Gym Floor Replacement
Closed State & local contract opportunity Posted
- Solicitation number
- PE-55612-NONST-2024-000000002
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 36020 Floor Covering, Seamless (All Types)
- 36028 Non-Slip Floor Coverings: Mats, Rolls, Strips, Etc.
- 36055 Sheet Rubber, Floor
- 36056 Sheet Vinyl, Cushioned
- 36060 Special Flooring, Industrial, Resinous, Elastomeric Liquid, Etc.
- 90966 Maintenance And Repair, Educational Building
- 91025 Flooring Maintenance And Repair To Include Refinishing And Sealing
- 91444 Flooring
- UNSPSC codes
- 46182104 Anti static floor mats
- 52101507 Bath mats
- 52101510 Anti fatigue mats
- 52101511 Rubber or vinyl mats
- 52101515 Floor cushion
- 30161707 Vinyl flooring
- 30122000 Specialized external flooring and paving materials
- 30122001 Elastic sheet exterior paving material
- 30122002 Exterior permeable aggregate flooring material
- 30122003 Painted or coated exterior flooring
Show all 21
- 30122004 Non skid exterior paving material
- 30161722 Stoneplastic composite flooring
- 72152500 Floor laying services
- 72152501 Access flooring system installation service
- 72152503 Carpet laying service
- 72152505 Linoleum installation service
- 72152506 Resilient floor laying service
- 72152507 Vinyl floor tile and sheet installation service
- 72152508 Wood floor installation and refinishing service
- 72152509 Floor leveling service
- 72154017 Food service equipment installation service
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The state of Georgia is seeking proposals for the replacement of existing gymnasium flooring at three middle schools located in Brooks County. The scope of work includes the removal and replacement of the Omnisports flooring, urethane pad underlayment, and existing retractable bleachers. The new flooring must match the existing golden maple game floor, with painted game lines to match all existing lines. The base bid requires replacement of flooring under the bleachers, while the alternate bid encompasses the full replacement of the gymnasium flooring, excluding the existing basketball court. Mandatory qualifications for the installer are outlined, along with warranty requirements. Proposals are due by February 9, 2024, and a pre-bid meeting is scheduled. The RFP states that the Owner reserves the right to reject any or all bids and award the project based on the best interest of the Owner.
The RFP does not specify any set-aside designations or restrictions on the types of organizations that can respond. No incumbent vendors or current contractors are listed, and no information is provided regarding the available budget or award value range.
Opportunity text
Base Bid The scope of work includes the replacement of existing Onmisports flooring. Replace existing urethane pad underlay as necessary. Ensure an even transition between replacement flooring remaining/existing flooring, including basketball courts, offices, hallways, etc. Color match to existing golden maple game floor and replace approximately 114¿ x 25¿ sections of flooring under each set of bleachers with Omnisports HPL (home and visitor sides, two sections per school). The replacement floor shall be seamed to the existing floor at the basketball court sideline. Remove existing retractable bleachers and reinstall. Paint game lines on replacement flooring to match all existing lines at William James Middle School and Langston Chapel Middle School. Paint game lines on replacement flooring and all existing game lines, including school logo at center court at South East Bulloch Middle School. Game lines may exist that are for sports other than basketball. Replace existing cove base Alternate No. 1 The scope of work includes the replacement existing of Onmisports flooring. Replace existing urethane pad underlay as necessary. Ensure an even transition between replacement flooring remaining/existing flooring, including basketball courts, offices, hallways, etc. Replace existing flooring to the basketball court sidelines and end lines with Omnisports HPL in a color selected by owner (colors may vary by school). Approximately 6700 sq. ft. / school. Alternate 1 includes replacement of all flooring in each gym with the exception of the existing basketball court flooring. The replacement floor shall be seamed to the existing floor at the basketball court sideline and end lines. Remove existing retractable bleachers and reinstall. Paint court lines on replacement flooring to match all existing lines at William James Middle School and Langston Chapel Middle School. Paint court lines on replacement flooring and all existing game lines, including school logo
Files
| File | Type | Posted |
|---|---|---|
| Request for Proposal Gym Floors.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity