About this opportunity
The City of Lauderhill is soliciting sealed bids for renovation and replacement of ten municipal park playground areas under GO Bond Project (Bid 2026-064), with bids due October 26, 2026 at 3:45 p.m. EST and a non-mandatory pre-bid conference and site visit on October 13, 2026 at 3:00 p.m. Questions are due ten days prior to bid opening.
Bidders must hold a current State Certified License or State Registration with a Broward County Certificate of Competency and valid Certificate of Insurance naming the City as certificate holder. All equipment must be new, IPEMA certified, and compliant with ASTM F1487, CPSC Public Playground Safety Guidelines, ADA accessibility requirements, and Florida Building Code standards.
The scope includes removal and legal disposal of existing playground equipment, site demolition, excavation, grading, drainage correction, and base preparation; furnishing and installation of ten new commercial-grade playground systems; commercial artificial turf safety surfacing with impact attenuation, drainage, and concrete containment; engineered commercial shade canopy systems; park benches (18 total), trash receptacles (11 total), and picnic tables (2 at Boulevard Woods); playground signage and site furnishings; and all required permits, engineering, inspections, certifications, testing, and warranty services. The ten playgrounds are located at John Mullin Park (West and Southeast), Windermere Community Center, Ruth Rothkopf, Boulevard Woods, Ilene Lieberman, Sports Park, West Ken Lark, Maye Jenkins, and West Wind Park.
Bidders must submit lump sum pricing for each of the ten playground areas plus a total project price, with separate pricing for canopy fabric replacement (existing posts/footings) versus complete canopy replacement (new posts/foundations). A 5% bid security (bid bond or certified check) is required. Upon award, contractors must provide 100% Construction Performance Bonds and 100% Construction Payment Bonds within fifteen calendar days. The contract term is 120 calendar days from Notice to Proceed for each park, with liquidated damages of $500 per calendar day for delays. Warranty requirements include one year for all equipment and materials and a minimum ten-year warranty for artificial turf safety surfacing systems.
Opportunity text
The City of Lauderhill is soliciting sealed bids from qualified contractors to furnish all labor, supervision, project management, engineering, permits, materials, equipment, transportation, tools, disposal, testing, inspections, and incidentals necessary to complete the renovation and replacement of ten (10) municipal park playground areas. The intent of this Scope of Work (SOW) is to replace aging playground equipment while improving safety, accessibility, aesthetics, durability, play value, and long-term maintenance. The Contractor shall provide complete turnkey construction services for each playground area. The work shall include, but not be limited to: Removal and legal disposal of existing playground equipment, artificial turf, playground safety surfacing, impact-attenuation padding, borders, foundations where required, benches, trash receptacles, and other site improvements designated by the City. Site demolition, excavation, grading, compaction, drainage correction, base preparation, and concrete edging required for the new playground improvements. Furnishing and installation of ten (10) new commercial-grade playground systems at the playground areas identified in this Scope of Work. Furnishing and installation of commercial playground artificial turf safety surfacing, including impact attenuation, drainage, base preparation, concrete containment/curbing, seams, transitions, infill where applicable, adhesives, and accessories. Furnishing and installation of engineered commercial shade canopy systems as specified for each playground. Furnishing and installation of specified park benches, trash receptacles, playground rules and safety signage, and other site furnishings identified in this Scope of Work. Required permits, engineering, inspections, certifications, testing, coordination, cleanup, restoration, and warranty services. The Contractor shall provide a complete, safe, accessible, fully operational, and code compliant playground at each playground area
Files
| File | Type | Posted |
|---|---|---|
| lauderhill BID 2026-064 GO BOND PROJECT - MUNICIPAL PARKS PLAYGROUND REPLACEMENT.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity