24-295 Garlic Creek Trail Addendum 1.pdf

PDF 247 KB Posted

Attached to
FY24-295 RFP - Garlic Creek Trail Construction
Solicitation number
24-295
Issued by
Hays County, Texas

About this file

This document is Addendum No. 01 for the City of Buda's Garlic Creek Trail Construction project (IFB No. FY24-295), issued on September 26, 2024, modifying the original bid documents from September 11, 2024. The addendum includes project manual revisions specifying warranty periods of one year for the stabilized decomposed granite trail and two years for the pedestrian bridge and concrete structures. It provides responses to pre-bid meeting questions, clarifying details such as trail section specifics, tree removal procedures, bridge manufacturer preferences, trail length additions, and required horizontal clearances. The addendum also emphasizes the need for safe construction practices and prevention of mud tracking on streets.

The document contains additional technical clarifications from a request for information (RFI) log, including bridge design specifications such as AASHTO load requirements, safety rail height (54"), paint system details (2 coats in brown), and bearing recommendations. The addendum indicates that contract time will be adjusted proportionally if alternate 1 (additional trail length) is selected, and a revised bid form with unit quantities for tree protection and erosion control will be provided. The pre-bid meeting sign-in sheet shows representatives from at least three companies attended the September 25, 2024 meeting, indicating potential bidder interest in the approximately 7,800 to 10,350 linear feet trail construction project.

View the file

Other files

File Type Posted
24-295 Addendum 2 - FINAL.pdf PDF
24-295 Addendum #3 - Final.pdf PDF
24-295 Garlic Creek RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum Page 1 of 1

ADDENDUM

ADDENDUM NO. __01____

Date _September 26, 2024__________

City of Buda

Project Name _Garlic Creek Trail_______________

IFB No.: _FY24-295___________________

This Addendum forms a part of the Contract and corrects or modifies original Bid Documents, issued on September 11, 2024. Acknowledge receipt of this addendum in space provided on bid form. Failure to do so may subject bidder to disqualification.

A. Project Manual Revisions:

a. Warranty period shall be one year for the stabilized decomposed granite trail.

b. Warranty period shall be two years for the pedestrian bridge and all concrete, including, but not limited to, structural concrete for the pedestrian bridge and weir-dam crossings.

B. RFI and response log

C. Pre-bid Meeting sign-in sheet

D. Questions, Responses, and Clarifications from the pre-bid meeting:

Q1: Is there a detail for the trail section?

A1: The detail is included in the plans on sheet C01.4

Q2: How will tree removal be determined and will removed trees need to be hauled offsite?

A2: Trees to be removed will be identified in the field by the Field Engineer and tracked by the City Inspector. Contractor will be responsible for removal of tree from the site.

Q3: Is there a specific bridge manufacturer or installer that the City prefers?

A3: No preference. PMGR installed a recent pedestrian bridge for the City.

Q4: How will the additional trail length be added to the project?

A4: Additional trail length will be added by acceptance of bid alternate 1.

Q5: How much horizontal clearance is needed on each side of the trail.

A5: A minimum of two-feet clear space is required.

Clarification 1: Prepare for public interaction and keep the construction site safe due to proximity to homes.

Clarification 2: Tracking of mud on streets will not be allowed.

This addendum consists of ____ page(s)/sheet(s).

END

09/26/2024

Name Email Phone Number Date Submitted

Referenced Sheet/Page/P aragraph Number Question Response Responded by

Date Responded

Andrew Messer amesser@wheeler1892.com +1 (817) 320-2452 09/18/24 1:19 PM S101 I see the bridge reactions listed on sheet S101 but I would like to confirm that this bridge will be designed to a typical AASHTO 90psf live load and H5 vehicle load

Confirmed, the listed bridge reactions are based on typical AASHTO 90psf live load and H5 vehicle load.

Tony Buonodono 09/23/24

Andrew Messer amesser@wheeler1892.com +1 (817) 320-2452 09/18/24 1:20 PM S101 What is the desired height for the horizontal safety rail system? 42" is typical for walking bridges and 54" is typical for bridges that will see frequent bicycle traffic.

54" height Tony Buonodono 09/23/24

Andrew Messer amesser@wheeler1892.com +1 (817) 320-2452 09/18/24 1:22 PM S101 I assume the safety rails will be typical Steel angle rails and a steel rub & toe rail, please confirm.

Confirmed, will be manufacturer standard safety rails.

Tony Buonodono 09/23/24

Andrew Messer amesser@wheeler1892.com +1 (817) 320-2452 09/18/24 1:23 PM S101 I see the Buda Parks Director will be the decision-maker on the paint color for the bridge, but does Buda have any preferences on the paint system? For example, does Buda want to see a 2-coat or a 3-coat system?

Per the Parks Director, 2 coats and the color shall be brown.

Tony Buonodono 09/23/24

Andrew Messer amesser@wheeler1892.com +1 (817) 320-2452 09/18/24 1:24 PM S101 Are cover plates required or can we provide cover angles welded to the ends of the bridge to overhang the abutments?

Comply with manufacturer's recommendations.

09/23/24

Andrew Messer amesser@wheeler1892.com +1 (817) 320-2452 09/18/24 1:25 PM S101 Are stainless steel & teflon bearings sufficient? Provide per manufacturer's recommendations.

Tony Buonodono 09/23/24

Hunter Smith huntersmith@sccitx.com +1 (512) 990-7640 09/25/24 12:49 PM C01.1 note #4 and #5.

How are we to include a tree protection and a erosion control pricing in the bid form per LS if the quantiy of what we are installing will not be determined until it is field located after the bid? Can these items be made to bid per unit with a quantity so the contractor will be paid for what is actullay installed?

A revised bid form with unit quantities will be provided as part of an addendum.

Tony Buonodono, P.E., PMP 09/26/24

Hunter Smith huntersmith@sccitx.com +1 (512) 990-7640 09/26/24 5:54 AM Instructions to Bidders Page 5, Article 9-Contract Times

Is the substantial completion time of 90 days just for the base bid?

Or is it for both the base bid and the alternate 1 combined? If so can the owner please add additional days if the alternate 1 is chosen.

Contract time will be adjusted proportionally if alternate 1 is selected.

Tony Buonodono, P.E., PMP 09/26/24