Fully Accessible Playground Equipment

Closed State & local contract opportunity Posted

Solicitation number
8649-0-2017-BO
State
Wisconsin
Responses due

Opportunity facts

UNSPSC codes
Show all 26
Point of contact

Opportunity details come from vendornet.wi.gov. Updated .

About this opportunity

The City of Madison Parks Division is seeking proposals for fully accessible playground equipment to replace the existing community-level playground at Elver Park in 2018. Vendors must submit a minimum of three playground designs featuring a fully ramp-connected main play structure with equipment age-rated for 2-5 and 5-12 year olds, plus a triple-bay arched swing with specific seat configurations. The proposal requires six stand-alone play components including spring riders, spinners, disc swings, dome/cocoon spaces, net climbers, and a vendor-choice component. All designs must be from a single manufacturer and product line, presented via rendered plan views and 3D illustrations, and must comply with ADA standards, CPSC, ASTM, and IPEMA guidelines. Key evaluation criteria include uniqueness of equipment, product line options, number of play events, past performance, design guideline compliance, durability, use of green materials, and manufacturer reputation. The RFP was issued on August 15, 2017, with questions due by August 23, 2017, answers posted August 30, 2017, and proposals due September 12, 2017, at 2:00 PM CST.

The procurement includes local vendor preference for suppliers registered with the City of Madison as of the bid due date. Contractors with 15 or more employees and aggregate annual business exceeding $25,000 must comply with affirmative action requirements, and service contracts over $5,000 are subject to living wage provisions. The City is tax-exempt and will not guarantee contract use, as the final playground design will be selected by the neighborhood after initial vendor proposals. The total budget for playground equipment is capped at $110,000, excluding delivery costs, with vendors required to guarantee equipment delivery within four weeks of purchase order receipt. Materials must be new steel or aluminum with PVC-coated components, molded slides and roofs with UV-stabilized coloring, and stainless steel hardware, with wood construction explicitly prohibited. Vendors must provide comprehensive warranty information, which will be considered during the evaluation process. The actual site location and playground square footage will be finalized during the neighborhood design selection phase.

Opportunity text

The City of Madison anticipates constructing a fully accessible playground to replace an existing community-level playground at Elver Park in 2018 and is seeking proposals from vendors for playground designs.
The intent of this proposal is to select equipment designs that will be presented to the neighborhood as options for their playground. Once the design is selected by the neighborhood, the City shall work with the selected equipment vendor to adjust the design as necessary for the specific site requirements and per neighborhood requests. This final playground design shall fall within the budget established by the City. Construction of the playground, including installation of the playground equipment and procurement and installation of poured-in-place surface, shall be bid under a separate Public Works contract

Files

File Type Posted
Addendum 1.pdf PDF
8649-0-2017-BO Fully Accessible Playground Equipment.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity