Factory Shoals Tank Repairs and Perimeter Handrail Project
Closed State & local contract opportunity Posted
- Solicitation number
- PE-66365-NONST-2024-000000005
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The Cobb County-Marietta Water Authority is seeking bids for the Factory Shoals Tank Repairs and Perimeter Handrail Project. The project involves repairs, coatings, and the addition of a perimeter handrail to the Factory Shoals prestressed concrete ground storage tank located in Austell, Georgia. The scope of work includes mobilization, tank access, removal of existing coatings, concrete repairs, application of new coatings, removal and installation of handrailing, installation of a safety gate, removal and application of backer rod and joint sealant, installation of drainage stone, and cleaning of the work area. The project has a 180-day completion period and will be awarded in a single contract. A mandatory pre-bid conference will be held on January 12, 2024, and all bids must be submitted by January 25, 2024. Bidders must be pre-qualified, and the successful bidder will be required to provide performance and payment bonds, as well as other compliance documents.
The bid documents do not specify any set-aside designations or restrictions on the types of organizations that can respond. The contract will be awarded to the successful bidder based on their qualifications and compliance with the bid requirements. The bid documents do not provide any details on incumbent vendors, current contractors, or existing infrastructure that may require integration. Additionally, the bid documents do not specify any award values or budget ranges for the project.
Opportunity text
The Project will result in tank repairs, coatings, and the addition of perimeter handrail to Factory Shoals prestressed concrete ground storage tank located at 7223 Factory Shoals Road, Austell Georgia 30168, including: mobilization, tank access, removal of existing coatings, concrete repairs, application of coating to tank exterior (painting), removal of existing handrail, installation of new handrailing around the full perimeter of the tank¿s dome top, installation of safety gate at existing ladder, removal and application of backer rod and joint sealant in the exterior foundation slab to wall joint around the perimeter of the tank, installation of drainage stone around the perimeter of the tank, and cleaning of work area outside of tank.
Files
| File | Type | Posted |
|---|---|---|
| Addendum No_ 1.pdf | ||
| Addendum No_ 2.pdf | ||
| AD _ Factory Shoals.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity