The School District of Escambia County, Florida is requesting proposals for outside plant fiber optic maintenance and repair services under Form 470 RFP FY27-470-1, with questions due November 11, 2026 at 5:00 p.m. CST and proposals due December 17, 2026 at 1:30 p.m. CST. Responders must obtain and maintain valid SPIN certification and good standing Red Light status with the FCC before proposal evaluation and throughout the contract term. Solicitation seeks vendors approved by the Universal Service Administrative Company (USAC) to provide E-rate eligible goods and services. No set-aside or local-vendor preference is stated.

Scope covers bi-annual inspection and survey of approximately 62 miles of fiber route (36 miles aerial, 26 miles buried) to identify hazards including, but not limited to, construction activity, damaged buried-cable markers, damaged closures and splice enclosures, standing water near ducts and handholes, and damaged or leaning poles carrying District fiber. Inspections combine drive-by patrols with on-foot visual checks where necessary. The first inspection each contract year must occur before August 1, except the initial year, which requires completion within two months of award. Additional work includes pole transfers coordinated through NJUNS and emergency repairs available 24/7 with a four-hour response requirement. Immediate threats to network operation or public safety must be reported to the District Contract Administrator immediately, and other threats must be documented and reported within one week.

The contract term runs five years in one-year increments from July 1, 2027 through June 30, 2032, with five additional one-year renewals subject to School Board approval and E-rate program allowances. Proposals must price labor rates by technician category, inspection events, pole transfers, mobilization, material markups, and optional-year escalation, with rates firm through the base term unless negotiated otherwise. Evaluation weights are pricing at 40 points, technical approach at 25 points, qualifications and references at 25 points, E-rate experience and invoicing capability at 5 points, and contract flexibility at 5 points. Anticipated School Board approval is February 16, 2027. No work begins until a Purchase Order is issued. Responders must provide background screening certification under Florida Statutes Sections 1012.32 and 1012.465 at their own cost and acknowledge all addenda.

Opportunity text

The Contractor shall perform a bi-annual inspection and survey of the entire fiber optic route, both underground and aerial, to identify and minimize potential hazards to the fiber optic cables or infrastructure. The inspection shall identify any of the following but not limited to: areas of construction activity; missing or damaged buried-cable markers; damaged or unsecured closure lids; significant areas of standing water near ducts and handholes; damaged splice enclosures; sunken or damaged handholes; damaged or leaning poles carrying District fiber; broken lashing or hardware; and other conditions that threaten the plant or public safety. The first bi-annual inspection and survey for each contract year shall be performed before August 1st of each school year with the exception of the initial year, which will be performed within two (2) months of Awarding this contract. The bi-annual inspection and survey shall be conducted by not only drive-by patrols but also through inspections on foot when necessary for visual inspections of handholes, splice points, and any other area deemed necessary by the District Contract Administrator (DCA). If an immediate threat to the operation of the network or public safety is assessed, it shall be communicated to the DCA immediately and scheduled for repair. All other possible threats will be thoroughly documented and reported to the DCA within one (1) week of the discovery and should be completed during regular business hours unless the DCA directs otherwise.