About this opportunity
The Village of Melrose Park is requesting bids for HMA resurfacing, utility installation, and pavement reconstruction on George Street from North Avenue (IL 64) to the north village limit (CN Railroad), with bids due September 18, 2026 at 12:00 p.m. via the iCX electronic bidding system. The project is subject to federal-aid requirements, including DBE participation provisions and prevailing wage compliance.
The scope encompasses hot-mix asphalt surface removal and replacement; curb, gutter, driveway apron, and sidewalk removal and replacement; storm sewer and drainage structure installation; installation of a 12-inch ductile iron water main; HMA binder and surface courses; pavement marking; and parkway restoration. The project covers 3,305 feet (0.626 miles) on George Street in Cook County, Illinois within the Village of Melrose Park. Work is staged into four construction phases to maintain traffic flow and business access. Construction hours are limited to 7 a.m.–7 p.m. Monday through Friday, 8 a.m.–5 p.m. Saturday, and 10 a.m.–5 p.m. Sunday and holidays per Village Ordinance No. 959.
Utility adjustments by NICOR, ComEd, and Crosstown Fiber are required during the pre-stage phase and will take approximately 50 days total. The contractor assumes responsibility for normal roadway maintenance within project limits, must maintain pedestrian and emergency vehicle access throughout construction, and is responsible for traffic control and protection. All excavations must be backfilled or plated over daily. Anticipated project completion is October 31, 2027. The contract will be awarded to the lowest responsive and responsible bidder. The contractor must submit payroll records, maintain quality assurance protocols for concrete and hot-mix asphalt, and coordinate with utilities and the Village throughout construction.
Opportunity text
This work consists of the hot mix asphalt surface removal; removal and replacement of curb and gutter, driveway aprons, and sidewalk; installation of storm sewer and drainage structures; installation of a 12 ductile iron water main, hot-mix asphalt (HMA) binder & surface, pavement marking, restoring disturbed parkways with topsoil and sod and all other appurtenant work necessary to complete the project as shown on the plans and described herein. Location: The project is located on George Street beginning at North Avenue (IL 64) (Station 1+40) and ending at the north Village limit (CN Railroad) (Station 34+45) for a total net length of 3,305 feet (0.626 miles) within the Village of Melrose Park in Cook County, Illinois.