Glass Panel Replacement, St. Pete Pier

Open State & local contract opportunity Posted

Solicitation number
Quote- 27 - 005
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of St. Petersburg, Florida's Procurement & Supply Management Department is soliciting quotes under RFQ 27-005 to remove and replace one damaged insulated glass panel at Tampa Bay Watch on the St. Pete Pier, with a mandatory pre-proposal meeting on November 23, 2026 and quotes due December 3, 2026 at 12:00 p.m. Eligibility turns on licensing: vendors must hold an active Florida license as a Glass and Glazing Contractor, General Contractor, or Building Contractor, be registered to work in Pinellas County, and submit a copy of the license with the quote. Written questions are due November 25, 2026, and quotes must be submitted electronically through the OpenGov Procurement portal.

The panel is trapezoidal, with a laminated interior lite, 1-inch overall thickness, and exterior Optiblue glass with Solarban 70 coating. Approximate dimensions are 41 1/16 inches (top width), 41 inches (bottom width), 89 3/8 inches (left height), and 87 15/16 inches (right height). The specification documents state that glazing must be sourced from Vitro Certified Network manufacturers. The vendor must handle permits, schedule inspections, comply with the Florida Building Code including wind-load requirements, pass final inspection, and provide the manufacturer's glass warranty and an installation workmanship warranty. The cost proposal is lump-sum and covers labor, materials, equipment, permits, and debris disposal.

No contract value is stated. The contract term begins on execution and runs until completion and acceptance, with all work due within 60 calendar days of execution unless the City approves a written extension. Work is performed at 700 2nd Ave NE, St. Petersburg, Florida, in Pinellas County. The City provides a Performance and Payment Bond form and a public construction bond document, with the bond amount to be completed based on contract value. A Subcontractor Summary worksheet must accompany all bids and lists each subcontractor by legal name, address, trade, and subcontract amount. It limits subcontracting to two tiers unless the contract documents state otherwise. Any SBE or MWBE subcontractor used to meet contract requirements may be replaced only with an equivalent SBE or MWBE entity.

Opportunity text

The City of St. Petersburg is seeking quotes from qualified vendors to replace an existing shattered storefront glass panel located in the upper portion of the Tampa Bay Watch tenant building at the St. Pete Pier.

Files

File Type Posted
Glass_Panel_Replacement,_St._Pete_Pier_(Addendum_#1_Revision).pdf PDF
Glass_Panel_Replacement,_St._Pete_Pier.pdf PDF
Base_Agreement.pdf PDF
Dimensions_of_Glass_.pdf PDF
Replacement_Glass_Specs.pdf PDF
Public_Construction_Bond.docx DOCX document
Light_Construction_Agreement.docx DOCX document
Performance_&_Payment_Bond_.DOCX DOCX document
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
Subcontractor_Utilization_Plan.docx DOCX document
Show all 11

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors