Field Site Master Plan for Tucson Water
Closed State & local contract opportunity
- Solicitation number
- 226005
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 90740 Engineering Services, Non-Licensed (Not Otherwise Classified)
- 91842 Engineering Consulting
- 925 Engineering Services, Professional
- 92517 Civil Engineering
- 92536 Engineering Services (Not Otherwise Classified)
- 92553 Industrial Engineering
- 92567 Mechanical Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- 96891 Water Supply Analysis, Infrastructure Analysis, Water Quality Analysis, And Long Term Planning
- UNSPSC codes
- 81102501 Mine permitting service
- 81103300 Geomatics engineering
- 81101500 Civil engineering
- 81101605 Electromechanical services
- 81101602 Mechanical product enclosures design
- 81101603 Machine tool design
- 81101501 Well engineering
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
Show all 23
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 81101600 Mechanical engineering
- 81101527 Wastewater engineering
- 81101528 Stormwater engineering
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81102702 Process control system design and engineering service
- 81101531 Sanitation engineering service
- 81101529 Acoustic engineering
- 81101606 Marine engineering
- Point of contact
-
- Andrew Klos andrew.klos@tucsonaz.gov (520) 837-6685
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
Tucson Water has issued Request for Qualifications (RFQ) No. 226005 for Architectural and Engineering Professional Services to develop a comprehensive Field Site Master Plan for their SCADA system. The procurement seeks a consultant to create a detailed master plan focusing on instrumentation, controls, communications, and technology improvements across wells, boosters, and storage sites. The RFQ was published on February 25, 2022, with proposal submissions due on March 22, 2022, at 2:00 pm local Arizona time. A pre-submittal conference was held on March 4, 2022. The evaluation process will be conducted in two phases using a points-based scoring system with four primary criteria: Qualifications and Experience of the Firm (35 points), Firm's Experience with Similar Projects (30 points), Qualifications and Experience of the Project Team (20 points), and Method of Approach (15 points). The project timeline spans approximately 36 months, with a tentative Notice-to-Proceed date of June 30, 2022, and includes six primary tasks ranging from project management and coordination to master plan implementation.
The RFQ allows for the use of subconsultants, provided they are approved in advance and comply with the city's requirements, including insurance provisions, business licensing, and immigration law compliance. No specific set-aside designations or restrictions for disadvantaged enterprises were explicitly mentioned in the documentation. The estimated annual budget for the project is $330,000, with services to be requested on an as-needed, if-needed basis. The City intends to select one firm through a competitive one-step process, with the top-ranked firm invited to negotiate billing rates. The project will involve comprehensive site visits, research, workshops, and the development of draft and final master plan reports, with implementation expected to extend through July 2025. While no incumbent vendors were specified, the project appears to focus on improving existing SCADA infrastructure and technology across Tucson Water's field site operations in Pima County, Arizona.
Opportunity text
Tucson Water is seeking to hire a Consultant to assist in the creation of a Master Plan for the SCADA system.
Files
| File | Type | Posted |
|---|---|---|
| Field_Site_Master_Plan_for_Tucson_Water_(Addendum_#2_Revision).pdf | ||
| Attachment_A.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity