Livingston Town is requesting bids on interior renovation of Fire Station 43, with proposals due October 27, 2026. The scope encompasses renovation of approximately 2,720 square feet of interior space including restroom and locker room facilities, laundry room, offices, and sleeping areas, plus concrete floor repair and replacement of approximately 264 square feet in the heavy-duty engine bay. The work includes all associated electrical, mechanical, and plumbing systems required for the renovated spaces. The project requires provision of temporary accommodations for firefighters during construction to maintain station operations. The Project Manual (257030_Fire Station 43 Renovation_Project Manual.pdf, 17 MB) contains detailed specifications, drawings, site conditions, and material standards and serves as the primary reference document for bid preparation. Contractors must account for operational constraints of maintaining a functioning fire station during renovation and implement measures to minimize disruption to emergency services. No estimated contract value, evaluation criteria, set-asides, preferences, pre-bid meeting date, or question deadline is identified in the source materials.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
257030_Fire Station 43 Renovation_Project Manual.pdf | 17MB | 10/1/26 |