Summary
This document is a specifications and bidding package for Harbor Beach Community Schools' Building Project #2, an office addition and renovations project located at 402 S. 5th Street in Harbor Beach, Michigan. The project involves three bid categories: Bid Category 10 (Resilient Flooring & Carpet), Bid Category 16 (HVAC), and Bid Category 18 (Plumbing). The scope of work includes demolition, installation of flooring systems, complete HVAC systems with all components and controls, and complete plumbing systems including fixtures and underground utilities. Bids are due on November 30, 2026, at 3:00 p.m. at the Office of the Superintendent, with public opening and reading at 3:15 p.m. No formal pre-bid conference is scheduled; however, site visits are available by request via email to micah@rchendrick.com. Bids must be submitted in triplicate and may not be withdrawn for 60 days following the bid date. The construction manager is R.C. Hendrick & Son, Inc., and the architect is IDI Architecture and Engineering Consulting. The contract will be directly between the Owner (Harbor Beach Community Schools) and each trade contractor under AIA Document A132-2009 (Standard Form of Agreement, Construction Manager as Adviser Edition).
Bidders must include sales tax in base bids and provide time and material rates for potential extra work. Bid bonds of 5 percent of the base bid sum are required for bids exceeding $50,000. Performance and payment bonds covering the contract amount must be furnished prior to contract execution, with bond costs included in the base bid. A 12-month warranty period from substantial completion is required unless longer warranties are specified in the contract documents. Insurance requirements include Workers' Compensation at statutory limits, Commercial General Liability with $1,000,000 per occurrence limits, Automobile Liability with $1,000,000 limits, and Umbrella/Excess Liability of $2,000,000. The Owner, Architect, and Construction Manager must be listed as additional insureds. Contractors are required to submit familial disclosure statements in compliance with Michigan law (MCL 380.1267) and must comply with all OSHA, MIOSHA, and local safety requirements. All permits and fees specific to each trade contractor's work must be secured and paid by the contractor, with the general building permit provided by the Owner through the Construction Manager. Payment will be made monthly at 90 percent of completed work value, with five percent retained for closeout materials and five percent retained for punch list completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Harbor Beach Community Schools BP2 Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HARBOR BEACH COMMUNITY SCHOOLS
BP #2: OFFICE ADDITION &
RENOVATIONS – FLOORING, HVAC &
PLUMBING
BIDS DUE
NOVEMBER 30, 2026 @ 3:00 P.M.
R.C. HENDRICK & SON, INC.
CONSTRUCTION MANAGER
2885 S. GRAHAM RD.
SAGINAW, MI 48609
P: 989.781.8116 F: 989.781.9512
IDI ARCHITECTURE AND ENGINEERING
CONSULTING
8571 W. GRAND RIVER AVE., STE. 600
BRIGHTON, MI 48816
P: 810.229.2701
Harbor Beach Community Schools R.C. Hendrick Project No. 55426 BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 0100 - Project Directory
SECTION 00 0100
PROJECT DIRECTORY
PROJECT: Harbor Beach Community Schools
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing
PROJECT LOCATION: Harbor Beach Community Schools 402 S. 5t Street
Harbor Beach, MI 48441
CONSTRUCTION MANAGER: R.C. Hendrick & Son, Inc.
2885 S. Graham Road Saginaw, MI 48609
989.781.8116 (Phone)
ARCHITECT: IDI Architecture and Engineering Consulting 8571 W. Grand River Ave., Ste. 600 Brighton, MI 48816
810.229.2701 (Phone)
END OF SECTION 00 0100
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 0110 - Table of Contents
SECTION 00 0110
TABLE OF CONTENTS
DIVISION 0 BIDDING AND CONTRACT REQUIREMENTS
00 0100 Project Directory 00 0110 Table of Contents 00 1000 Advertisement for Bid 00 2000 Instructions to Bidders 00 2200 Bid Category General Notes 00 2400 Bid Category Descriptions 00 3100 Information Available to Bidders 00 3113 Milestone Schedule 00 3146 Permits 00 4000 Bid Form 00 4100 Familial Disclosure Statement 00 5000 Contract / Agreement Form 00 6100 Bonds 00 7200 General Conditions of the Contract 00 7300 Supplementary Conditions 00 7316 Insurance Requirements 00 7317 Sample Insurance 00 8100 Safety Requirements
DIVISION 1 GENERAL REQUIREMENTS
01 1100 Summary 01 2100 Allowances 01 2200 Unit Prices 01 2300 Alternates 01 2600 Contract Modification Procedures 01 2900 Payment Application Procedures 01 2976 Sworn Statements and Waivers 01 3100 Project Management and Coordination 01 3119 Project Meetings 01 3300 Submittal Procedures 01 4000 Quality Requirements 01 5000 Temporary Facilities and Controls 01 6000 Product Requirements 01 7400 Cleaning and Debris Control 01 7700 Project Closeout Procedures 01 7836 Warranties
***SEE IDI ARCHITECTS SPECIFICATION MANUAL FOR TECHNICAL SPECIFICATION TABLE OF
CONTENTS***
END OF SECTION 00 0110
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 1000 - Advertisement for Bid
SECTION 00 1000
ADVERTISEMENT FOR BID
Notice is hereby given that Harbor Beach Community Schools is receiving bids from trade contractors for the following project:
HARBOR BEACH COMMUNITY SCHOOLS – BP #2: OFFICE ADDITION AND RENOVATIONS FLOORING, HVAC AND PLUMBING
Complete proposals will be received for the following work categories in accordance with drawings and specifications as prepared by the Architect, Engineers and Construction Manager.
BID CATEGORY 10: RESILIENT FLOORING & CARPET
BID CATEGORY 16: HVAC
BID CATEGORY 18: PLUMBING
Plans and specifications can be found in the plan room at https://rchendrick.com/.
Bids will be received at the Office of the Superintendent until 3:00 p.m. on Monday, November 30th, 2026 and then at 3:15 they will be publicly opened and read aloud. Late bids will not be accepted. Bids may not be withdrawn for a period of sixty (60) days after the bid date.
Proposals should be submitted in TRIPLICATE and be addressed to:
Harbor Beach Community Schools Office of the Superintendent 402 S. 5th Street
R.C. Hendrick & Son, Inc. is the Construction Manager on this Project. Please do not phone, fax, or email bids to the Construction Manager.
The Owner reserves the right to reject any, part of any or all bids and to waive all informalities in the bidding procedures. The Owner reserves the right to reject any bid when Bidder fails to submit data required by the Bidding Documents, or if the bid is submitted incomplete or irregular. No telephonic, email, fax bids or modification to a submitted bid will be received or considered by the Owner.
PRE-BID CONFERENCE
There will not be a formal pre-bid conference. Site visits are allowed by request via email to micah@rchendrick.com
SCHEDULE
Coordinate with Owner once materials are delivered.
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 1000 - Advertisement for Bid
FAMILIAL DISCLOSURE
Bidders must provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid. The bid shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner or the employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive office of the public school academy. The District shall not accept a bid that does not include this sworn and notarized disclosure statement.
QUESTIONS / RFIs All questions regarding the plans and specifications are to be emailed to Micah Baumgartner (micah@rchendrick.com).
ADDENDA
Addenda will be posted to R.C. Hendrick’s Online Plan Room. Addendums will be posted no later than 12:00 Noon on the day before the bid is due. R.C. Hendrick will send out a notice that an addendum is available to all known planholders. It is the responsibility of every bidder to check the project site for addendums and note them on the bid form.
END OF SECTION 00 1000
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 2000 - Instructions to Bidders
SECTION 00 2000
INSTRUCTIONS TO BIDDERS
1. DEFINITIONS
Definitions set forth in the General Conditions of the Contract Construction, AIA Document A232
- Current Edition, and in other contract documents are applicable to the Bidding Documents.
Bidding Documents: Bidding Documents include the Drawings, Specifications, Addenda prepared by the Architects, Engineers, Consultants and Construction Manager and anything referenced within those documents.
Addenda: Addenda are written or graphic instruments issued prior to the execution of the Contract which modify or interpret the Bidding Documents by additions, deletions, clarifications or corrections.
Bid: A bid is a complete and properly signed proposal to do the work for a stipulated sum, submitted in accordance with the Bidding Documents.
Base Bid: The sum stated in the Bid Form for which the Bidder offers to perform the work described in the Bidding Documents as the Base Bid.
Alternate: An alternate is an amount stated in the Bid to be added or deducted from the Base Bid if the corresponding change in the work, as described in the Bidding Documents, is accepted.
Unit Price: An amount stated as a price per unit of measurements for materials or services described in the Bidding Documents.
Bidder: A person or entity who submits a bid.
Furnish: This term is used to mean supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation and similar operations.
2. CONSTRUCTION MANAGER
R.C. Hendrick & Son, Inc. has been selected by the Owner to organize and/or direct the complete construction of the project and, as such, will act as a representative of the Owner in those matters so designated. Depending on the contractual arrangement with the Owner, R.C.
Hendrick may not have on-site supervision and may not be available for questions during the construction process.
3. BIDDING PROCEDURE
R.C. Hendrick’s online Plan Room is the official location for all bidding documents. It is each bidder’s responsibility to ensure that they have viewed all addenda posted to the Plan Room.
Addendums will be posted no later than 12:00 Noon on the day before the bid is due.
Bidders are to bid COMPLETE Bid Categories only. Bids for partial categories or noting any exceptions may cause your bid to be rejected. If you feel that something is part of your category that should not be included, please submit a Pre-Bid RFI.
Bidders shall include all work noted in the Bid Category Description as well as General Bid Category Notes which apply to ALL Categories.
Each Bidder by submitting this Bid to the Owner represents that they have read and understand the Bidding Documents. Each bidder also represents that they have made a site inspection, familiarized themselves with the local conditions under which the work is to be performed, and have correlated observations with requirements of the Bidding Documents.
Bids shall be submitted in TRIPLICATE. (1) One Original and (2) Two Copies of the Bid Form are required. Fill in ALL blanks on the bid form. Information must be typed or in ink. Express sums in both words and figures. The amount in words will govern in case of a discrepancy. The signer of the bid must initial all interlineations, alterations and erasures.
Enclose the bid and other documents required in a sealed envelope. If the Bid is sent by mail, enclose the sealed envelope in a separate mailing envelope with “Sealed Bid Enclosed” printed on the envelope.
Address the envelope to the party receiving the bids and state project name, the bidder’s name and address, and the designated Bid Category # for which the bid is submitted on the outside of the envelope. If you are bidding on more than one Bid Category, each bid must be in its own clearly marked envelope.
Bids will be PUBLICLY opened after the deadline to submit bids. Only properly identified bids received on time will be opened.
4. COMBINED BIDS
If you intend on offering a discount as part of a Combined Bid, you MUST submit a base bid in each category and each category MUST be in a separate envelope. The Combined Bid must be entered on at least one Bid Form submitted by the bidder.
5. ALTERNATES
Alternates are listed on the Bid Form and are described in further detail in the Architectural Specification. Each bidder should review all Alternates and determine if what is described in the Specification and shown on the Drawings causes and addition or deduction to their Base Bid.
Bidders shall indicate on the Bid Form if the Alternate is an ADD or DEDUCT to the Base Bid and indicate the costs associated. If the Alternate does not affect your scope of work, enter “No
Change” in the space provided. The Owner will have the right to accept Alternates in any order or combination and to determine the low bidder on the basis of the sum of the base bid and the accepted Alternate.
6. VOLUNTARY ALTERNATES
The bidder may submit voluntary alternates with their bid. Voluntary Alternates are changes in scope or a specification. Voluntary alternates shall be listed in the appropriate space on the Bid Form. If additional pages are necessary, attach them to the end of the Bid Form on your company letterhead. Voluntary alternates will be reviewed after the award of a contract and the Owner reserves the right to accept or reject any Voluntary Alternate.
7. QUESTIONS AND DISCREPENCIES
Notify the Construction Manager at least five (5) days prior to bid of ambiguities, inconsistencies, or error discovered upon examination of the Bidding Documents, site or local conditions. Submit requests for clarification or interpretation of the Bidding Documents in writing. Interpretation, correction, or change of the Bidding Documents will be made by Addendum, all other forms will be non-binding. Questions should be EMAILED to the Project Manager listed in the R.C. Hendrick Online Plan Room.
8. SUBSTITUTIONS
The materials, products, and equipment described in the Bidding Documents establish a standard of required function, dimension, appearance and quality. Pre-Bid substitution requests must be submitted in writing and received by the CM at least ten (10) days prior to bid date.
The burden of proof of the merit of the proposed substitute is upon the proposer. The Owner’s decision of acceptance or rejection of a proposed substitution will be final.
Requests for substitutions shall include:
1. The name of the material or equipment for which it is to be substituted and a complete description of the proposed substitute including drawings, cut-sheets, performance, test data and other information necessary for an evaluation.
2. A statement setting forth any changes in other materials, equipment, other work that incorporation of the substitute would require, shall be included.
9. MODIFICATION OR WITHDRAWAL OF A BID
A bid may not be modified or withdrawn following the time and date designated for the receipt of bids. Prior to the time and date designated for receipt of bids, a submitted bid may be withdrawn by notice to the party receiving bids at the place designated for receipt of bids.
Notice shall be in writing over the signature of the bidder or in person. Withdrawal notice shall be submitted by mail, telegram, or fax postmarked on or before the date and time for receipt of bids. Withdrawn bids may be resubmitted up to the time designated for the receipt of bids.
10. OWNER’S RESERVATION OF RIGHTS
The Owner reserves the right to reject any, part of any or all bids and to waive all informalities in the bidding procedures. The Owner reserves the right to reject any bid when Bidder fails to submit data required by the Bidding Documents, or if the bid is submitted incomplete or irregular. No telephonic, telegraphic, email, fax bids or modification to a submitted bid will be received or considered by the Owner.
The Owner will have the right to accept Alternates in any order or combination and to determine the low bidder on the basis of the sum of the base bid and the accepted Alternate.
It is the Owner’s intent to award a contract to the lowest responsible and competent bidder provided the bid has been submitted in accordance with the requirements of the bidding documents and does not exceed the funds available for construction.
The Owner reserves the right to cancel the project and contract at any point. The contractor will be reimbursed for work performed up to cancellation based upon the amount of work completed.
11. POST BID INFORMATION
The Bidder shall within seven (7) days of notification of selection for the award of the Contract for the work, submit the following information.
A. Designation of the Work to be performed by the Bidder with his own forces.
B. Proprietary names and the suppliers of principal items or systems of materials and equipment proposed for the Work.
C. List of names of the subcontractors or other persons or entities (including those who are to furnish materials or equipment fabricated to the special design) proposed for the principal portions of the Work.
D. A list of proposed job site staff and home office staff directly involved with this Project. Indicate the qualifications, pay rates, titles, responsibilities, and duties of each person.
E. Certificates evidencing insurance coverage in the amounts and types specified.
F. An interim construction schedule in a bar graph format.
G. A completed Schedule of Values in the format provided by the Owner.
The Bidder will be required to establish to the satisfaction of the Owner, the reliability and responsibility of the persons or entities proposed to furnish and perform the Work described in the Bidding Documents.
Prior to the award of the Contract, the Bidder will be notified in writing. If the Owner has reasonable objection to any proposed person or entity, the Bidder may at his option, (1) withdraw his bid or (2) submit an acceptable substitute person or entity with an adjustment in cost occasioned by such substitution. The Owner may at his discretion, accept the adjusted bid price or disqualify the Bidder.
The Owner reserves the right to request financial statements from the bidder before the award of a contract.
12. POST BID INTERVIEW
The selected Contractor as determined by the Owner may be required to attend a pre-contract award interview at the job site office of R.C. Hendrick & Son, Inc. for the purpose of reviewing the submitted bid for compliance with specified products, methods of installation, warranties, general job procedures, post bid information and related items. This will be done using Teams Meeting.
Meeting minutes of the pre-contract interview will be taken by R.C. Hendrick. Before concluding the interview, the minutes will be signed by those in attendance. The interview may be recorded in person or via conference call and will become part of the contract.
13. TAXES
Each bidder shall include in their proposal, and agree to pay, all fees and taxes including Sales and Use which they may be required to pay in connection with the performance of the contract.
Also, the bidder includes and agrees to pay for all contributions to unemployment compensation, health and welfare, appropriate benefits, or other purposes now or hereafter during the term of the contract and the Owner and Construction Manager shall not be liable for any additional charges.
14. LOCAL PRODUCTS
All prime bidders, subcontractors and suppliers shall utilize products that are local to the region or State whenever possible where price, quality and performance are equal to or better than non-local products.
15. MINORITY SUBCONTRACTORS
Bidders are encouraged to use the services of minority subcontractors if possible in the pursuance of this project.
16. NON-COLLUSION CLAUSE
By submitting and signing the proposal form, the bidder declares that neither the bidding firm nor agents of the bidding firm or any other members of the proposed team have entered into any collusion or agreement concerning any aspect of the proposal.
17. CONSTRUCTION DOCUMENT RESPONSIBILITIES
Bidders are responsible for information on all drawings.
18. WARRANTY
All work shall be guaranteed for a period of twelve (12) months from the date of substantial completion of the entire Bid Package unless more specifically stated in the contract documents.
All service during this 12-month period shall be rendered without charge to the Owner. This 12-month warranty does not replace any longer warranties required by the specification.
19. SITE VISIT
All contractors are required to visit the site to familiarize themselves with existing conditions either through the Pre-Bid Conference or through a visit you have scheduled with R.C. Hendrick.
Contractors shall not visit or walk through the site without permission from R.C. Hendrick.
20. SUBMITTALS
Submittals of product data, shop drawings, color charts and samples are required for this project. When submitting information electronically all contractors shall use the Portable Document Format (.pdf) for all email attachments. Forms and requests that are submitted in a different format may be rejected resulting in delays to the schedule and payments.
21. ADDITIONAL SETS OF DRAWINGS AND SPECS
The Owner will not furnish additional sets to the successful bidder(s). Contractors will need to purchase or reproduce additional sets of plans and specifications at their own expense.
22. EXTRA WORK
The maximum amount of markup for extra work is 15% and that shall include overhead, profit, estimating expense, other office expense, insurance and bonds.
23. SWORN STATEMENTS AND WAIVERS
Sworn statements and waivers are required with every payment request. Final payment will not be issued without full unconditional waivers from all suppliers.
24. PROJECT CLOSEOUT
Closeout documents must be submitted in both paper and electronic (PDF) formats.
END OF SECTION 00 2000
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 2200 - Bid Category General Notes
SECTION 00 2200
BID CATEGORY GENERAL NOTES
The following are General Notes that apply to all bid categories.
1. All bid categories are to include all sections in Division 0 and Division 1 in their entirety.
2. Full compliance with all the safety regulations and requirements of Federal OSHA, MIOSHA, State Authorities, Local Authorities and the Construction Manager. Failure to do so will cause this contractor to be removed from the site. (Hard Hats and Work Boots must be worn at all times.)
3. We will be using an online system called BuildingBlok for all submittals. Contractors must upload all submittals to this online system. Refer to Specification section 01 3300 – Submittal Procedures. RCH will hold one training session for contractors not familiar with the program.
There is no cost incurred by contractors for using this online system.
4. Smoking and use of Drugs or Alcohol on School property is strictly prohibited!
5. The maximum allowable markup on Changes in the Work shall be eleven percent (11%) which includes overhead, profit, estimating expenses, other office expense, bond and insurance costs.
6. Upload all start up documents to BuildingBlok within 10 working days from receipt of Notice to
Proceed. Startup documents to include signed contracts, Schedule of Values, Certificate of Insurance, Shop Drawings and Submittals, Contractors Safety Program and Current SDS Files.
7. Include sales tax in base bids.
END OF SECTION 00 2200
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 2400 - Bid Category Descriptions
SECTION 00 2400
BID CATEGORY DESCRIPTIONS
BID CATEGORY #10
RESILIENT FLOORING & CARPET
The work scope for this Bid Category includes, but is not limited to the work as specified in the R.C.
Hendrick Project Manual, the Architect’s Technical Specification, the Drawings and any Addenda issued prior to the bid date.
Provide all labor, materials and equipment to satisfy the following Specification Sections and Notes unless otherwise noted.
Division 00 Project Bidding Requirements Division 01 General Requirements
02 4119 Selective Demolition 09 6513 Resilient Base & Accessories 09 6519 Resilient Tile Flooring 09 6813 Tile Carpeting
Bid Category Notes (Including, but not limited to):
1. This bid category is responsible for all flooring demolition and subsequent floor prep.
2. Furnish and install all resilient flooring and carpeting.
3. Furnish and install all transition strips, sheet vinyl caps, etc. between different floor types.
4. Include minor floor patching and feathering as required.
5. Furnish and install vinyl base and molding accessories in all areas to receive resilient floor tile and carpet and as shown or specified.
6. Provide and install vinyl base on cabinetry after it is installed.
7. Provide a cost for Alternate #2 on the bid form.
End of BC #10 Description
BID CATEGORY #16
HVAC
The work scope for this Bid Category includes, but is not limited to the work as specified in the R.C.
Hendrick Project Manual, the Architect’s Technical Specification, the Drawings and any Addenda issued prior to the bid date.
Provide all labor, materials and equipment to satisfy the following Specification Sections and Notes unless otherwise noted.
Division 00 Project Bidding Requirements Division 01 General Requirements
07 8413 Penetration Firestopping 07 9200 Joint Sealants Division 23 Heating, Ventilating and Air Conditioning (in its entirety)
Bid Category Notes (Including, but not limited to):
1. Provide all HVAC demolition as shown or called for on plans. Contractor shall consult with CM for equipment/materials to be turned over to owner. Provide dumpster as required for demo items.
2. Furnish drawings showing size and location of concrete pads required for HVAC equipment to Construction Manager for installation by the Bid Category 6.
3. Furnish and install all sleeves in walls, floors, roofs and ceilings that may be required for this Bid Category.
4. Pay for all permits, fees, inspections and approvals required by governing jurisdictions. This will include coordination between state and local agencies to ensure code compliance and for securing approval for the facility.
5. This contractor shall be responsible for all fire wall penetrations required for this work and proper sealing of the same.
6. Coordinate delivery and storage of material with the Construction Manager prior to delivery.
Remove all cardboard from site and recycle or discard.
7. Open ductwork and piping shall have ends sealed during construction to reduce amount of dust and dirt within.
8. Provide and install pipe identification and other required identification or signage related to this Bid Category.
9. This Bid Category is also responsible for HVAC Requirements as shown on the Architectural, Fire Protection and Electrical Drawings.
10. Provide a complete HVAC system that includes all piping, ductwork, temperature controls, insulation, etc.
11. Provide and install all HVAC equipment including but not limited to Boilers, Roof Top Units, Air Handling Units, Pumps, Temperature Control System, Air/Water Balance and Testing, etc.
12. Furnish and install all louvers related to this bid category as shown or specified.
13. The HVAC, Plumbing, Fire Suppression, and Electrical Contractors will be required to coordinate with each other to accomplish final layout. Any relocation required to coordinate work will be done at no additional cost to the owner. All contractors are required to furnish layout and coordination prints for their work prior to installation.
14. Furnish access panels that may be required but are not shown. To be installed by others.
15. Provide cleaning and testing of all piping systems for the work within this category.
16. Provide a copy of all mechanical permits to the CM as soon as applied for and received.
17. Provide and install all fireproofing of penetrations, piping, ductwork, etc. which are installed in concrete floors, masonry or drywall walls.
18. Provide UL listed Firestopping at all pipe, duct and control wiring locations.
19. Provide and install roof curbs and equipment supports as required.
End of BC #16 Description
BID CATEGORY #18
PLUMBING
The work scope for this Bid Category includes, but is not limited to the work as specified in the R.C.
Hendrick Project Manual, the Architect’s Technical Specification, the Drawings and any Addenda issued prior to the bid date.
Provide all labor, materials and equipment to satisfy the following Specification Sections and Notes unless otherwise noted.
Division 00 Project Bidding Requirements Division 01 General Requirements
07 8413 Penetration Firestopping 07 9200 Joint Sealants Division 22 Plumbing (in its entirety)
Bid Category Notes (Including, but not limited to):
1. Provide all plumbing demolition as show or called for on plans. Contractor shall consult with CM for equipment/materials to be turned over to owner.
2. Furnish and install all sleeves in walls, floors, roofs and ceilings that may be required for this Bid Category.
3. Pay for all permits, fees, inspections and approvals required by governing jurisdictions. This will include coordination between state and local agencies to ensure code compliance and for securing approval for the facility.
4. This contractor shall be responsible for all fire wall penetrations required for this work and proper sealing of the same.
5. Coordinate delivery and storage of material with the Construction Manager prior to delivery.
Remove all cardboard from site and recycle or discard.
6. Open piping shall have ends sealed during construction to reduce amount of dust and dirt within.
7. Furnish and install caulking and sealers around the plumbing fixtures and pipe.
8. Furnish templates for cutting of counter tops (by others) to the Construction Manager.
9. Provide and install pipe identification and other required identification or signage related to this
Bid Category.
10. This Bid Category is also responsible for Plumbing Requirements as shown on the Architectural, Fire Protection and Electrical Drawings.
11. Provide a complete plumbing system that includes all piping, ductwork, temperature controls, insulation, fixtures, etc.
12. Provide and install all plumbing equipment
13. Layout, excavate, backfill and compact all underground piping within the building and up to 5’ outside the building. This Bid Category to make all final connections.
14. The HVAC, Plumbing, Fire Suppression, and Electrical Contractors will be required to coordinate with each other to accomplish final layout. Any relocation required to coordinate work will be done at no additional cost to the owner. All contractors are required to furnish layout and coordination prints for their work prior to installation.
15. Furnish access panels that may be required but are not shown. To be installed by others.
16. Furnish and install roof drains and overflow drains, including clamping devices.
17. Furnish and install all interior floor drains, floor sinks, trench drains, cleanouts, etc.
18. Provide cleaning and testing of all piping systems for the work within this category.
19. Provide final sterilization of potable water systems and provide test results to the CM.
20. Provide and install any/all water meters and backflow preventers for domestic water service as shown, specified, or needed to provide a complete system.
21. Provide a copy of all plumbing permits to the CM as soon as applied for and received.
22. Provide all dewatering of ground water and rainwater as necessary to perform the work of this
Bid Category.
23. Provide and install all fireproofing of penetrations, piping, etc. which are installed in concrete floors, masonry or drywall walls.
24. After placement of underground piping, grade is to be returned to the same condition as when the underground installation began – including compaction.
25. Provide flagging of all underground piping during construction and prior to placement of floors and walls.
26. Provide UL listed Firestopping at all pipe locations.
End of BC #18 Description
END OF SECTION 00 2400
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 3100 - Information Available to Bidders
SECTION 00 3100
INFORMATION AVAILABLE TO BIDDERS
1. GENERAL
1.1 RELATED DOCUMENTS
1.1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.
1.2 SOIL EVALUATION – Refer to IDI Architects Specification Section 00 3132.
1.2.2 This report identifies properties of below grade conditions and offers recommendations for the design of foundations, prepared primarily for the use of the designers.
1.2.3 The recommendations described shall not be construed as a requirement of this
Contract, unless specifically referenced in the Contract Documents.
1.2.4 This report, by its nature, cannot reveal all conditions that exist on the site. Should subsurface conditions be found to vary substantially from this report, changes in the design and construction of foundations will be made, with resulting additions or deductions to the Contract Sum accruing to the Owner.
END OF SECTION 00 3100
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 3113 - Milestone Schedule
SECTION 00 3113
MILESTONE SCHEDULE
All bid categories shall participate in coordinating the construction schedule with both the Construction Manager and other trade contractors to meet the Milestone Dates indicated in the bidding documents.
The dates either listed below or on the attached schedule are not intended to be a complete breakdown of the work; rather it is a list of milestone dates that must be met by all trade contractors to ensure the project is completed on time. Trade contractors shall include all costs they feel are necessary to complete the work by these milestone dates and include all overtime and shift work even if not called for in the scope description. All trade contractors shall endeavor to improve upon the milestone dates if possible.
If a bidder feels that the dates given are unreasonable or they are impossible to meet, they are to notify R.C. Hendrick by email prior to the bid date. R.C. Hendrick will review the request and, if necessary, issue an addendum modifying the Milestone Schedule. If no objections are heard, it will be understood that the Milestone Schedule can be met by all trade contractors.
Meeting the schedule is an imperative part of the project to all parties, therefore R.C. Hendrick reserves the right to take or recommend the following action(s) if the milestone dates are in danger of, or not, being met.
1. R.C. Hendrick will request a written recovery schedule from the trade contractor(s).
2. The trade contractor(s) will be directed to increase crew size or add equipment on site.
3. The trade contractor(s) will be directed to add a second shift or work overtime.
4. If the above measures do not fulfill the requirements of the Milestone Schedule, the trade contractor(s) may be supplemented with additional personnel or equipment by others, or any necessary action required.
All costs associated with the above measures will be the responsibility of the trade contractor(s) involved, to the extent that it was delayed by others. If a trade contractor is found to have delayed the work, they will be responsible for any additional costs necessary to get the project back on schedule.
END OF SECTION 00 3113
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 3146 - Permits
SECTION 00 3146
PERMITS
1.2 PERMITS AND FEES
1.2.1 The Owner, through the Construction Manager shall pay for and furnish the general
Building Permit.
1.2.2 Other than the Building Permit, each Trade Contractor is required to secure and pay for all permits and fees necessary for your scope of work.
1.2.3 The Construction Manager shall schedule the General Building Inspection. Trade
Contractors will be notified verbally or in writing of the date of inspection(s).
1.2.4 It is the responsibility of each Trade Contractor to schedule appropriate inspections of the work by the authorized inspector of the permit you secured. The Construction Manager is to be notified immediately of any scheduled inspection(s).
1.2.5 This project is under the following jurisdictions:
Building State of Michigan Life Safety Bureau of Fire Services Mechanical State of Michigan Plumbing / Site Utilities State of Michigan Electrical State of Michigan Elevator State of Michigan Exterior Site Utilities Local Authority Demolition State of Michigan
Permits for anything outside the building must be secured through the Local Municipality and the State.
END OF SECTION 00 3146
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 4000 - Bid Form
SECTION 00 4000
BID FORM
TO: William Chilman - Superintendent
Harbor Beach Community Schools 402 S. 5th Street
RE: Harbor Beach Community Schools BP #1 – Office Addition & Renovations
Having carefully reviewed the bidding documents described in Section 001000 and understanding the scope of work involved in the proposed Bid Category and those that interface with it, we hereby propose to furnish labor, materials, tools, equipment, supervision, insurance and services required for the completion of all work required for the Bid Category indicated in accordance with the Bid Category Description and the Contract Documents prepared by the Architect and Construction Manager.
BID CATEGORY #: DESCRIPTION:
BIDDERS NAME:
BASE BID:
Total Base Sum of
Dollars $
(OPTIONAL) COMBINED BID FOR CATEGORIES :
Total Combined Sum of
Dollars $
ADDENDA:
And having received and examined the following Addenda: (include date for acknowledgement)
Addendum Number , dated , 2026
Addendum Number , dated , 2026
Addendum Number , dated , 2026
Addendum Number , dated , 2026
Addendum Number , dated , 2026
ALTERNATES:
Bidders shall indicate on the Bid Form if the Alternate is an ADD or DEDUCT to the Base Bid and indicate the costs associated. See Specification Section 01 2300 for the full descriptions. If the Alternate does not affect your base bid you must circle NO CHANGE.
Alternate #1: Science Lab Countertop Refinishing BASE BID: No modifications to existing countertop ALTERNATE: Refinish Existing Lab Countertops in Science Room H121
$_____________________________________________________________ADD/DEDUCT (circle one)
Alternate #2: Flooring Installation and Moisture Mitigation
BASE BID: N/A
ALTERNATE: Provide SF cost for moisture mitigation in preparation for flooring installation following
ASTM F3010 – Standard practice for two component resin based membrane forming moisture mitigation systems for use under resilient floor coverings.
$____________________________________________________________/SF ADD/DEDUCT (circle one)
UNIT PRICES:
Unit prices shall include all necessary material plus costs for delivery, installation, insurance, bonds, applicable taxes, overhead and profit. See the drawings and Section 01 2200 for the full description.
VOLUNTARY ALTERNATES / SUBSTITUTIONS:
Bidder is cautioned to bid on the “Standards” specified. The following substitutions from the “Standards” specified are listed herein for consideration, and if accepted, the contract sum may be adjusted in accordance with the following:
Add / Deduct $
Add / Deduct $
TIME AND MATERIAL RATES: (REQUIRED)
Labor rates listed below include the following: Cost of labor including Michigan Single Business Tax, Social Security and Medicare, Federal and State Unemployment tax, and Fringe Benefits Under Collective Bargaining Agreements, and Worker’s Compensation Insurance. The rates listed below do not include overhead and/or profit. These rates are only for additions and/or deletions to the contract that could not have been anticipated at the time of the bid.
Trade Straight Time Shift Time 1 ½ Time Double Time
EXPERIENCE MODIFICATION RATE (EMR):
List the EMR for your firm as described by your insurance carrier for the past three (3) years.
2025 2024 2023
IRAN BUSINESS RELATIONSHIP AFFIDAVIT:
Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response, Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran Linked Business,” as that term is defined in the Act.
WORK TIME:
The undersigned hereby agrees to complete the entire work per the Milestone Schedule.
CONTRACT:
The undersigned agrees that the above Base Bid Prices shall hold for 60 days and Alternate Prices for 120 days after receipt of proposals, to accept provisions of “Instructions to Bidders.”
SUBMITTED BY:
Firm Name:
Address:
City/St/Zip:
Email Address:
Signed: Title:
Typed Name: Date:
Phone: Fax:
If Bidder is a Corporation, indicate State of Incorporation:
If a Partnership, give full names of all Partners:
Please submit (3) copies and retain (1) copy for your records.
END OF SECTION 00 4000
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 4100 - Familial Disclosure Statement
SECTION 00 4100
FAMILIAL DISCLOSURE STATEMENT
All bidders must complete the following familial disclosure form in compliance with MCL 380.1267 (Public Act 232 of 2004) and attach this information to the bid.
By the attached sworn and notarized statement we are disclosing the following familial relationship(s) that exists between the owner or any employee of the bidder and any member of the board, intermediate school board, or board of directors or the superintendent of the school district, intermediate superintendent of the intermediate school district, or chief executive officer of the public school academy.
The Owner shall not accept a bid that does not include this sworn and notarized disclosure statement.
Disclose any familial relationship and complete the form below in its entirety.
The following are familial relationships as described above. (Provide employee name, family contact name, family contact position, and familial relationship or NONE.)
Signature(s): Title: Title:
Name of firm:
STATE OF MICHIGAN )
) SS
COUNTY OF )
On this day of , 20 , before me a Notary Public in and for said county, personally appeared , agent of the said firm and who acknowledged the same to be his free act and deed as such agent.
Notary Public
END OF SECTION 00 4100
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 5000 - Contract / Agreement Form
SECTION 00 5000
CONTRACT / AGREEMENT FORM
1.2 CONTRACT / AGREEMENT FORM
1.2.1 Contracts will be direct between the Owner and the Trade Contractor.
1.2.2 The form of agreement will be the Standard Form of Agreement Between Owner and
Contractor, Construction Manager as Adviser Edition, AIA Document A132-2009.
Please note that the version used is the most recently modified version as modified by Thrun Law.
1.2.3 A sample copy of the agreement form can be viewed or downloaded at:
www.rchendrick.com. Click on “Plan Room” and then click on the link “Specification Forms.”
END OF SECTION 00 5000
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 6100 - Bonds
SECTION 00 6100
BONDS
1.2 BID BONDS
1.2.1 Each bid which exceeds $50,000 must be submitted with an attached certified check, money order, or a bid bond from a surety company approved to do business in the State of Michigan, payable to the Owner in an amount not less than 5% of the base bid sum of the work.
1.3 PERFORMANCE AND PAYMENT BONDS
1.3.1 Prior to the execution of the contract, furnish bonds covering the faithful performance of the contract and the payment of all obligations arising there under. Include cost of bonds in the base bid. The bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of their power of attorney.
END OF SECTION 00 6100
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 7200 - General Conditions
SECTION 00 7200
GENERAL CONDITIONS
1.2 GENERAL CONDITIONS
1.2.1 The General Conditions which shall become a part of the agreement will be the
General Conditions of the Contract for Construction, Construction Manager as Adviser Edition, AIA Document A232-2009.
1.2.2 A sample copy of the General Conditions can be viewed or downloaded at:
END OF SECTION 00 7200
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 7300 - Supplementary Conditions
SECTION 00 7300
SUPPLEMENTARY CONDITIONS
GENERAL CONDITIONS
1. The General Conditions of this contract are the American Institute of Architects Standard Document A232-2009, titled “General Conditions of the Contract for Construction, Construction Manager as Adviser Edition.” This document is hereby made part of the Contract Documents.
2. The following supplements modify AIA Document A232-2009, General Conditions of the
Contract for Construction, Construction Manager as Adviser Edition. Where a portion of the General Conditions is modified or deleted by these Supplementary Conditions, the unaltered portions of the General Conditions shall remain in effect.
ARTICLE 2 - OWNER
1. Delete subparagraph 2.2.5 and substitute:
2.2.5 - The Contractor will be furnished, subject to a deposit, all copies of drawings and specifications reasonably necessary for execution of the work as determined by the Construction Manager.
ARTICLE 3 - CONTRACTOR
1. Add Section 3.4.2.1 to Section 3.4.2:
3.4.2.1 After the Contract has been executed, the Owner, Construction Manager and Architect will consider requests for the substitution of products in place of those specified only under the conditions set forth in the General Requirements (Division 1 of the Specifications).
By making requests for substitutions, the Contractor:
.1 represents that it has personally investigated the proposed substitute product and determined that it is equal or superior in all respects to that specified;
.2 represents that it will provide the same warranty for the substitution as it would have provided for the product specified;
.3 certifies that the cost data presented is complete and includes all related costs for the substituted product and for Work that must be changed as a result of the substitution, except for the Architect’s redesign costs, and waives all claims for additional costs related to the substitution that subsequently become apparent; and
.4 shall coordinate the installation of the accepted substitute, making such changes as may be required for the Work to be complete in all respects.
2. Delete subparagraph 3.4.3 and substitute:
3.4.3 The Contractor shall at all times enforce strict discipline and good order among the Contractor’s employees and any subcontractor employed by the contractor and shall not employ on the work any unfit person or anyone not skilled in the task assigned to them.
ARTICLE 7 - CHANGES IN THE WORK
1. Add Subparagraph 7.1.4
7.1.4 The maximum allowable markup on Changes in the Work shall be eleven percent (11%) which includes overhead, profit, estimating expenses, other office expense, bond and insurance costs.”
2. RE: Subparagraph 7.3.7
Delete the words, “the Agreement, or if no such amount is set forth in the Agreement, a reasonable amount.” and insert the words, “Section 7.1.4.”
ARTICLE 8 - TIME
1. Add subparagraph 8.3.4
8.3.4 Claims for Delay: In the event the contractor is delayed in completing the work by the Owner for any reason, whether intentional or otherwise, and the delay does not preclude the contractor from completing the work within the time period specified in the contract agreement, the contractor shall be entitled to no remedy for such delay.
ARTICLE 9 - PAYMENTS AND COMPLETION
1. Add subparagraph 9.3.1.3
9.3.1.3 Up to time the work is substantially complete, the owner will make monthly payments to the contractor, based on the schedule of values of 90% of the value of labor and materials incorporated in the work and of 90% of all tangible materials stored at the site during that month. The Owner will have retained five percent (5%) of the total contract price for “Closeout Materials” and five (5%) of the total contract price for “Punch List Completion”. The Contractor may request payment of the retained percentages upon completion of that portion of their Work.
2. Add subparagraph 9.3.1.4
9.3.1.4 Deliver estimates to the Construction Manager for approval as agreed upon. The form of application for payment shall be AIA Document G732-2009, notarized by Contractor and supported by AIA Document G703 – Continuation Sheet.
3. Add clause .8 to subparagraph 9.5.1
.8 Unsatisfactory clean-up in accordance with subparagraph 3.15.
ARTICLE 11 - INSURANCE
1. Add the following Sections 11.1.2.1 through 11.1.2.4 to Section 11.1.2:
11.1.2.1 The limits for Worker’s Compensation and Employers’ Liability insurance shall meet statutory limits mandated by State and Federal laws. If (1) limits in excess of those required by statute are to be provided, (2) the employer is not statutorily bound to obtain such insurance coverage, or (3) additional coverages are required, additional coverages and limits for such insurance shall be as follows:
WORKER’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE:
Worker’s Compensation: State of Michigan Statutory Limits
Employer’s Liability: $500,000 - each accident
$500,000 - disease (each employee) $500,000 - disease (policy limit)
11.1.2.2 The limits for Commercial General Liability insurance including coverage for Premises-Operations, Independent Contractors’ Protective, Products-Completed Operations, Contractual Liability, Personal Injury and Broad Form Property Damage (including coverage for Explosion, Collapse, and Underground Hazards) shall be as follows:
COMMERCIAL GENERAL LIABILITY INSURANCE:
Bodily Injury $1,000,000 - each occurrence $2,000,000 - aggregate
Property Damage $1,000,000 - each occurrence
Fire Damage (any one fire) $100,000
Medical Expense (any one person) $5,000
Notes:
(1) Products-Completed Operations Insurance shall be maintained for a minimum period of one (1) year after final payment.
(2) The Owner, Architect and Construction Manager shall be listed as additional insured. The Owner shall be the certificate holder.
11.1.2.3 Automobile Liability insurance (owned, non-owned and hired vehicles) for bodily injury and property damage:
AUTOMOBILE LIABILITY INSURANCE:
Bodily Injury $1,000,000 Property Damage $1,000,000
11.1.2.4 Umbrella or Excess Liability Coverage:
UMBRELLA / EXCESS LIABILITY INSURANCE:
Umbrella/Excess Insurance $2,000,000 - each occurrence
2. Add Subparagraph 11.3.11
11.3.11 The provisions of this paragraph 11.3 shall not operate to relieve the Contractor of responsibility for loss or damage to the Contractor’s own or rented property or property of Contractor’s employees of whatever kind or nature, including but not limited to: tools, equipment, forms, scaffolding and temporary structures, including their contents. The Owner shall in no event be liable for loss or damage to the aforementioned items or other property of the contractor that is not included in the permanent construction.
3. Delete Subparagraph 11.3.7 Waivers of Subrogation
ARTICLE 13 - MISCELLANEOUS PROVISIONS
1. Delete subparagraph 13.6 - Interest in its entirety.
END OF SECTION 00 7300
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 7316 - Insurance Requirements
SECTION 00 7316
INSURANCE REQUIREMENTS
1.2 INSURANCE REQUIREMENTS
1.2.1 Each contractor shall provide, to the Owner, through the Construction Manager, a certificate of insurance indicating that all required insurance coverage is in effect. This certificate shall be provided before any Work begins.
1.2.2 Limits of required insurance are listed in the Supplementary Conditions, Section 00
7300 – Article 11. Contractors are to provide at least the limits stated in that section.
1.2.3 The Owner, Architect, and Construction Manager shall be listed as “additional insured” on the insurance certificate.
1.2.4 A sample Acord Insurance Certificate with instructions is attached for your use.
1.3 INSURANCE FOR STORED MATERIAL
1.3.1 If a Contractor wishes to be paid for stored material that is not presently on the jobsite, they will be required to furnish photographic evidence of the material as well as an insurance certificate for the material.
1.4 BUILDER’S RISK INSURANCE
1.4.1 Per the General Conditions, the Owner shall secure and pay for Builder’s Risk
Insurance for the Project.
END OF SECTION 00 7316
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 7317 - Sample Insurance Certificate
BP #2 – Office Addition & Renovations Flooring, HVAC & Plumbing 00 8100 - Safety Requirements
SECTION 00 8100
SAFETY REQUIREMENTS
1.2 SAFETY NARRATIVE
1.2.1 Safety does not start in the field; it takes planning and forethought before field operations even begin. Contractors will require a clear vision of what work activities their respective companies will perform and how to provide a safe work environment for all persons on the site.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .