The City of Buda is seeking a qualified contractor for the Garlic Creek Trail Construction project (RFP #24-295), a field-engineered infrastructure development located in Hays County, Texas. The procurement involves constructing approximately 7,800 to 10,350 linear feet of a 10-foot wide stabilized decomposed granite trail within Garlic Creek Park, with specific deliverables including concrete trail construction, box and pipe culvert installation, and a prefabricated pedestrian bridge. Key project requirements mandate compliance with ADA/TAS accessibility standards and utilize a flexible field engineering approach that allows design adaptations based on existing site conditions. The solicitation requires contractors to provide all necessary labor, materials, and equipment for comprehensive trail development. Critical procurement dates include a proposal submission deadline of October 7, 2024, at 2 PM, with potential bidders required to attend a mandatory pre-bid meeting and submit signed addendum acknowledgments. Evaluation criteria appear to focus on technical capability, understanding of project specifications, and ability to execute complex trail construction with minimal environmental disruption.
No specific set-aside designations or vendor restrictions were explicitly detailed in the procurement documents. The project does not indicate preferences for disadvantaged business enterprises or minority-owned contractors. While no incumbent vendor information was provided, the procurement suggests a total project scope that would likely require substantial civil engineering and trail construction expertise. Budget range estimates are not directly stated, but the complexity of the project—including culvert installations, pedestrian bridge construction, and approximately 10,350 linear feet of trail—implies a significant capital investment. The trail construction involves specialized elements such as Stalok paving material, revegetation, silt fence installation, and careful tree protection, with addendum documents indicating specific technical requirements like warranty periods of one year for the decomposed granite trail and two years for concrete structures and the pedestrian bridge. Potential contractors should demonstrate advanced capabilities in municipal infrastructure development, environmental sensitivity, and adaptive field engineering techniques.
Opportunity text
The City is seeking to enter a contract with a qualified contractor for a field-engineered project furnishing all labor, materials and equipment for the construction of approximately 7,800 to 10,350 LF of 10-foot wide stabilized decomposed granite trail within Garlic Creek Park using a Field Engineering process with detailed design provided in the field during construction based on existing conditions and standard details in compliance with ADA/TAS requirement. The project includes concrete trail construction, box and pipe culvert installation, and a prefabricated pedestrian bridge.
Files
| File | Type | Posted |
|---|---|---|
| 24-295 Addendum 2 - FINAL.pdf | ||
| 24-295 Garlic Creek Trail Addendum 1.pdf | ||
| 24-295 Garlic Creek RFP.pdf | ||
| 24-295 Addendum #3 - Final.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity