About this file
This is a Fiber to the Home (FTTH) Maintenance and Construction Bid Sheet for a qualified fiber construction contractor serving Glades, Hendry, Highlands, and Okeechobee counties in Florida. The bid sheet encompasses a comprehensive range of services across three primary categories: aerial units, underground units, and splicing units, along with specialized services for non-emergency work, storm restoration, and drops. Aerial services include fiber installation on strand, pole attachments, guy installations, anchor work, fiber rearrangement, and maintenance activities. Underground services cover duct installation via trenching and directional boring, pedestal and vault installation, fiber pulling and installation, utility locating, and riser transfers. Splicing services involve preparation and placement of aerial and underground splice enclosures in various sizes, fusion splicing, and cable tail management. The contract is intended for a three-year term expiring December 31, 2028, with pricing structures established for 2026, 2027, and 2028 rates across all line items.
The bid sheet establishes unit pricing methodology with rates differentiated by year and service category, with items highlighted in yellow or green indicating the most frequently required services for both maintenance and new construction activities. Services are priced individually by unit of measure, including per-foot charges for duct and fiber installation, per-each charges for equipment installation and transfers, hourly rates for crew labor and specialized personnel, and per-day rates for storm restoration activities. The bid sheet includes provisions for FEMA-reimbursable storm restoration events with dedicated pricing structures separate from standard Business-As-Usual (BAU) non-reimbursable storm work. Specialized services such as emergency crews, supervisory oversight, equipment rental (bucket trucks, flatbed trucks, pickup trucks), and tree trimming are separately itemized with their respective rates, enabling precise project costing and flexibility in contractor selection based on service capability and pricing competitiveness.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 202605__FTTH_Maintenance_and_Construction_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet
| Maintenance Bid Sheet | |||||||
| NOTE: Items highlighted in Yellow or Green are the most common services needed for both Maintenance and New Construction. | |||||||
| Unit Name | Unit of Measure | Description | 2026 Rate | 2027 Rate | 2028 Rate | ||
| AERIAL UNITS | |||||||
| AERIAL | C6M | Ft | Install 1/4” strand, including all bolts and hardware necessary for attachment | New Construction | |||
| AERIAL | C6M-S | Ea | Adder for Framing pole attachment Hardware to steel or Concrete poles by Drilling Steel or Banding Concrete | New Construction | |||
| AERIAL | BM80T-S | Ea | Adder for drilling steel or banding concrete poles to attach riser guard BM80T or Riser BM80 | New Construction | |||
| AERIAL | MR-Steel | Ea | Adder to Transfer or Rearrange attachments to steel or concrete pole by Drilling Steel or Banding Concrete | Maintenance | |||
| AERIAL | PM2-A | Ea | Install copper bond from strand to VGR | ||||
| AERIAL | PE1-3 | Ea | Install 1/4” down guy for strand | New Construction | |||
| AERIAL | PE1-3-JB | Ea | Install 1/4” down guy for strand include Johnny Balls (insulators) | ||||
| AERIAL | PM12(5) | Ea | Labor to install a sidewalk guy arm. The guy, guy guard and anchor assembly units will be specified separately. | ||||
| AERIAL | PM11 | Ea | Install guy guard | New Construction | |||
| AERIAL | PM-11-E | Ea | Install / Replace guy guard on electric down guy | New Construction | |||
| AERIAL | PF3-3-AUX | Ea | Install Auxiliary eye to existing anchor | ||||
| AERIAL | PF3-3 | Ea | Install 6” helical anchor, 6,000 pound | New Construction | |||
| AERIAL | PF1-5A | Ea | Labor to install one (1) anchor rod with expanding bust pot complete and in place, ready for attaching the guy strand. 8" bust pot with 3/4"X8' Twin Eye 10,000# | ||||
| AERIAL | PF5-3A | Ea | Labor to install one (1) Rock anchor with Rod complete and in place, ready for attaching the guy strand.1.75"X 84" Rod 3/4" | ||||
| AERIAL | PM4 | Ea | Install extension arm – 12” | ||||
| AERIAL | PM4-A | Ea | Install extension arm – 18" to 24” | ||||
| AERIAL | PMSL | Ea | Install 150’ of fiber in storage loops utilizing 2 snowshoes (lashed) | New Construction | |||
| AERIAL | CO(count) | Ft | Install first fiber on strand, any count – place count in parenthesis | New Construction | |||
| AERIAL | CO(count)D | Ft | Install second fiber on strand, at the same time as the first (any count) | ||||
| AERIAL | CO(count)E | Ft | Over lash 2nd or 3rd or greater fiber on strand, second pass, (any count) | ||||
| AERIAL | WD | Ea | Install spiral wind dampener during fiber construction | ||||
| AERIAL | MR-S | Ea | Rearrange straight attachment fiber or CATV or phone | Maintenance | |||
| AERIAL | MR-C | Ea | Rearrange curved attachment fiber or CATV or phone | Maintenance | |||
| AERIAL | MR-DE | Ea | Rearrange deadend attachment fiber or CATV or phone | Maintenance | |||
| AERIAL | WC-1 | Ea | Transfer of fiber to new pole straight thru attachment; Resag up to 1 span in all directions; Includes reposition of bug nut and spacers as needed (Prior approval needed for Delash/Relash) | Maintenance | |||
| AERIAL | MR-A | Ea | Rearrange ADSS attachment | ||||
| AERIAL | WCT | Ft | Wreck out abandoned CATV plant/fiber plant | ||||
| AERIAL | DCT | Ft | De-lash Abandoned CATV plant and bring strand to NESC spec | ||||
| AERIAL | DRF | Ft | De-lash and remove abandoned fiber cable | ||||
| AERIAL | RCD | Ea | Remove drops from abandoned CATV plant | ||||
| AERIAL | BM80T | Ea | Install tap riser guard up to 2" – (to protect fiber from power space down to tap mounting location) | Maintenance | |||
| AERIAL | RPE1-3 | Ea | Repair or replace Electric down guy | ||||
| AERIAL | REOH | Ea | Repair or replace overhead guy | ||||
| AERIAL | RCO(count) | Ft | De-lash and re-lash existing fiber | New Construction | |||
| AERIAL | PP | Ea | Pull vacated pole | ||||
| AERIAL | RA | Ea | Remove old anchor | ||||
| AERIAL | PMSR | Ea | Install storage rack 12' from ground | ||||
| AERIAL | PMSR-S | Ea | Adder for Banding Storage rack 12' from ground on Steel or Concrete pole. 2 bands Required | New Construction | |||
| AERIAL | Tap-S | Ea | Adder for Banding Tap Pole Mount Bracket to steel or Concrete Pole 2 bands Required. | New Construction | |||
| AERIAL | SETUP AER | Ea | Setup Fee for 750 ft or less for new aerial extension or forced relocation | ||||
| AERIAL | RESAG | Ea | Resag strand and fiber per span | Maintenance | |||
| AERIAL | WC-2 | Ea | Transfer of fiber to new pole curve; Transfer down guy;Resag up to 1 span in all directions; Includes reposition of bug nut and spacers as needed (Prior approval needed for Delash/Relash) | Maintenance | |||
| AERIAL | WC-3 | Ea | Transfer of fiber to new pole complex; Transfer down guys; Movement of more than 1 strand-(Prior approval needed for Delash/Relash) | Maintenance | |||
| AERIAL | M-TPB | Ea | Move Tap and Bracket | Maintenance | |||
| AERIAL | MSEB | Ea | Move Splice Enclosure and H Frame | ||||
| Maintenance | |||||||
| AERIAL | DPT | Ea | Transfer OH drop to new pole | Maintenance | |||
| UNDERGROUND UNITS | |||||||
| UG | BF01-VP-VT | Ft | Install vacant duct (up to 1"), min 24” deep, plow or trench | ||||
| UG | BF02-ET | Ft | Install vacant duct (up to 2”) in existing electrical trench | ||||
| UG | BF02-VT | Ft | Install vacant duct (up to 2"), min 24” deep, trench | New Construction | |||
| UG | BF02(2)-VT-(24) | Ft | Install second vacant duct (up to 2") at 24" depth trench | ||||
| UG | BF02-VT-R(24) | Ft | Place duct (up to 2”) – rock construction adder – 24” deep – with approval | ||||
| UG | BF02-VT-R(18) | Ft | Place duct (up to 2”) – rock construction adder – 18” deep – with approval | ||||
| UG | BF02-VT-R(12) | Ft | Place duct (up to 2”) – rock construction adder – 12” deep – with approval | ||||
| UG | BF02-VT-R(06) | Ft | Place duct (up to 2”) – rock construction adder– 6” deep – with approval | ||||
| UG | BF04-VT | Ft | Install vacant duct (up to 4"), min 24” deep trench | ||||
| UG | BF04(4)-VT-(24) | Ft | Install second vacant duct (up to 4") at 24" depth trench | ||||
| UG | BF02-VP | Ft | Install vacant duct (up to 2"), min 24” deep, plow | ||||
| UG | BF04-VP | Ft | Install vacant duct (up to 4"), min 24” deep plow | ||||
| UG | BF04-VT-R(24) | Ft | Place duct (up to 4”) – rock construction adder – 24” deep | ||||
| UG | BF04-VT-R(18) | Ft | Place duct (up to 4”) – rock construction adder – 18” deep | ||||
| UG | BM60(1)-D | Ft | Place duct (up to 1”) by directional bore – min 24” deep | ||||
| UG | BM60(1)-A | Ft | add (1) additional up to 1" pipe to bore | ||||
| UG | BM60(2)-D | Ft | Place duct (up to 2”) by directional bore – min 24 - 48” deep | New Construction | |||
| UG | BM60-IDA | Ft | Adder for placing duct by directional bore greater than 48" depth as required by municipalities (requires PM pre-approval) | ||||
| UG | BM60(2)-A | Ft | add (1) additional up to 2" pipe to bore | ||||
| UG | BM60(2)-R | Ft | Rock adder for bores | ||||
| UG | BM60(4)-D | Ft | Place duct (up to 4”) by directional bore – min 24” deep | ||||
| UG | BM60(4)-A | Ft | add (1) additional up to 4" pipe to bore | ||||
| UG | BM80 | Ea | Install riser guard 2” to 3” x 8’ | ||||
| UG | BM72 | Sq Ft | Remove and restore asphalt surface – 6” thickness (includes material) | ||||
| UG | BM73 | Sq Ft | Remove and restore concrete surface – 6” thickness (includes material) | ||||
| UG | BM53 | Ea | Install fiber marker post on buried fiber route | ||||
| UG | BD5RV | Ea | Install above ground pedestal – vertical | New Construction | |||
| UG | BD5RL | Ea | Install above ground pedestal – oversized (24x36 or greater) | ||||
| UG | BDLV-P | Ea | Install Pencell Pedestal With Vault up to 30" x 24" Base | New Construction | |||
| UG | BDV | Ea | Install below grade vault up to 24x36 | ||||
| UG | BDVL | Ea | Install below grade vault larger than 24 x 36 | New Construction | |||
| UG | BDHH | Ea | Install small hand hole for drop access point (Flowerpot) | New Construction | |||
| UG | BDMV | Ea | Install up to 16 x 20 small vault | ||||
| UG | BF02(2)(CO)-ED | Ft | Pull fiber through existing duct any count | ||||
| UG | BFOI(count) | Ft | Install first fiber in duct, any count – place count in parenthesis | New Construction | |||
| UG | BFOI(count)D | Ft | Install second fiber in duct, any count | ||||
| UG | BFOI(count)E | Ft | Install 3rd or greater fiber in duct, any count | ||||
| UG | BFO_TRACE | Ft | Install tracer wire if needed (where there is un-armored fiber) | New Construction | |||
| UG | BFOPS | Ft | Install pull tape (Mule tape or pull string) in existing duct | ||||
| UG | Locate-PVT | Hr | Locate Private Utilities are defined as any utility existing that is not located by a public utility locate service. These utilities could include, but not limited to, private power, phone, gas, water, data, fire line, irrigation, dog fence. etc. The goal is to prevent the strike of any private utility in the ground by identifying the location of said utility prior to digging commences. | ||||
| UG | LOC | Ea | Locate secondary electric line rate | ||||
| UG | BF02(2)-VP-(24) | Ft | Install vacant duct (up to 2") at |
24" plow
| UG | SETUP UG | Ea | Setup Fee for 350 ft or less for underground extensions or replacements |
| UG | BF04(4)-VP-(24) | Ft | Install second vacant duct (up |
to 4") at 24" plow
| UG | PED-LID-REPAIR | Ea | Repair Pedestal Lid | |
| UG | PED-LID-REPLACE | Ea | Replace Pedestal Lid | |
| UG | XXBD5RL | Ea | Remove above ground pedestal - oversized (24x36 or greater) | |
| UG | XXBD5RV | Ea | Remove above ground pedestal- vertical | |
| UG | XXBDV | Ea | Remove below grade vault up to 24x36 | |
| UG | XXBDVL | Ea | Remove below grade vault larger than 24x36 | |
| UG | D-DF | Ea | Dig and retrieve- dig up to expose conduit and damaged fiber | |
| UG | DPT-UG | Ea | Transfer UG drop and riser guard to new pole | |
| UG | WC-Riser | Ea | Transfer existing fiber cable and riser guard to new pole | New Construction |
| SPLICING UNITS | ||||
| Splicing | HAFO(A) | Ea | Prep and Place aerial splice enclosure equivalent of Tyco |
“A” regardless of strand count
| Splicing | HAFO(B) | Ea | Prep and Place aerial splice enclosure equivalent of Tyco “B” regardless of strand count |
| Splicing | HAFO(C) | Ea | Prep and Place aerial splice enclosure equivalent of Tyco |
"C" regardless of strand count Splicing HAFO(D) Ea Prep and Place aerial splice enclosure equivalent of Tyco “D” regardless of strand count Splicing HAFO(2T) Ea Prep and place aerial TAP enclosure 2 Port (includes placement of Tyco A or B closure) Splicing HAFO(4T) Ea Prep and Place aerial TAP enclosure 4 Port (includes placement of Tyco A or B closure) Splicing HAFO(8T) Ea Prep and Place aerial TAP enclosure 8 Port (includes placement of Tyco A or B closure)
| Splicing | HBFO(A) | Ea | Prep and place underground splice enclosure equivalent of Tyco “A” |
| Splicing | HBFO(B) | Ea | Prep and Place underground splice enclosure equivalent of |
Tyco “B” Splicing HBFO(C) Ea Prep and Place underground splice enclosure equivalent of Tyco "C" Splicing HBFO(D) Ea Prep and Place underground splice enclosure equivalent of Tyco “D” Splicing HBFO(2T) Ea Prep and place underground TAP enclosure 2 Port (includes placement of Tyco A or B closure) Splicing HBFO(4T) Ea Prep and Place underground TAP enclosure 4 Port (includes placement of Tyco A or B closure) Splicing HBFO(8T) Ea Prep and Place underground TAP enclosure 8 Port (includes placement of Tyco A or B closure)
| Splicing | HO1 | Ea | Fusion splice per fiber |
| Splicing | HO1T | Ea | Test fiber after splicing – per |
fiber
| Splicing | RESE | Ea | Splice Enclosure Re-entry |
| Splicing | HxFO(Tail) | Ea | Adding a new cable tail or re- |
prepping existing tail Splicing MSFE Ea Mid Sheath Fiber Entry/Ring Cut
| OTHER UNITS | |||
| Other | NES-Sup | Hr | Non-Emergency Supervisor- normal work day (PM Approval required) |
| Other | NE-AC | Hr | Non-Emergency 2-3 man Aerial Crew-normal work day (PM Approval required) |
| Other | NE-UGC | Hr | Non-Emergency 2 -4 man Underground Crew-normal work day (PM Approval required) |
| Other | EACA-3 | Hr | Emergency Construction 3- man crew aerial |
| Other | EASP | Hr | Emergency Construction |
splicer
| Other | EALB | Hr | Emergency Construction laborer |
| Other | EAAS | Ea | Emergency Assessor |
| Other | EACO | Ea | Emergency Callout |
| Other | NWR | Ea | Night work required between |
11pm-6am (per crew)
| Other | STAGE | Day | Storm Restoration Per Diem |
| Other | PR-TREE TRIM | Per Span | Tree Trimming Per Span to include Comm Space (Requires Conexon PM Approval) |
| FEMA REIMBURSABLE EVENTS | |||
| Construction | SM-EAS | Hr | Storm Restoration Construction Supervisor |
| Construction | SM-EPD | Day | Storm Restoration Per Diem |
| Construction | SM-EACA | Hr | Storm Restoration Construction 2-man crew aerial |
| Construction | SM-EAL | Hr | Storm Restoration Construction Laborer |
| Construction | SM-EACU | Hr | Storm Restoration Construction Underground Crew |
| Construction | SM-ECO-SPLICER | Hr | Storm Restoration Construction Fiber Splicer |
| Construction | SM-ECO-CREW | Hr | Emergency Call Out per Crew |
| Construction | SM-EAS-TRK | Hr | Pick-up Truck |
| Construction | SM-EACA-BUKTRK | Hr | Bucket Truck |
| Construction | SM-EACU-FBTRK | Hr | Flatbed Truck |
| Construction | SM-ECO-SSPLICER-TRK | Hr | Truck/Van/Trailer |
| Construction | SM-STAGE | Ea | Per Day |
| Drops | SM-DR-STAGE | Ea | Per Day |
| Drops | SM-DR-TECH | Hr | Hourly Rate for Drop Tech |
| Drops | SM-DR-EAS-TRK | Hr | Pick-up Truck |
| Drops | SM-DR-EACA-BUKTRK | Hr | Bucket Truck |
| Drops | SM-DR-EACU-FBTRK | Hr | Flatbed Truck |
| Drops | SM-DR-ECO-SSPLICER-TRK | Hr | Truck/Van/Trailer (Hauling Equipment/Materials) |
| Drops | SM-PD | Day | Storm Restoration Per Diem |
| BAU STORM NON-REIMBURSABLE | |||
| BAU Storm Non-Reimbursable | M-EAS-TRK | Hr | Pick-up Truck |
| BAU Storm Non-Reimbursable | M-EACA | Hr | Storm Restoration |
Construction 2-man crew aerial
| BAU Storm Non-Reimbursable | M-EACA- | |||
| BUKTRK | Hr | Bucket Truck | ||
| BAU Storm Non-Reimbursable | M-EAL | Hr | Storm Restoration Construction Laborer | |
| BAU Storm Non-Reimbursable | M-EAAS | Hr | Storm Restoration Assessor | |
| BAU Storm Non-Reimbursable | M-EACU | Hr | Storm Restoration Construction Underground |
Crew
| BAU Storm Non-Reimbursable | M-EACU-FBTRK | Hr | Flatbed Truck | |
| BAU Storm Non-Reimbursable | M-ECO- SPLICER | Hr | Storm Restoration Construction Fiber Splicer | |
| BAU Storm Non-Reimbursable | M-ECO- | |||
| SSPLICER-TRK | Hr | Truck/Van/Trailer | ||
| BAU Storm Non-Reimbursable | M-ECO-CREW | Hr | Emergency Call Out per Crew After Hours | |
| BAU Storm Non-Reimbursable | M-EAS | Hr | Storm Restoration Construction Supervisor |