Fine Arts Instructional Center – Boiler Replacement

Open State & local contract opportunity Posted

Solicitation number
ECSU 2027-203
State
Connecticut
Responses due

Opportunity facts

Jurisdiction
UNSPSC codes
Show all 14
Point of contact

Opportunity details come from webprocure.proactiscloud.com. Updated .

About this opportunity

Eastern Connecticut State University is soliciting bids under Invitation to Bid ECSU 2027-203 to replace the boiler system at its Fine Arts Instructional Center in Willimantic, Connecticut, with a mandatory pre-bid conference on November 13, 2026 and bids due December 4, 2026. Bidders must pre-qualify under Connecticut General Statutes Section 4a-100 as "General Building Construction - Group C" HVAC contractors, required for projects exceeding $1 million.

The scope covers installing three natural gas condensing hot water boilers with boiler pumps, piping, power wiring, and controls, including removal of the existing boilers and associated gas, condensate, hydronic, and electrical work. The drawings specify Lochinvar FBN2501 boilers, each rated 2,400–2,500 MBH. The contractor must perform wall-penetrating radar before core boring, give ECSU Facilities Management & Planning at least two weeks' notice before utility shutdown and 48 hours before work starts, and comply with OSHA lockout-tagout procedures.

The contract carries a 6.95% Small Business Enterprise subcontractor participation goal, with 3.29% directed to minority or women-owned business enterprises. Contractors must perform at least 30% of the work with their own forces. Prevailing wage under Connecticut General Statutes Section 31-53 applies. The project manual estimates the project will not exceed $3 million, funded by the university. Bid security is a certified check or bid bond equal to 10% of the bid amount. Awarded contractors must furnish performance and labor and material bonds, each at 100% of the contract price. Liquidated damages are $300 per calendar day for missed milestones.

Work commences within five working days of notice to begin. Substantial completion is required by May 30, 2027, against a 160-calendar-day construction duration. Other milestones include submittals and equipment ordering by January 15, 2027, hydronic shutdown during March 15–21, 2027, and boiler startup by April 30, 2027.

Vendor questions are due November 20, 2026 at 2:00 p.m. EST. The project manual places the pre-bid meeting at 9:00 a.m. in the second-floor conference room of the Facilities Building at 32 Charter Oak Road. Bids are due December 4, 2026 at 2:00 p.m. EST. Kate Rotella (860-465-5148, rotellac@easternct.edu) is the point of contact. Bid documents are available through the Connecticut DAS CTSource BidBoard and the university's fiscal affairs webpage.

Opportunity text

Project Description: The work involves the installation of three highly efficient natural gas condensing type hot water boilers including boiler pumps, all associated piping, power wiring and controls. Bid Documents and all information are accessible via https://portal.ct.gov/DAS/CTSource/BidBoard and https://www.easternct.edu/fiscal-affairs/purchase/bid-information.html Mandatory Pre-Bid Conference November 13, 2026, 9 a.m. at the Facilities Conference Room