FTTH Maintenance and Construction RFP
Closed State & local contract opportunity
- Solicitation number
- 2026-05
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 72523 Fiber Optics Cables, Interconnecting Components, And Accessories (Including Wiring Systems Tools And Supplies) (Effective 3-1-07 This Class-Item Inactivated For New Use, Refer To 838-29)
- 83829 Cable, Fiber Optic W/Interconnecting Components And Accessories (See Class 280 For Other Communications Cable
- 96218 Cable Construction, Installation And Maintenance (Fiber Optic, Communication, Computer, Etc.)
- UNSPSC codes
- 26121657 Flame retardant fiber optic cable
- 43223321 Fiber optic connector clip
- 43223339 Fiber optic distribution box
- 72141116 Television cable laying service
- 26121637 Outdoor fiber optics cable
- 26121655 Simplex and duplex fiber optic cable
- 41113717 Fiber optic test sources
- 41113716 Fiber optic fault locators
- 43223335 Fiber optic music wire
- 43223322 Fiber optic support grip
Show all 29
- 43223341 Combiner
- 72103302 Telecom equipment maintenance or support
- 72141115 Electrical cable laying service
- 26121650 Fiber optic cable assembly
- 26121656 Submarine fiber optic cable
- 43223311 Fiber optic attenuator
- 43223318 Fiber optic emitter
- 43223323 Fiber optic adapter
- 43223336 Fiber optic scope adapter
- 43223338 Fiber optic connection closure
- 43223340 Fiber optic fusion splicer
- 43223343 Network punchdown tool
- 72151602 Fiber optic cable installation service
- 72154005 Cable splicingservice
- 43223326 Fiber optic patch cord
- 43223337 Fiber optic enclosure
- 43223310 Fiber optic connector
- 43223342 Waveguide and connection kit
- 72141117 Telephone and communication cable laying service
- Point of contact
-
- Wesley Sims wsims@gladeselectric.com
Updated .
About this opportunity
Glades Electric Cooperative, Inc. (GEC) is requesting proposals from qualified fiber construction contractors to maintain and expand its existing aerial and underground fiber optic system across portions of Glades, Hendry, Highlands, and Okeechobee counties in Florida, with proposals due June 11, 2026 and questions due June 2, 2026. The three-year contract term runs through December 31, 2028.
GEC operates 1,650 miles of outside plant comprising 1,550 miles of overhead fiber and 100 miles of underground fiber serving approximately 4,500 active broadband customers, with an estimated 900 new services annually. The scope encompasses maintenance of existing aerial and underground fiber, installation of new drops, and fiber extensions across the service territory. All labor, equipment, and supervision are the contractor's responsibility. Work is performed Monday through Thursday, 6:30 a.m. to 5:00 p.m., with emergency call-out availability required.
The awardee must establish a local office with indoor warehousing within 30 days of contract award and maintain at least 50 percent in-house employees; subcontracting requires GEC approval. Current Commercial General Liability and Workmen's Compensation insurance and compliance with NESC, OSHA, EPA, and DOT standards are mandatory. Weekly invoices with supporting deliverables are required; no cost adjustments or pricing changes are permitted without written GEC approval and Conexon notification.
Bidders submit proposals on a provided Excel rate sheet with unit-based pricing for maintenance and new construction services differentiated across aerial, underground, and splicing work and specialized services such as equipment rental and tree trimming. Pricing is requested for 2026, 2027, and 2028. The evaluation committee scores on qualifications of firm and staff (40 points), relevant past performance (30 points), and cost (30 points). GEC reserves the right to reject any or all proposals and award to other than the lowest-priced offeror. Intent to award is anticipated for mid-June 2026. Proposals are submitted via myvendorlink.com.
Opportunity text
GEC is seeking proposals from qualified fiber construction contractors to maintain our existing aerial and underground fiber optic system as well as install drops and add additional fiber to our system as needed. Any new drops and additional fiber added to our system will be classified as "new construction". The Contractor shall provide all labor, equipment, and supervision necessary. This work will be across our whole service territory which covers parts of Glades, Hendry, Highlands and Okeechobee counites in the state of Florida. The intended period for this contract will be 3 years in which the executed contract will expire on December 31, 2028. Please see more detailed information in the RFP document.
Files
| File | Type | Posted |
|---|---|---|
| 202605__FTTH_Maintenance_and_Construction_RFP.pdf | ||
| 202605__FTTH_Maintenance_and_Construction_Bid_Sheet.xlsx | XLSX spreadsheet |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity