of HMA surface removal and resurfacing of Gilbert Avenue (FAU 2697, Section 25-00105-00-RS) from 47th Street to Ogden Avenue, spanning 5,361.37 feet (1.015 miles gross length) and 5,314.83 feet (1.006 miles net length). The project scope includes patching, curb and gutter repairs, sidewalk repairs with ADA-compliant ramps, drainage structure adjustments and replacements, solar-powered flashing beacon installations, pavement markings, and miscellaneous related work. Electronic bids must be submitted to the iCX-Integrated Contractors Exchange system no later than 12:00 p.m. on September 18, 2026, at which time bids will be publicly opened. Construction shall not begin prior to June 1, 2027, with a required completion date of August 6, 2027, plus 10 working days for parkway restoration, cleanup, and punch list items. Contractors must comply with BNSF Railway requirements, including mandatory Right of Entry permits, contractor orientation training, and E-rail safe ID badges for all workers in railroad right-of-way. The contract will be awarded to the lowest responsive and responsible bidder.
Pricing will be determined through competitive unit pricing for various line items including HMA resurfacing, patching, curb and gutter construction, sidewalk installation, drainage structure work, tree protection services, and temporary traffic control. The contract is subject to prevailing wage requirements under Illinois public works law and includes provisions for employment practices, apprenticeship participation, and DBE (Disadvantaged Business Enterprise) reporting. AT&T utility manholes require frame and cover adjustments with an estimated 5-day duration for completion. Supplemental watering of sod is required at a minimum of twice weekly with liquidated damages of $20 per square yard per day for failure to complete plant care work on time. Working hours are restricted to 7:30 a.m. to 8:00 p.m. weekdays and 9:00 a.m. to 5:00 p.m. Saturdays, with no Sunday work permitted. The project is aligned with summer breaks for Lyons Township High School and Nazareth Academy. Construction must comply with BNSF Railway flagger requirements between 9:30 a.m. and 2:30 p.m. Monday through Friday on Gilbert Avenue and Hillgrove Avenue.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting September 18, 2026
Notice to Bidders, Specifications and Proposal
Contract No. 61M64 COOK County Section 25-00105-00-RS (Western Springs) Route FAU 2697 (Gilbert Avenue) Project 6H4Z-948 () District 1 Construction Funds
Prepared by F
Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
September 18, 2026 at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Contract No. 61M64 COOK County Section 25-00105-00-RS (Western Springs) Project 6H4Z-948 () Route FAU 2697 (Gilbert Avenue) District 1 Construction Funds
HMA resurfacing on Gilbert Avenue from 47th Street to Ogden Avenue in Western Springs. Includes patching, curb & gutter, sidewalks with ADA ramps, drainage improvements and flashing beacons.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
CONTRACT 61M64
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 Additional State Requirements for Federal-Aid Construction Contracts 2 Subletting of Contracts (Federal-Aid Contracts)
3 EEO
4 Specific EEO Responsibilities Non Federal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos HMA Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays
LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS
Table of Contents
CHECK SHEET # PAGE NO.
LRS 1 Reserved LRS 2 Furnished Excavation LRS 3 Work Zone Traffic Control Surveillance LRS 4 Flaggers in Work Zones LRS 5 Contract Claims LRS 6 Bidding Requirements and Conditions for Contract Proposals LRS 7 Bidding Requirements and Conditions for Material Proposals LRS 8 Reserved LRS 9 Bituminous Surface Treatments LRS 10 Reserved LRS 11 Employment Practices LRS 12 Wages of Employees on Public Works LRS 13 Selection of Labor LRS 14 Paving Brick and Concrete Paver Pavements and Sidewalks LRS 15 Partial Payments LRS 16 Protests on Local Lettings LRS 17 Substance Abuse Prevention Program LRS 18 Multigrade Cold Mix Asphalt LRS 19 Reflective Crack Control Treatment
INDEX OF SPECIAL PROVISIONS
PAGE NO.
LOCATION OF PROJECT
DESCRIPTION OF WORK
MAINTENANCE OF ROADWAYS
WORKING HOURS
PROSECUTION AND PROGRESS
COMPLETION DATE PLUS WORKING DAYS (D1)
RAILROAD RIGHT OF ENTRY PERMIT
AVAILABLE REPORTS (D1 LR)
STATUS OF UTILITIES (D-1)
TRAFFIC CONTROL PLAN (D1)
PUBLIC CONVENIENCE AND SAFETY (D-1)
PROTECTION OF EXISTING TREES
SUPPLEMENTAL WATERING
FAILURE TO COMPLETE PLANT CARE AND ESTABLISHMENT WORK ON TIME
AGGREGATE BASE COURSE, TYPE B
DETECTABLE WARNINGS
CLASS B PATCHES
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES
DRAINAGE AND UTILITY STRUCTURES TO BE ADJUSTED
DRAINAGE AND UTILITY STRUCTURES TO BE RECONSTRUCTED
SANITARY MANHOLE, 4’ DIAMETER
HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT
SOLAR-POWERED FLASHING BEACON ASSEMBLY (COMPLETE)
REMOVE AND REINSTALL BRICK PAVER
PORTLAND CEMENT CONCRETE DRIVEWAY 7 INCH (SPECIAL)
PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH (SPECIAL)
VALVE VAULTS TO BE REMOVED
FRAMES AND LIDS TO BE ADJUSTED (SPECIAL)
COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 (SPECIAL)
INDEX OF SPECIAL PROVISIONS (CONT.)
PAGE NO.
TEMPORARY INFORMATION SIGNING
RECESSED REFLECTIVE PAVEMENT MARKER (HMA)
DETECTOR LOOP REPLACEMENT AND/OR INSTALLATION (ROADWAY GRINDING,
RESURFACING, & PATCHING OPERATIONS)
ADJUSTMENTS AND RECONSTRUCTIONS (D-1)
DRAINAGE AND INLET PROTECTION UNDER TRAFFIC (D1)
AGGREGATE SURFACE COURSE FOR TEMPORARY ACCESS (D1)
HOT-MIX ASPHALT BINDER AND SURFACE COURSE (D1)
HOT-MIX ASPHALT – MIXTURE DESIGN VERIFICATION AND PRODUCTION (D1)
FRICTION AGGREGATE (D-1)
MINERALIZED CARBON DIOXIDE CONCRETE (D-1)
L107-4…………………………………………………………………………………………………….51
LR1030-2…………………………………………………………………………………………………52
BNSF DOCS…………………………………………………………………………..…………………54
MWRD PERMIT…………………………………………………………………………………………80
BDE SPECIAL PROVISIONS
The following special provisions indicated by an “X” are applicable to this contract. An * indicates a new or revised special provision for the letting.
File Name Pg. Special Provision Title Effective Revised 80099 Accessible Pedestrian Signals (APS) April 1, 2003 Jan. 1, 2022 _ 80274 Aggregate Subgrade Improvement April 1, 2012 April 1, 2022 80192 Automated Flagger Assistance Device Jan. 1, 2008 April 1, 2023 80173 Bituminous Materials Cost Adjustments Nov. 2, 2006 Aug. 1, 2017 80426 Bituminous Surface Treatment with Fog Seal Jan. 1, 2020 April 1, 2026 80475 Bridge Deck Concrete Overlays Jan. 1, 2026 80241 Bridge Demolition Debris July 1, 2009
5053I Building Removal Sept. 1, 1990 Aug. 1, 2022 5026I Building Removal with Asbestos Abatement Sept. 1, 1990 Aug. 1, 2022
80460 83 Cement, Finely Divided Minerals, Admixtures, Concrete, and Mortar Jan. 1, 2025 Jan. 1, 2026 80384 100 Compensable Delay Costs June 2, 2017 April 1, 2019 80198 Completion Date (via calendar days) April 1, 2008 80199 Completion Date (via calendar days) Plus Working Days April 1, 2008 80461 Concrete Barrier Jan. 1, 2025 80453 Concrete Sealer Nov. 1, 2023 80261 104 Construction Air Quality – Diesel Retrofit June 1, 2010 Jan. 1, 2025 80476 Deck Slab Repair Jan. 1, 2026
* 80029 106 Disadvantaged Business Enterprise Participation Sept. 1, 2000 July 2, 2026 80467 Erosion Control Blanket Aug. 1, 2025 80229 Fuel Cost Adjustment April 1, 2009 Aug. 1, 2017 80452 Full Lane Sealant Waterproofing System Nov. 1, 2023 80433 Green Preformed Thermoplastic Pavement Markings Jan. 1, 2021 Jan. 1, 2022 80471 Guardrail Nov. 1, 2025 80472 High Friction Surface Treatment Nov. 1, 2025 80456 Hot-Mix Asphalt Jan. 1, 2024 April 1, 2026 80446 110 Hot-Mix Asphalt – Longitudinal Joint Sealant Nov. 1, 2022 Aug. 1, 2023 80438 Illinois Works Apprenticeship Initiative – State Funded Contracts June 2, 2021 April 2, 2024 80483 112 Inlet Filters April 1, 2026
* 80477 Longitudinal Tining Jan. 1, 2026 July 1, 2026 80450 Mechanically Stabilized Earth Retaining Walls Aug. 1, 2023 Aug. 1, 2025 80478 Modified Longitudinal Construction Joint Jan. 1, 2026 80464 114 Pavement Marking April 1, 2025 Nov. 1, 2025 80468 115 Pavement Patching Aug. 1, 2025 80441 116 Performance Graded Asphalt Binder Jan 1, 2023 April 1, 2026 80459 Preformed Plastic Pavement Marking June 2, 2024 3426I 122 Railroad Protective Liability Insurance Dec. 1, 1986 Jan. 1, 2022 80473 Raised Reflective Pavement Markers Nov. 1, 2025 80455 123 Removal and Disposal of Regulated Substances Jan. 1, 2024 April 1, 2026 80474 Residential Driveway Temporary Signal Nov. 1, 2025
* 80445 Seeding Nov. 1, 2022 July 1, 2026 80457 125 Short Term and Temporary Pavement Markings April 1, 2024 April 2, 2024 80462 129 Sign Panels and Appurtenances Jan. 1, 2025 Jan. 1, 2026 80479 Sinusoidal Rumble Strips Jan. 1, 2026 80469 Slope Wall Aug. 1, 2025 80448 131 Source of Supply and Quality Requirements Jan. 2, 2023 Jan. 1, 2026 80340 Speed Display Trailer April 2, 2014 Jan. 1, 2022 80127 Steel Cost Adjustment April 2, 2004 Nov. 1, 2025 80480 Structural Repair of Concrete Jan. 1, 2026 80397 133 Subcontractor and DBE Payment Reporting April 2, 2018 80391 134 Subcontractor Mobilization Payments Nov. 2, 2017 April 1, 2019 80463 135 Submission of Bidders List Information Jan. 2, 2025 Mar. 2, 2025
File Name Pg. Special Provision Title Effective Revised 80482 136 Submission of Payroll Records – Federal Aid Contract April 1, 2026 80437 Submission of Payroll Records – State Contract April 1, 2021 April 1, 2026 80435 Surface Testing of Pavements – IRI Jan. 1, 2021 Jan. 1, 2023 80465 138 Surveying Services April 1, 2025 80481 Temporary Concrete Barrier Jan. 1, 2026 80466 Temporary Rumble Strips April 1, 2025
* 80484 Tolerance in Thickness for Continuously Reinforced PCC Pavement July 1, 2026 80470 Traffic Signal Backplate Aug. 1, 2025 20338 Training Special Provisions Oct. 15, 1975 Sept. 2, 2021 80429 Ultra-Thin Bonded Wearing Course April 1, 2020 Jan. 1, 2022 80439 139 Vehicle and Equipment Warning Lights Nov. 1, 2021 Nov. 1, 2022 80458 Waterproofing Membrane System Aug. 1, 2024 80302 140 Weekly DBE Trucking Reports June 2, 2012 Jan. 2, 2025 80454 Wood Sign Support Nov. 1, 2023 80427 141 Work Zone Traffic Control Devices Mar. 2, 2020 Jan. 1, 2026
* 80485 144 Work Zone Width Restriction July 1, 2026 80071 Working Days Jan. 1, 2002
Village of Western Springs Village of La Grange Gilbert Avenue FAU 2697
25-00105-00-RS
Cook County Contract 61M64
- 1 -
STATE OF ILLINOIS
SPECIAL PROVISIONS
CONTRACT NO: 61M64
The following Special Provisions supplement the "Standard Specifications for Road and
Bridge Construction", adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of Gilbert Avenue, and in case of conflict with any part, or parts, of said Specifications, the said Special Provisions shall take precedence and shall govern.
Section: 25-00105-00-RS, Project No. 6H4Z(948), Job No. C-91-293-26.
LOCATION OF PROJECT
The project is located on Gilbert Avenue, from 47th Street to Ogden Avenue, in the Village of Western Springs and the Village of La Grange, Cook County, Illinois. A location map is shown on the cover of the Plans. Gross Length: 5,361.37 Ft. (1.015 Miles). Net Length: 5,314.83 Ft.
(1.006 Miles).
DESCRIPTION OF WORK
The work consists of HMA surface removal and resurfacing of Gilbert Avenue with patching, curb repairs, sidewalk repairs, intersection ADA improvements, drainage structure adjustments and replacements, flashing beacons, and pavement markings and miscellaneous items of work required to complete the project as shown on the plans and described herein.
MAINTENANCE OF ROADWAYS
Effective: September 30, 1985 Revised: November 1, 1996
Beginning on the date that work begins on this project, the Contractor shall assume responsibility for normal maintenance of all existing roadways within the limits of the improvement.
This normal maintenance shall include all repair work deemed necessary by the Engineer, but shall not include snow removal operations. Traffic control and protection for maintenance of roadways will be provided by the Contractor as required by the Engineer.
If items of work have not been provided in the contract, or otherwise specified for payment, such items, including the accompanying traffic control and protection required by the Engineer, will be paid for in accordance with Article 109.04 of the Standard Specifications.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 2 -
WORKING HOURS
The Contractor will be required to comply with state regulations regarding air, water and noise pollution. Construction operations shall be confined to the period beginning at 7:30 A.M.
and ending at 8:00 P.M. Weekdays, 9:00 A.M. to 5:00 P.M. Saturday, and no work shall be performed on Sundays or holidays. 48-hour notice from the Contractor shall be required for Saturday work. Work hours are detailed in 5-2-3 of the Village Code, per village ordinance 2023- 3149.
Per BNSF Railway, the Contractor shall perform all work that requires a flagger on Gilbert
Avenue and Hillgrove Avenue between 9:30 A.M. to 2:30 P.M. Monday through Friday.
PROSECUTION AND PROGRESS
Construction shall not begin prior to June 1st, 2027. Construction schedule is intended to align with summer break for Lyons Township High School. Tentative School Calendar can be found at the below link for reference.
https://www.lths.net/fs/resource-manager/view/95b3c351-8669-4d80-a9f6-db67f79d3c44
Construction schedule is also intended to align with summer break for Nazareth Academy.
Tentative School Calendar can be found at the below link for reference.
https://www.nazarethacademy.com/s/157/new/index.aspx?pgid=552&gid=1
COMPLETION DATE PLUS WORKING DAYS (D1)
Effective: September 30, 1985 Revised: January 1, 2007
Revise Article 108.05 (b) of the Standard Specifications as follows:
"When a completion date plus working days is specified, the Contractor shall complete all contract items and safely open all roadways to traffic by 11:59 PM on, August 6th, 2027 except as specified herein.
The Contractor will be allowed to complete all parkway restoration, clean-up work, and punch list items within _10_ working days after the completion date for opening the roadway to traffic. Under extenuating circumstances the Engineer may direct that certain items of work, not affecting the safe opening of the roadway to traffic, may be completed within the working days allowed for clean-up work and punch list items. Temporary lane closures for this work may be allowed at the discretion of the Engineer.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 3 -
Article 108.09 or the Special Provision for “Failure to Complete the Work on Time”, if included in this contract, shall apply to both the completion date and the number of working days.
RAILROAD RIGHT OF ENTRY PERMIT
A BNSF Railway “Right of Entry” permit is required for work in the railroad ROW.
Additionally, the contractor shall take the contractor orientation course at www.bnsfcontractor.com and take the BNSF exam. All workers on or inside railroad row shall take the exam. E-rail safe ID badges shall be worn at all times while inside the railroad row.
The Contractor shall execute all necessary permit forms, provide and pay for any fee and bond requirements, and execute and comply with all insurance and performance guarantee requirements. Work required to comply with these requirements shall be included as part of the contract.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 4 -
AVAILABLE REPORTS (D1 LR)
Effective: July 1, 2021.
Revised: January 22, 2026
☐ No project specific reports were prepared.
When applicable, the following checked reports and record information is available for Bidders’ reference upon request:
☐ Record structural plans
☐ Preliminary Site Investigation (PSI) (IDOT ROW)
☐ Preliminary Site Investigation (PSI) (Local ROW)
☐ Preliminary Environmental Site Assessment (PESA) (IDOT ROW)
☒ Preliminary Environmental Site Assessment (PESA) (Local ROW)
☐ Soils/Geotechnical Report
☐ Boring Logs
☒ Pavement Cores
☐ Location Drainage Study (LDS)
☐ Hydraulic Report
☐ Noise Analysis
☐ Other:
Those seeking these reports should request access from:
Sully Hyder Baxter & Woodman, Inc.
shyder@baxterwoodman.com 815-444-4475 Available 7:30AM – 5 PM Monday-Thursday and 7:30AM – 12:30PM Friday
Gilbert Avenue FAU 2697
25-00105-00-RS
- 5 -
STATUS OF UTILITIES (D-1)
Effective: June 1, 2016 Revised: April 1, 2025
Utility companies and/or municipal owners located within the construction limits of this project have provided the following information regarding their facilities and the proposed improvements. The tables below contain a description of specific conflicts to be resolved and/or facilities which will require some action on the part of the Department’s contractor to proceed with work. Each table entry includes an identification of the action necessary and, if applicable, the estimated duration required for the resolution.
UTILITIES TO BE ADJUSTED
Conflicts noted below have been identified by following the suggested staging plan included in the contract. The company has been notified of all conflicts and will be required to obtain the necessary permits to complete their work; in some instances, resolution will be a function of the construction staging. The responsible agency must relocate, or complete new installations as noted below; this work has been deemed necessary to be complete for the Department’s contractor to then work in the stage under which the item has been listed.
STAGE/
LOCATION
TYPE DESCRIPTION
RESPONSIBLE
AGENCY
DURATION
OF TIME
Sta, 16+79, 15’ RT Sta, 23+17, 14’ RT Sta, 24+11, 30’ RT Sta. 35+27, 5’ LT Sta. 36+79, 9’ LT Sta. 37+02, 11’ LT
AT&T MH #296
AT&T MH #295
AT&T MH #173
AT&T MH #135
AT&T MH #134
AT&T MH #134
AT&T Manholes in the pavement require frame & cover adjustment due to roadway resurfacing.
AT&T 5 days
UTILITIES TO BE WATCHED AND PROTECTED
The areas of concern noted below have been identified by following the suggested staging plan included for the contract. The information provided is not a comprehensive list of all remaining utilities, but those which during coordination were identified as ones which might require the Department’s contractor to take into consideration when making the determination of the means and methods that would be required to construct the proposed improvement. In some instances, the contractor will be responsible to notify the owner in advance of the work to take place so necessary staffing on the owner’s part can be secured.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 6 -
The following contact information is what was used during the preparation of the plans as provided by the owner of the facility.
STAGE /
LOCATION
TYPE DESCRIPTION OWNER
Gilbert Ave from 47th Street to Ogden Ave
Aerial Lines running across Gilbert Ave
There are no conflicts with the proposed improvements
AT&T
Gilbert Ave from 47th Street to Ogden Ave
Conduit lines running through East side of Gilbert Ave
There are no conflicts with the proposed improvements
AT&T
Gilbert Ave from 47th Street to Ogden Ave
Buried lines running under Gilbert Ave
There are no conflicts with the proposed improvements
AT&T
Gilbert Ave from 47th Street to Ogden Ave
Conduit lines running throughout the Project
There are no conflicts with the proposed improvements ComEd
Gilbert Ave from 47th Street to Ogden Ave
Underground gas main running under East and West side of the road for the length of the project
There are no conflicts with the proposed improvements Nicor
Gilbert Ave from 47th Street to Ogden Ave
Underground Conduit and Fiber Lines run though Gilbert Ave Various locations
There are no conflicts with the proposed improvements Crown Castle
Gilbert Ave from 47th Street to Ogden Ave
Aerial network at the North and South ends of Gilbert Ave project limits
There are no conflicts with the proposed improvements
Turnkey Network Solutions
Gilbert Ave from 47th Street to Ogden Ave
Aerial facilities cross north and south ends of Gilbert Ave project limits
There are no conflicts with the proposed improvements RVP Fiber
Gilbert Avenue FAU 2697
25-00105-00-RS
- 7 -
Agency/Company Responsible to Resolve Conflict
Name of contact
Address Phone e-mail address
AT&T Distribution Janet C Ahern
Commerce Dr., Oakbrook, IL 60523
630-573-
G11629@att.com
ComEd Ryan Ordonez- Haggard
5100 S State Rt. 31, Crystal Lake, IL 60012
866-639-
Ryan.Ordonez- Haggard@ComEd.com
Nicor Paul Eggen
1844 Ferry Rd., Naperville, IL 60563
630-388-gasmaps@aglresources.com
Crown Castle Spencer Samios
1500 Corporate Drive.
Canonsburg, PA 15317
(412) 569-
Spencer.Samios@crowncastle.com
Turnkey Network Solutions
Chad Winkler
7020 Southbelt Drive SE Caledonia, MI 49316
616.295.6455 cwinkler@tkns.net
RVP Fiber Ryan Ranger
201 Ionia Ave SW, Grand Rapids, MI 49503
616-233-
RRANGER@USSIGNAL.COM
The above represents the best information available to the Department and is included for the convenience of the bidder. The days required for conflict resolution should be considered in the bid as this information has also been factored into the timeline identified for the project when setting the completion date. The applicable portions of the Standard Specifications for Road and Bridge Construction shall apply.
Estimated duration of time provided above for the first conflicts identified will begin on the date of the executed contract regardless of the status of the utility relocations. The responsible agencies will be working toward resolving subsequent conflicts in conjunction with contractor activities in the number of days noted.
The estimated relocation duration must be part of the progress schedule submitted by the
Gilbert Avenue FAU 2697
25-00105-00-RS
- 8 -contractor. A utility kickoff meeting will be scheduled between the Department, the Department’s contractor and the utility companies when necessary. The Department’s contractor is responsible for contacting J.U.L.I.E. prior to all excavation work.
TRAFFIC CONTROL PLAN (D1)
Effective: September 30, 1985 Revised: January 1, 2007
Traffic Control shall be according to the applicable sections of the Standard Specifications, the Supplemental Specifications, the "Illinois Manual on Uniform Traffic Control Devices for Streets and Highways", any special details and Highway Standards contained in the plans, and the Special Provisions contained herein.
Special attention is called to Article 107.09 of the Standard Specifications and the following Highway Standards, Details, Quality Standard for Work Zone Traffic Control Devices, Recurring Special Provisions and Special Provisions contained herein, relating to traffic control.
The Contractor shall contact the District One Bureau of Traffic at least 72 hours in advance of beginning work.
STANDARDS: 701006-05, 701011-04, 701301-04, 701311-03, 701501-06, 701701-10, 701801-
06, 701901-11
DETAILS:
Traffic Control and Protection for Side Roads, Intersections, and Driveways (TC-10) Typical Applications Raised Reflective Pavement Markers (snow-plow resistant) (TC-11) Typical Pavement Markings (TC-13) Traffic Control and Protection at Turn Bays (TC-14) Short Term Pavement Marking Letter and Symbols (TC-16) Arterial Road Information Sign (TC-22) Driveway Entrance Signing (TC-26)
SPECIAL PROVISIONS:
Public Convenience and Safety (D-1) Temporary Information Signing (D-1)
Maintenance of Roadways (D-1) Work Zone Traffic Control Surveillance (LRS 3) Short Term and Temporary Pavement Marking (BDE) Vehicle and Equipment Warning Lights (BDE) Work Zone Traffic Control Devices (BDE) Work Zone Width Restriction (BDE)
Gilbert Avenue FAU 2697
25-00105-00-RS
- 9 -
PUBLIC CONVENIENCE AND SAFETY (D-1)
Effective: May 1, 2012 Revised: July 15, 2012
Add the following to the end of the fourth paragraph of Article 107.09:
“If the holiday is on a Saturday or Sunday, and is legally observed on a Friday or Monday, the length of Holiday Period for Monday or Friday shall apply.”
Add the following sentence after the Holiday Period table in the fourth paragraph of Article 107.09:
“The Length of Holiday Period for Thanksgiving shall be from 5:00 AM the Wednesday prior to 11:59 PM the Sunday After”
Delete the fifth paragraph of Article 107.09 of the Standard Specifications:
“On weekends, excluding holidays, roadways with Average Daily Traffic of 25,000 or greater, all lanes shall be open to traffic from 3:00 P.M. Friday to midnight Sunday except where structure construction or major rehabilitation makes it impractical.”
PROTECTION OF EXISTING TREES
The Contractor shall be responsible for taking measures to minimize damage to the tree limbs, tree trunks, and tree roots at each work site. All such measures shall be included in the contract price for other work except that payment will be made for TREE TRUNK PROTECTION and
TREE ROOT PRUNING.
The Contractor shall coordinate with the village forester or arborist prior to the start of construction to do a walk through and determine which trees or shrubs are to be protected, method of protection, and determine type of work to minimize damage to the tree.
All work, materials and equipment shall conform to Section 201 and 1081 of the Standard Specifications except as modified herein.
A. Earth Saw Cut of Tree Roots (Root Pruning):
1. Whenever proposed excavation falls within a drip-line of a tree, the Contractor shall:
Gilbert Avenue FAU 2697
25-00105-00-RS
- 10 -
a. Root prune 6-inches behind and parallel to the proposed edge of trench a neat, clean vertical cut to a minimum depth directed by the Engineer through all affected tree roots.
b. Root prune to a maximum width of 4-inches using a reciprocating saw blade for cutting tree roots or similar cutting machine. Trenching machines will not be permitted.
c. Exercise care not to cut any existing utilities.
d. If during construction it becomes necessary to expose tree roots which have not been precut, the Engineer shall be notified and the Contractor shall provide a clean, vertical cut at the proper root location, nearer the tree trunk, as necessary, by means of hand-digging and trimming with chain saw or hand saw. Ripping, shredding, shearing, chopping, or tearing will not be permitted.
e. Top Pruning: When thirty percent (30%) or more of the root zone is pruned, an equivalent amount of the top vegetative growth or the plant material shall be pruned off within one (1) week following root pruning.
2. Whenever curb and gutter is removed for replacement, or excavation for removal of or construction of a structure is within the drip line/root zone of a tree, the Contractor shall:
a. Root prune 6-inches behind the curbing so as to neatly cut the tree roots.
b. Depth of cut shall be 12 inches for curb removal and replacement and 24 inches for structural work. Any roots encountered at a greater depth shall be neatly saw cut at no additional cost.
c. Locations where earth saw cutting of tree roots is required will be marked in the field by the Engineer.
3. All root pruning work is to be performed through the services of a licensed arborist to be approved by the Engineer.
Root pruning will be paid for at the contract unit price each for TREE ROOT PRUNING, which price shall be payment for all labor, materials, and equipment.
B. Tree Trunk Protection:
1. The Contractor shall erect trunk protection around all trees within the
Gilbert Avenue FAU 2697
25-00105-00-RS
- 11 -construction area to prevent damage to the trunk of the tree when temporary fence is not an option before any work begins or any material is delivered to the jobsite.
No work is to be performed (other than root pruning), materials stored, or vehicles driven or parked within the “tree protection zone”.
2. The 2 inch x 8 inch x 8 foot boards shall be banded continuously around the trunk of each tree to prevent scarring of the trees shown on the plans or designated by the Engineer.
3. Multi-stem trees, saplings, and shrubs to be protected within the area of construction, temporary fence may be used for trunk protection.
Tree trunk protection will be paid for at the contract unit price per each for TREE TRUNK PROTECTION ), which price shall include materials, installation, and removal.
C. Removal of Driveway Pavement and Sidewalk:
1. In order to minimize the potential damage to the tree root system(s), the Contractor will not be allowed to operate any construction equipment or machinery within the “tree protection zone” located between the curb or edge of pavement and the right-of-way property line.
2. Sidewalk to be removed in the areas adjacent to the “tree protection zones” shall be removed with equipment operated from the street pavement. Removal shall be done by excavation equipment, or by hand, or a combination of these methods. The method of removal shall be approved by the Engineer prior to commencing any work.
3. Any pavement or pavement related work that is removed shall be immediately disposed of from the area and shall not be stockpiled or stored within the parkway area under any circumstances.
D. Backfilling:
1. Prior to placing the topsoil and/or sod, in areas outside the protection zone, the existing ground shall be disked to a depth no greater than one (1”), unless otherwise directed by the Engineer. No grading will be allowed within the drip-line of any tree unless directed by the Engineer.
E. Damages:
1. In the event that a tree not scheduled for removal is injured such that potential
Gilbert Avenue FAU 2697
25-00105-00-RS
- 12 -irreparable damage may ensure, as determined by the Roadside Development Unit, the Contractor shall be required to remove the damage tree and replace it on a three to one (3:1) basis, at his own expense. The Roadside Development Unit will select replacement trees from the pay items already established in the contract.
2. The Contractor shall place extreme importance upon the protection and care of trees and shrubs which are to remain during all times of this improvement. It is of paramount importance that the trees and shrubs which are to remain are adequately protected by the Contractor and made safe from harm and potential damage from the operations and construction of this improvement. If the Contractor is found to be in violation of storage or operations within the “tree protection zone” or construction activities not approved by the Engineer, a penalty shall be levied against the Contractor with the monies being deducted from the contract. The amount of the penalty shall be two hundred fifty dollars ($250.00) per occurrence per day.
SUPPLEMENTAL WATERING
This work will include watering sod at the rates specified and as directed by the Engineer.
Schedule: Watering will only begin after the successful completion of all period of establishment requirements. Water sod a minimum of twice a week. The Engineer may direct the Contractor to adjust the watering rate and frequency depending upon weather conditions.
Watering must be completed in a timely manner. When the Engineer directs the Contractor to do supplemental watering, the Contractor must begin the watering operation within 24 hours of notice. The Contractor shall give an approximate time window of when they will begin at the work location to the Engineer. The Engineer shall be present during the watering operation. A minimum of 10 units of water per day must be applied until the work is complete.
Should the Contractor fail to complete the work on a timely basis or within such extended times as may have been allowed by the Department, the Contractor shall be liable to the Department liquidated damages as outlined in the “Failure to Complete Plant Care and Establishment Work on Time” special provision.
In fixing the damages as set out herein, the desire is to establish a mode of calculation for the work since the Department’s actual loss, in the event of delay, cannot be predetermined, would be difficult of ascertainment, and a matter of argument and unprofitable litigation. This said mode is an equitable rule for measurement of the Department’s actual loss and fairly takes into account the loss of the trees if the watering is delayed. The Department shall not be required to
Gilbert Avenue FAU 2697
25-00105-00-RS
- 13 -provide any actual loss in order to recover these liquidated damages provided herein, as said damages are very difficult to ascertain. Furthermore, no provision of this clause shall be construed as a penalty, as such is not the intention of the parties.
A calendar day is every day shown on the calendar and starts at 12:00 midnight and ends at the following 12:00 midnight, twenty-four hours later.
Source of Water: The Contractor shall notify the Engineer of the source of water used and provide written certification that the water does not contain chemicals harmful to plant growth.
Rate of Application: The normal rates of application for watering are as follows. The Engineer will adjust these rates as needed depending upon weather conditions.
27 gallons per square yard for Sodded Areas
Method of Application: Watering of plants in beds shall be applied in such a manner that all plant holes are uniformly saturated without allowing the water flow beyond the periphery of the bed. Water shall slowly infiltrate into soil and completely soak the root zone. The Contractor must supply metering equipment as needed to assure the specified application rate of water.
Method of Measurement: Supplemental watering will be measured in units of 1000 gallons of water applied as directed.
Basis of Payment: This work will be paid for at the contract unit price per unit of SUPPLEMENTAL WATERING, measured as specified. Payment will include the cost of all water, equipment and labor needed to complete the work specified herein and to the satisfaction of the Engineer.
FAILURE TO COMPLETE PLANT CARE AND ESTABLISHMENT WORK ON TIME
Should the Contractor fail to complete the plant care and/or supplemental watering work as per the standard specifications or within 24 hours notification from the Engineer, or within such extended times as may have been allowed by the Department, the Contractor shall be liable to the Department in the amount of:
• $20.00 per sq yd sod/per day not as penalty but as liquidated damages, for each calendar day or a portion thereof of overrun in the contract time or such extended time as may have been allowed.
In fixing the damages as set out herein, the desire is to establish a mode of calculation for the
Gilbert Avenue FAU 2697
25-00105-00-RS
- 14 -work since the Department’s actual loss, in the event of delay, cannot be predetermined, would be difficult of ascertainment, and a matter of argument and unprofitable litigation. This said mode is an equitable rule for measurement of the Department’s actual loss and fairly takes into account the loss of the sod if the watering or plant care is delayed. The Department shall not be required to provide any actual loss in order to recover these liquidated damages provided herein, as said damages are very difficult to ascertain. Furthermore, no provision of this clause shall be construed as a penalty, as such is not the intention of the parties.
A calendar day is every day shown on the calendar and starts at 12:00 midnight and ends at the following 12:00 midnight, twenty-four hours later.
AGGREGATE BASE COURSE, TYPE B
This work shall be done in accordance with Section 351 of the Standard Specifications except as modified herein.
351.02 Materials. Revise this article to read:
“351.02 Materials. Materials shall meet the requirements of Section 1004.04, except that the aggregate shall be crushed gravel or crushed stone.”
351.04 Subgrade. Add the following to the end of this article:
“Prior to placement of the aggregate base course, the subgrade shall be inspected and approved by the Engineer.”
351.12 Basis of Payment. Revise the first paragraph of this section to read:
“This work will be paid for at the contract unit price per square yard for AGGREGATE BASE COURSE, TYPE B, of the thickness specified.”
DETECTABLE WARNINGS
This work shall be done in accordance with Section 424.09 of the Standard Specifications except as modified herein.
Detectable warnings shall be constructed with the installation of an ADA-compliant cast-in-place composite. Detectable warning panels shall meet PROWAG size requirements. The domes located on the panel shall parallel the pavement crosswalk with the closest edge located at the back of curb. The contrasting panel shall be red in color and shall be approved by the Village prior to installation. Installation shall occur in accordance with the manufacturer’s recommendations.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 15 -
Basis of Payment. This work will be paid for at the contract unit price per square foot for
DETECTABLE WARNINGS.
CLASS B PATCHES
This work shall be done in accordance with Section 442 of the Standard Specifications
442.01 Description. Delete all references to a specified “type” in this Article.
442.05 Pavement Removal. In the last sentence in the first paragraph of subsection (b) reference to “Only full lane width patches will be permitted” shall be replaced by “Only patches greater than four feet in width will be permitted”.
442.10 Method of Measurement. Delete the fifth and eighth paragraphs of this Article.
442.11 Basis of Payment. Delete the third, seventh, eighth, and tenth paragraphs of this Article and replace the second paragraph with the following:
“This work will be paid for at the contract unit price per square yard for CLASS B PATCHES, of the thickness specified. Cleaning and joint sealing is incidental to the Class B patch”
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES
Description. This work shall consist of the removal and disposal of regulated substances according to Section 669 of the Standard Specifications as revised below.
Soil Disposal Analysis. When the waste material requires sampling for landfill disposal acceptance, the Contractor shall secure a written list of the specific analytical parameters and analytical methods required by the landfill. The Contractor shall collect and analyze the required number of samples for the parameters required by the landfill using the appropriate analytical procedures. A copy of the required parameters and analytical methods (from landfill email or on landfill letterhead) shall be provided as Attachment 4A of the BDE 2733 (Regulated Substances
Final Construction Report). The price shall include all sampling materials and effort necessary for collection and management of the samples, including transportation of samples from the job site to the laboratory. The Contractor shall be responsible for determining the specific disposal facilities to be utilized; and collect and analyze any samples required for disposal facility acceptance using a NELAP certified analytical laboratory registered with the State of Illinois.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 16 -
Contract Specific Sites. The excavated soil and groundwater within the areas listed below shall be managed as either “uncontaminated soil”, hazardous waste, special waste or non-special waste. For stationing, the lateral distance is measured from centerline and the farthest distance is the offset distance or construction limit, whichever is less.
Gilbert Avenue
• Station 10+45 to Station 13+00, Station 35+00 to Station 37+00, and Station 63+00 to
Station 64+06 (CL Gilbert Avenue. All excavation planned within the proposed ROW. The
Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Contaminants of concern: VOCs, SVOCs and Metals.
• Station 13+00 to Station 35+00 and Station 37+00 to Station 63+00, and Station 63+00 to Station 64+06 (CL Gilbert Avenue. All excavation planned within the proposed ROW. The
Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1). Contaminants of concern: VOCs, SVOCs and Metals.
This work shall include monitoring and potential sampling, analytical testing, and management of a material contaminated by regulated substances. The Contractor or firm shall continuously monitor all soil excavation for worker protection and soil contamination. Soil samples or analysis without the approval of the Engineer will be at no additional cost.
DRAINAGE AND UTILITY STRUCTURES TO BE ADJUSTED
This work shall be done in accordance with Section 602 of the Standard Specifications
602.01 Description. Revise this Article to read:
“602.01 Description. This work shall consist of adjusting existing catch basins, manholes, inlets, or valve vaults.”
602.02 Materials. Revise Note 2 to read:
Note 2. Riser rings fabricated from recycled rubber may be used to adjust the frames and grates of drainage and utility structures up to a maximum of 50 mm (2 in.). They shall be installed and sealed underneath the frames according to the manufacturer’s specifications.
Recycled rubber products shall consist of no less than 80 percent by weight recycled rubber. The riser shall meet or exceed the following when maintained at 23 ± 2°C (73 ± 3°F) for at least 24 hours prior to and during testing.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 17 -
Physical Property Test Standard Value
Density ASTM C 642-90
1.10 ± 0.034 g/cu cm (68.63 ± 2.11 lb/cu ft)
Durometer Hardness ASTM D 2240-97 Shore A 72 ± 61
Compression Deformation under 1000 kPa (145 psi)
ASTM D 575 –Test Method B Test of Specified Force
9 ± 4 %
Compression Set ASTM D 395 – Illinois Modified Test Method B Compression Set under Constant Deflection in Air
5 ± 3 %2
Weathering (70 hrs at 70 °C (158 °F)) Hardness retained
ASTM D 573 98 %, minimum
Freeze/thaw when exposed to deicing chemicals
ASTM C 672-91
3 % loss, maximum
1 Average of three tests over a 28 mm (1.12”) diameter sample.
2 Samples compressed to 75 percent of initial height.
Recycled rubber adjusting rings shall have no void areas, cracks, or tears, and have no effects due to exposure to ultraviolet light. The actual diameter or length shall not vary more than 3 mm (0.125”) from the specified diameter or length. Variations in height are limited to ± 1.6 mm (0.063”) for parts up to 50 mm (2”)."
The top ring of all adjusted frames shall be HDPE.
602.16 Basis of Payment. Revise the second paragraph of this Article to read:
“This work shall be paid for at the contract unit price each for DRAINAGE & UTILITY STRUCTURES TO BE ADJUSTED, which price shall include the adjustment of existing catch basins, manholes, inlets or valve vaults, resetting the frame and grate or lid, removing and resetting the existing external chimney seal, and excavation and backfilling.”
Gilbert Avenue FAU 2697
25-00105-00-RS
- 18 -
DRAINAGE AND UTILITY STRUCTURES TO BE RECONSTRUCTED
This work shall be done in accordance with Section 602 of the Standard Specifications
602.01 Description. Revise this Article to read:
“602.01 Description. This work shall consist of reconstructing existing catch basins, manholes, inlets, or valve vaults.”
602.02 Materials. Revise Note 2 to read:
Note 2. Riser rings fabricated from recycled rubber may be used to adjust the frames and grates of drainage and utility structures up to a maximum of 50 mm (2 in.). They shall be installed and sealed underneath the frames according to the manufacturer’s specifications.
Recycled rubber products shall consist of no less than 80 percent by weight recycled rubber. The riser shall meet or exceed the following when maintained at 23 ± 2°C (73 ± 3°F) for at least 24 hours prior to and during testing.
Physical Property Test Standard Value
Density ASTM C 642-90
1.10 ± 0.034 g/cu cm (68.63 ± 2.11 lb/cu ft) Durometer Hardness ASTM D 2240-97 Shore A 72 ± 61 Compression Deformation under 1000 kPa (145 psi)
ASTM D 575 –Test Method B Test of Specified Force
9 ± 4%
Compression Set
ASTM D 395 – Illinois Modified Test Method B Compression Set under Constant Deflection in Air
5 ± 3%2
Weathering (70 hrs at 70 °C (158 °F)) Hardness retained
ASTM D 573 98%, minimum
Freeze/thaw when exposed to deicing chemicals
ASTM C 672-91 3% loss, maximum
1 Average of three tests over a 28 mm (1.12”) diameter sample.
2 Samples compressed to 75 percent of initial height.
Gilbert Avenue FAU 2697
25-00105-00-RS
- 19 -
Recycled rubber adjusting rings shall have no void areas, cracks, or tears, and have no effects due to exposure to ultraviolet light. The actual diameter or length shall not vary more than 3 mm (0.125”) from the specified diameter or length. Variations in height are limited to ± 1.6 mm (0.063”) for parts up to 50 mm (2”)."
602.16 Basis of Payment. Revise the second paragraph of this Article to read:
“This work shall be paid for at the contract unit price each for DRAINAGE & UTILITY STRUCTURES TO BE RECONSTRUCTED, which price shall include the reconstruction of existing catch basins, manholes, inlets or valve vaults, resetting the frame and grate or lid, removing and resetting the existing external chimney seal, and excavation and backfilling.”
SANITARY MANHOLE, 4’ DIAMETER
A four-foot (4’) diameter manhole shall be constructed at the locations shown on the Plans. The Contractor will be responsible for ensuring that the pipe openings are formed in the correct locations so that additional cutting of the precast structure is not necessary.
All trench backfill used to fill around the new structure will be included in the cost of this item. Any pipe, up to four feet (4’) in length per each pipe, used to connect existing pipes to the structure to be installed shall be included in the cost of the structure to be installed.
A new Type 1 Frame, Closed lid shall be furnished and installed. A new external chimney seal which fully encompasses the rings and castings shall be installed after the frame has been adjusted to the final elevation. All closed lids on manholes will be self-sealing with recessed pick holes and shall have the word “SANITARY” cast in raised letters upon the lid.
Basis Of Payment: This work shall be paid for at the contract unit price per Each of SANITARY
MANHOLE, 4’-DIAMETER.
HOT-MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT
This item shall consist of the removal and replacement of the existing HMA driveway surface. Replacement shall be constructed to match the existing pavement removed for thickness, however the minimum thickness shall not be less than 3 inches of HMA Surface Course, Mix “D” N50. Prior to replacement with the surface course, the exposed base course shall be shaped, compacted, primed, and tacked including the exposed edge of the HMA surface remaining, to the satisfaction of the Engineer.
Contractor shall limit parkway disturbance as much as possible, parkway restoration with topsoil and seed for areas of low disturbance shall be an acceptable restoration method and is
Gilbert Avenue FAU 2697
25-00105-00-RS
- 20 -included in driveway removal & replacement work. A pay item for SODDING has been included and shall be used as determined by the Engineer in the field.
Removal of the driveway surface shall be in accordance with Section 440 of the Standard
Specifications which includes sawcutting any tree roots as applicable. Replacement shall be done in accordance with Articles 406.02, 406.03, 406.05, 406.06, 406.07, and 406.12 of the Standard Specifications, except as modified herein.
Basis of Payment. This work will be paid for at the contract unit price per square yard for HOT-
MIX ASPHALT DRIVEWAY REMOVAL AND REPLACEMENT.
SOLAR-POWERED FLASHING BEACON ASSEMBLY (COMPLETE)
This work shall include providing and installing a Circular Flashing Beacon, Post Mounted, Solar Powered Installation at locations shown on the plans and as directed by the Engineer. This work shall include providing and installing the Circular Flashing Beacon, Post Mounted, Solar Powered Installation as described herein and as shown on the plans.