Factory Shoals Tank Repairs and Perimeter Handrail Project
Solicitation number
PE-66365-NONST-2024-000000005
Issued by
Cobb County, Georgia

About this file

This document is an Addendum No. 1 for the Factory Shoals Tank Repairs and Perimeter Handrail Project issued by the Cobb County-Marietta Water Authority. The addendum includes changes to the specifications regarding the containment system required for the blasting and painting operations. It also provides additional details about the filter fabric requirements and the installation of fall protection anchors on the concrete dome. The bid due date is January 25, 2024, and applications for pre-qualification of bidders must be submitted by January 23, 2024.

The document also includes a set of Questions and Responses related to the project. The questions cover topics such as the type of handrail construction, the use of wet blasting techniques, the approval of specific products, drainage and standing water concerns, and the use of anchors for worker safety. The responses provide clarification on the contractual requirements and the changes made in the addendum.

View the file

Other files

File Type Posted
AD _ Factory Shoals.pdf PDF
Addendum No_ 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FACTORY SHOALS TANK REPAIRS AND PERIMETER HANDRAIL PROJECT

Addendum No. 1 (01/17/2024)

ADDENDUM NO. 1

ISSUE DATE: January 17, 2024 for

COBB COUNTY-MARIETTA WATER AUTHORITY

Bids to be received until 2:00 p.m., local time, January 25, 2024, at the office of Cobb County-Marietta Water Authority, 1170 Atlanta Industrial Drive, Marietta, Georgia, 30066

Applications for Pre-qualification of Bidders will be received at the Administration and Engineering Office of the Cobb County-Marietta Water Authority, 1170 Atlanta Industrial

Drive, Marietta, Georgia 30066 until 2:00 p.m., local time, January 23, 2024.

Receipt of this addendum, and all other addenda, should be acknowledged as part of your Bid (refer to Section 00410, Bid Form). Failure to acknowledge receipt of the addenda may result in rejection of the Bid. This addendum forms a part of the Contract Documents.

Please note the following CHANGES to the above referenced Contract Documents as follows:

SPECIFICATIONS

1. Section 01560, Paragraph 1.01.A Containment System, replace paragraph 1 with the following: “1. Contractor shall furnish all labor, equipment, and materials to control cleaning/blasting debris and coating droplets from escaping to the atmosphere, ground surface, and/or exceeding the physical boundary of the site.”.

2. Section 01560, Paragraph 2.01 General, replace paragraph A with the following: “A.

The Contractor shall provide a containment system which allows for the containment of the environmentally sensitive waste, dust and paint that will be generated during the blasting and paint operations. The containment system shall protect against contaminates escaping to the atmosphere, ground surface, and/or exceeding the physical boundary of the site.”.

3. Section 01560, Paragraph 2.01 General, replace paragraph B with the following:

“B. The containment system shall meet Class 2W for water blasting or Class 2A for abrasive blast cleaning classification requirements as defined in SSPC Technology Guide No. 6 and include the following:

1. Containment Materials Type A2 – Flexible

(Class 2W and 2A)

2. Penetrability of Containment Material Type B3a - Water Impenetrable

(Class 2W)

Type B1 Air Impenetrable (Class 2A)

Addendum No. 1 (01/17/2024)

3. Support Structure Type C2 - Flexible Support Structure

4. Treatment of Joints Type D1 – Fully Sealed Joints

5. Entryways Type E3 – Overlap Entryway

6. Air Supply (Intake) Point Type F2 – Open

7. Input Air Flow Type G2 – Natural

8. Air Pressure Inside Containment Type H3 – Not Required (Class 2W)

Type H2 – Visual Verification

(Class 2A)

9. Air Movement Type I2 – Not Specified (Class 2W)

Type I1 – Minimum Specified

(Class 2A)

10. Exhaust Air Flow/Dust Collection Type J2 – Not Required (Class 2W)

Type J1 – Air Filtration (Class 2A)”.

DRAWINGS

1. Drawing S2, add note 11: “11. Filter fabric shall be a minimum 6-ounce per square yard (nominal) nonwoven needle punched synthetic fabric consisting of staple or continuous filament polyester or polypropylene. Filter geotextiles shall have a survivability Class of 1 or 2 in accordance with AASHTO M288.”.

2. Drawing S2, add note 12: “12. Contractor may install fall protection anchors to the cast in place concrete dome. Anchors shall not be used for supporting equipment. Anchors shall be designed by a Professional Engineer currently registered in the State of Georgia.”.

3. Drawing S3, replace note 5 with the following: “5. Apply one coat of cement based textured coating to all exterior dome and wall surfaces.”.

END OF ADDENDUM NO. 1

Attachments: Questions and Responses No. 1; Pre-Bid Meeting Sign-in Sheet

Questions and Responses No. 1 (01/17/2024) Page 1 of 3

QUESTIONS AND RESPONSES NO. 1

ISSUE DATE: January 17, 2024 for

QUARLES WATER TREATMENT PLANT 2 SCADA REPLACEMENT PROJECT

COBB COUNTY-MARIETTA WATER AUTHORITY

QUESTION 1: The specs and details on this, “to me” are contradictory.

The spec the handrails be made of:

1.5” round aluminum “tube” Sced 40 for horizontals Sced 80 for verticals / legs “which infers a custom build rail” ---which is what we do, but the drawings even show what appears to be a custom fabricated rail.

HOWEVER:

When you keep reading and look closer at the drawing details, they spec HOLLANDER manufacturing.

Which is a prefab railing system, which we do not do.

Another option would be “both” where we would build the custom rail – have it anodized—and then use the HOLLANDER base plates w/ barrier.

Q1 RESPONSE: Handrailing may be all welded or component type construction as specified, see specification Section 05520, Paragraph 2.03.B. An adjustable base flange is specified to allow for mounting to the inclined dome surface.

QUESTION 2: If we use wet blasting technique that generates no dust will a fully enclosed containment around take be required?

Q2 RESPONSE: Yes, containment system must meet requirements of SSPC Technology Guide No. 6 2W or 2A as stated in Section 01560, Paragraph 2.01 B, See Addenda No. 1.

Questions and Responses No. 1 (01/17/2024) Page 2 of 3

QUESTION 3: I am requesting your review for approval of the attached, submitted products for use on the Rehab Project at the Factory Shoals Tank for Cobb County - Marietta Water Authority.

Tank Exterior:

SECTION 03732 - 2.07 Cement Based Texture Coating Concrete Resurfacer: 100490085 - AW Cook HYDROSEAL

SECTION 09901 - 2.03 Exterior Elastomeric Topcoat Elastomeric: LX11W0051 - Loxon XP Waterproofing Masonry Coating

Q3 RESPONSE: Specification Section 00700 allows the contractor to submit Substitutes and “Or- Equals” for materials for the Engineer’s sole discretion to review if the item is functionally equal.

Performance requirements for the cement based textured coating are in specification Section 03713, Paragraph 2.07 and painting system in specification Section 09901, Paragraph 2.03.A.

Painting products also must meet the warranty requirements in specification Section 09901, Paragraph 1.09.

QUESTION 4: Another question I had about the tank is the area next to the expansion joint. Specifically, the slab / footing. Is there any other plan to mediate standing water? As of right now water pools around the exterior of the tank and has no current diversion. I see in the drawings and bid docs you’re wanting to use #57 stone as drainage around the perimeter of the slab but what about the slab not allowing water to flow away from the tank?

Pic attached for reference.

Q4 RESPONSE: Drainage stone is to be provided as shown.

QUESTION 5: Do you have a recommendation for filter fabric for the #57 stone? I don’t see one highlighted in the specs.

Q5 RESPONSE: See Addendum No. 1.

QUESTION 6: Are there anchors already installed on the tank for safety?

Q6 RESPONSE: The tank does not have anchors installed.

QUESTION 7: Are we able to install anchors on the tank for our guys to repel and maintain safety?

If so, where can this be done?

Q7 RESPONSE: Anchors may be installed into the concrete dome per Addendum No. 1.

Questions and Responses No. 1 (01/17/2024) Page 3 of 3

QUESTION 8: Within the bid documents it mentions, “Keep driveways, access walkways, and entrances clear and clean. Do not use these areas for parking and/or material storage.” Where can our workers park and store material?

Q8 RESPONSE: Materials may be stored onsite per specification Section 09901, paragraph 1.08.

Workers may park onsite provided Owner has access to maintain the tank and pump station, see specification Section 01520. Note that areas used must be restored at end of the project per General Conditions 6.11 C and Supplemental Conditions S.C.-6.13B.

QUESTION 9: Will there be an extension for the bid?

Q9 RESPONSE: No.

END OF QUESTIONS