About this opportunity

The Berkshire Regional Group Purchasing Program (BRGPP), acting on behalf of 32 participating municipalities in Berkshire County, Massachusetts, is soliciting bids for the FY27-09 Chip Seal cooperative purchase covering the period July 1, 2026 through June 30, 2027. This procurement seeks asphalt-rubber chip seal surface treatment services with an estimated contract value of $59,580.00, with Lee identified as a North County participant requiring 9,500 square yards of chip seal application with 10% rubber content. The services involve the application of crumb rubber polymerized asphalt (RPM) or conventional chip seal surface treatments, including material preparation, field application, quality control, and completion of work according to detailed technical specifications. Deliverables include the supply and installation of PG 58-28 or PG 64-28 asphalt binder, vulcanized ground rubber from scrap tires, and pre-heated crushed stone aggregate applied at specified rates (0.35 to 0.45 gallons per square yard for RPM treatment with 30 to 40 pounds per square yard aggregate coverage). All bidders must obtain MassDOT prequalification for Stone Sealing work prior to submission and must provide evidence of at least six successfully completed similar projects with contact information. Pricing shall be submitted as a unit cost per square yard for complete in-place work, with a fluctuating price adjustment mechanism based on variance in asphalt cement pricing from a base price of $615.00 per ton. Bid packages became available March 12, 2026, with a question submission deadline of March 27, 2026 at 4:00 p.m. and a question response deadline of March 30, 2026 at 4:00 p.m. All bids must be submitted electronically through the OpenGov procurement portal by April 2, 2026 at 1:00 p.m., with contract award anticipated by April 20, 2026. All work must comply with MassDOT 2026 Standard Specifications for Highways and Bridges and detailed specifications regarding surface preparation, weather conditions (minimum 50°F with rising temperatures, no work after September 1), material application procedures, and rolling and sweeping requirements.

All bidders are subject to Massachusetts prevailing wage rate requirements under General Laws Chapter 149, Sections 26-27F and Chapter 30, Section 39M, with mandatory compliance documentation and weekly payroll reporting required. A 5% bid deposit in the form of a certified check, cashier's check, or bid bond from a licensed surety company is required for all bids exceeding $50,000. Successful bidders must maintain comprehensive insurance coverage including $1,000,000 general liability per occurrence and $3,000,000 aggregate, and must provide a labor and materials payment bond equal to 50% of the awarded contract value upon contract execution. The winning bidder must visit the job site with the Director, retain ownership of all equipment used, and submit quarterly reports detailing goods and services purchased, remitting a quarterly administrative fee of 1.75% of reported purchases to BRGPP. Additional required submissions include tax compliance forms, non-collusion statements, debarment forms, OSHA certifications, three client references, and proof of liability insurance. The winning bidder must submit a one-year guarantee on all materials and workmanship, maintain quarterly reporting and administrative fee payments, and comply with all applicable federal, state, and local laws and regulations governing prevailing wage, safety, environmental protection, and labor standards throughout the contract term ending June 30, 2027.

Opportunity text

2 versions

Update #2 · Latest ·

The Berkshire Regional Group Purchasing Program (BRGPP), acting on behalf of its participating members, invites bids for joint cooperative purchases for July 1, 2026 through June 30, 2027 for the following highway supplies and service categories:

  • FY27-01 Aggregates & Loam
  • FY27-02 Cold Patch
  • FY27-03 Calcium & Magnesium Chloride
  • FY27-04 Culvert Products
  • FY27-05 Guardrail Delivered
  • FY27-06 Guardrail Installed
  • FY27-07 Line Painting
  • FY27-08 Pavement Preservation Products
  • FY27-09 Chip Seal
  • FY27-10 Hot Mix Asphalt
  • FY27-10A Paving
  • FY27-11 Winter Rock Salt
  • FY27-12 Winter Sand
  • FY27-13 Pre-Treat Liquid and Treated Winter Salt
  • FY27-14 Gasoline
  • FY27-15 Diesel Fuel
  • FY27-16 Heating Oil
  • FY27-17 Liquid Propane
  • FY27-18 Catch Basin Cleaning & Line Jetting
  • FY27-19 Tree Work
  • FY27-20 Street Sweeping

Bid packages are available starting Thursday, March 12, 2026 at BRGPP's OpenGov online procurement portal found at: https://procurement.opengov.com/portal/berkshire-planning.

Bids must be submitted through the online procurement portal no later than Thursday, April 2, 2026 at 1:00 pm. Bids will then be opened publicly and read aloud.

All bids for services are subject to the prevailing wage rates as per Massachusetts General Laws Chapter 149, Section 26 to 27F inclusive and Chapter 30, Section 39M, and a 5% bid deposit is required, in the form of a bid bond or certified check, unless specified in the bid package.

All bidders must be pre-qualified by MassDOT for the following approved classes of work and their respective estimated values:

  • FY27-06 Guardrail and Fencing: $40,114.00
  • FY27-07 Pavement Markings: $607,154.50
  • FY27-08 Pavement Surfacing: $1,748,500.00
  • FY27-09 Pavement Surfacing: $59,580.00
  • FY27-10A Pavement Surfacing:
    • Northern Berkshire County: $985,671.00
    • Central Berkshire County: $332,730.00
    • Southern Berkshire County: $1,729,980.00
  • FY27-29-18 Catch Basin Cleaning: $591,000.00
  • FY27-29-19 Tree Trimming, Maintenance, and Removal: $1,230,240.00
  • FY27-20 Street Sweeping: $61,440.00

As the awarding authority, BRGPP and its participants reserve the right to accept or reject any or all bids, in total or in part, and to take whatever action is deemed most favorable to the best interest of all the participants. Minority and woman-owned businesses are encouraged to submit bids. All bids will receive consideration without regard to race, color, religion, national origin, sex, age, sexual orientation, or disability. BRGPP is an Affirmative Action/Equal Opportunity Employer.

Update #1 ·

The Berkshire Regional Group Purchasing Program (BRGPP), acting on behalf of its participating members, invites bids for joint cooperative purchases for July 1, 2026 through June 30, 2027 for the following highway supplies and service categories:

  • FY27-01 Aggregates & Loam
  • FY27-02 Cold Patch
  • FY27-03 Calcium & Magnesium Chloride
  • FY27-04 Culvert Products
  • FY27-05 Guardrail Delivered;
  • FY27-06 Guardrail Installed
  • FY27-07 Line Painting
  • FY27-08 Pavement Preservation Products
  • FY27-09 Chip Seal
  • FY27-10 Hot Mix Asphalt
  • FY27-10A Paving
  • FY27-11 Winter Rock Salt
  • FY27-12 Winter Sand
  • FY27-13 Pre-Treat Liquid and Treated Winter Salt
  • FY27-14 Gasoline
  • FY27-15 Diesel Fuel
  • FY27-16 Heating Oil
  • FY27-17 Liquid Propane
  • FY27-18 Catch Basin Cleaning & Line Jetting
  • FY27-19 Tree Work
  • FY27-20 Street Sweeping

Bid packages are available starting Thursday, March 12, 2026 at BRGPP's OpenGov online procurement portal found at: https://procurement.opengov.com/portal/berkshire-planning.

Bids must be submitted through the online procurement portal no later than Thursday, April 2, 2026 at 1:00 pm. Bids will then be opened publicly and read aloud.

All bids for services are subject to the prevailing wage rates as per Massachusetts General Laws Chapter 149, Section 26 to 27F inclusive and Chapter 30, Section 39M, and a 5% bid deposit is required, in the form of a bid bond or certified check, unless specified in the bid package.

All bidders must be pre-qualified by MassDOT for the following approved classes of work and their respective estimated values:

  • FY27-06 Guard Rail Installed: $40,114.00
  • FY27-07 Line Painting: $607,154.50
  • FY27-08 Pavement Preservation Products: $1,748,500.00
  • FY27-09 Chip Seal: $59,580.00
  • FY27-10A Paving:
    • Northern Berkshire County: $985,671.00
    • Central Berkshire County: $332,730.00
    • Southern Berkshire County: $1,729,980.00
  • FY27-18 Catch Basin Cleaning & Line Jetting: $591,000.00
  • FY27-19 Tree Work: $1,230,240.00
  • FY27-20 Street Sweeping: $61,440.00

As the awarding authority, BRGPP and its participants reserve the right to accept or reject any or all bids, in total or in part, and to take whatever action is deemed most favorable to the best interest of all the participants. Minority and woman-owned businesses are encouraged to submit bids. All bids will receive consideration without regard to race, color, religion, national origin, sex, age, sexual orientation, or disability. BRGPP is an Affirmative Action/Equal Opportunity Employer.

Files

File Type Posted
FY27-09_Chip_Seal_(Addendum_#1_Revision).pdf PDF
FY27-09_Chip_Seal_(Addendum_#1_Revision).pdf PDF
FY27-09_Chip_Seal.pdf PDF
FY27_Contract_Template.docx DOCX document
FY27_Contract_Template.docx DOCX document
FY27_Contract_Template.docx DOCX document
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_III,_Materials.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_III,_Materials.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_III,_Materials.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_II,_Construction_Details.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_II,_Construction_Details.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_II,_Construction_Details.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_I,_General_Requirements_and_Covenants.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_I,_General_Requirements_and_Covenants.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Division_I,_General_Requirements_and_Covenants.pdf PDF
Spray_Applied_Penetrating_Asphalt_Rejuvenator_Specifications_Version_2022.1.docx DOCX document
Spray_Applied_Penetrating_Asphalt_Rejuvenator_Specifications_Version_2022.1.docx DOCX document
Spray_Applied_Penetrating_Asphalt_Rejuvenator_Specifications_Version_2022.1.docx DOCX document
Chip_Seal_Specifications.docx DOCX document
Chip_Seal_Specifications.docx DOCX document
Chip_Seal_Specifications.docx DOCX document
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Amendments_to_Previous_Versions.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Amendments_to_Previous_Versions.pdf PDF
MassDOT_2026_Standard_Specifications_for_Highways_and_Bridges,_Amendments_to_Previous_Versions.pdf PDF
Polymer_Rejuvenated_Fog_Seal_Specification_Version_2022.1.docx DOCX document
Polymer_Rejuvenated_Fog_Seal_Specification_Version_2022.1.docx DOCX document
Polymer_Rejuvenated_Fog_Seal_Specification_Version_2022.1.docx DOCX document
FY27_Municipal_Contacts.xlsx XLSX spreadsheet
FY27_Municipal_Contacts.xlsx XLSX spreadsheet
FY27_Municipal_Contacts.xlsx XLSX spreadsheet
FY27-19_Tree_Services_Prevailing_Wages.pdf PDF
FY27-19_Tree_Services_Prevailing_Wages.pdf PDF
FY27-19_Tree_Services_Prevailing_Wages.pdf PDF
Cape_Seal_Specifications.docx DOCX document
Cape_Seal_Specifications.docx DOCX document
Cape_Seal_Specifications.docx DOCX document
Micro-Surfacing_Specifications.docx DOCX document
Micro-Surfacing_Specifications.docx DOCX document
Micro-Surfacing_Specifications.docx DOCX document
FY27-20_Street_Sweeping_Prevailing_Wages.pdf PDF
FY27-20_Street_Sweeping_Prevailing_Wages.pdf PDF
FY27-20_Street_Sweeping_Prevailing_Wages.pdf PDF
FY27-08_Pavement_Preservation_Prevailing_Wages.pdf PDF
FY27-08_Pavement_Preservation_Prevailing_Wages.pdf PDF
FY27-08_Pavement_Preservation_Prevailing_Wages.pdf PDF
FY27-06_Guardrail_Installed_Prevailing_Wages.pdf PDF
FY27-06_Guardrail_Installed_Prevailing_Wages.pdf PDF
FY27-06_Guardrail_Installed_Prevailing_Wages.pdf PDF
FY27-09_Stone_Seal_Prevailing_Wages.pdf PDF
FY27-09_Stone_Seal_Prevailing_Wages.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity