HHSP Greenway Trail
Closed State & local contract opportunity Posted
- Solicitation number
- Event 32701-13393
- State
- Tennessee
- Responses due
Opportunity facts
- Jurisdiction
Updated .
About this opportunity
The Tennessee Department of Environment & Conservation is seeking bids for the construction of a 1.5-mile long, 60-inch wide, flexible porous pavement greenway trail at Henry Horton State Park. The project involves installing the ADA-compliant trail using a mechanized paver and Tennessee-allocated granulated tire rubber, with specific performance and material requirements. The contractor is responsible for providing all materials, equipment, and labor, as well as ensuring compliance with federal regulations, as the project is partially funded by the Federal Recreation Trails Program. The contract includes a 3-year warranty covering all parts of the trail, including materials, workmanship, and safety. Responses are due between July 23, 2024, and July 25, 2024, and the contract term is 6 months, with an optional 180-day extension.
The ITB does not mention any set-aside designations or restrictions on the types of organizations that can respond. There are also no listed incumbent vendors or current contractors. The estimated total cost for the project is to exceed $50,000, but the exact award value or budget range is not specified. The contract will be awarded to the respondent with the lowest cost bid that meets the requirements.
Opportunity text
The Tennessee Department of Environment & Conservation is seeking bids for the construction of a porous pavement greenway trail at Henry Horton State Park. The project involves installing a flexible porous pavement trail that is at least 1.5 miles (7,920 feet) long and 60 inches wide, with a minimum thickness of 1.5 inches. The trail must be ADA compliant and meet specific requirements for porosity, durability, and environmental resistance. The contractor is responsible for providing materials, equipment, and labor for the installation, as well as ensuring compliance with federal regulations as the project is partially funded by the Federal Recreation Trails Program. The contract includes a 3-year warranty on all parts of the trail, including materials, workmanship, and safety.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity