Harbor Beach Renovation - Bid 2
Open State & local contract opportunity Posted
- Solicitation number
- RFP HBCS 270000000268 1
- State
- Michigan
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
- 72111106 Apartment remodeling service
- 72111109 Dormitory remodeling service
- 72153600 Interior finishing and furnishing and remodeling services
- 72111108 Condominium remodeling service
- 72141402 Detention facility remodeling and repair
- 72111001 Single family home remodeling addition and repair service
- 72111002 Single family home general remodeling service
- 72111107 Cooperative apartment remodeling service
- 72111110 Hotel or motel remodeling service
- 72121103 Commercial and office building renovation and repair service
Show all 11
Updated .
About this opportunity
Harbor Beach Community Schools in Michigan is soliciting bids for Bid 2 of its Harbor Beach Renovation, Building Project #2 at 402 S. 5th Street, with bids due November 30, 2026 at 3:00 p.m. Bids are public, opened and read at 3:15 p.m. at the Office of the Superintendent. The solicitation covers three trade categories: Bid Category 10 (Resilient Flooring & Carpet), Bid Category 16 (HVAC), and Bid Category 18 (Plumbing). Contractors must submit familial disclosure statements in compliance with Michigan law (MCL 380.1267).
Scope includes demolition, flooring system installation, complete HVAC systems with all components and controls, and complete plumbing systems including fixtures and underground utilities. Contractors must comply with OSHA, MIOSHA, and local safety requirements. Each trade contractor secures and pays permits specific to its work, and the Owner provides the general building permit through the construction manager.
Harbor Beach Community Schools will contract directly with each trade contractor under AIA Document A132-2009 (Construction Manager as Adviser Edition). R.C. Hendrick & Son, Inc. is the construction manager, and IDI Architecture and Engineering Consulting is the architect. No formal pre-bid conference is scheduled, but site visits are available by request via email to micah@rchendrick.com.
Bid bonds of 5 percent of the base bid are required for bids exceeding $50,000. Performance and payment bonds covering the contract amount must be furnished before contract execution, with bond costs included in the base bid. Bidders must include sales tax in base bids and provide time-and-material rates for potential extra work. Bids must be submitted in triplicate and remain irrevocable for 60 days after the bid date.
Payment is monthly at 90 percent of completed work value, with 5 percent retained for closeout materials and 5 percent retained for punch list completion. A 12-month warranty from substantial completion is required unless the contract documents specify a longer warranty. Insurance requirements include statutory Workers' Compensation, Commercial General Liability at $1,000,000 per occurrence, Automobile Liability at $1,000,000, and Umbrella/Excess Liability of $2,000,000. The Owner, Architect, and Construction Manager must be named as additional insureds.
The specifications (14MB) and architectural drawings (30MB) were posted November 10, 2026.
Files
| File | Type | Posted |
|---|---|---|
| Harbor Beach Community Schools BP2 Specifications.pdf | ||
| Harbor Beach Community Schools BP2 Drawings.pdf |