Great Outdoors Water Park: Fencing Reconfiguration Project

Closed State & local contract opportunity Posted

Solicitation number
RFP-26-28-REC
State
Colorado
Responses due

Opportunity facts

Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Lafayette, Colorado is requesting proposals for fencing reconfiguration at Great Outdoors Water Park under RFP-26-28-REC, with proposals due August 31, 2026 at 5:00 p.m. MT and a pre-proposal conference on August 11, 2026 at 9:00 a.m. This is a public works project exceeding $50,000, requiring 100% Performance and Payment Bonds.

The scope includes removal of existing 8-foot Ameristar Montage Plus Classic ornamental steel fence panels and core-drilled posts from the concrete pool deck, installation of new surface-mounted fence posts using manufacturer-approved anchoring systems, concrete core patching and surface repair, temporary fencing maintenance throughout project duration, and furnishing and installation of three commercial-grade gates: a front entry gate with panic hardware, a double-swing gate with padlock-ready locking hardware, and an exit gate with self-closing hinges and anti-tamper features. All pricing must be comprehensive and include labor, materials, equipment, permits, and services for all project phases. Contractors must hold all required licenses and certifications for fencing installation, concrete work, and gate hardware in Lafayette, Colorado; provide product data sheets and samples demonstrating compatibility with the existing Montage Plus Classic model; and provide at least three verifiable project references. A minimum one-year warranty on all labor and workmanship and manufacturer warranties on all components are required.

Evaluation uses a 100-point scale: Experience & Qualifications (25 points), Safety & Code Compliance (25 points), Price (25 points), Material Compatibility and Product Quality (15 points), and Project Timeline (10 points). The contract term runs September 21, 2026 through December 31, 2026 with no renewal options. Contractors must provide Commercial General Liability Insurance with minimum combined single limits of $1 million per occurrence and $2 million aggregate, Workers' Compensation Insurance per Colorado law, and Comprehensive Automotive Liability Insurance of $500,000 combined single limit. Written inquiries are due August 21, 2026 at 5:00 p.m. MT, with City responses due August 26, 2026.

Opportunity text

The purpose of this project is to reconfigure the Ameristar Montage Plus Classic entry and exit fencing at the water park to improve customer flow, clearly define exit pathways, and provide better access to the pool deck for maintenance vehicles and large equipment. This work includes removing the existing fence and gate structures and installing new, durable, and tamper-resistant gates and fencing designed to support safety, efficiency, and long-term operations

Files

File Type Posted
biddoc.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity