This document is an Addendum No. 2 issued on January 19, 2024 for the Factory Shoals Tank Repairs and Perimeter Handrail Project by the Cobb County-Marietta Water Authority. The addendum provides changes to the specifications, including clarifying the requirements for the containment system to be used during blasting and paint operations. Specifically, the containment system must contain the environmentally sensitive waste, dust, and paint, and protect against contaminants escaping to the atmosphere, ground surface, or exceeding the physical boundary of the site. Water used for cleaning/blasting may be discharged onsite if it is tested for heavy metals and free of debris, otherwise it must be removed and disposed of properly. Bids for this project are due by 2:00 p.m. local time on January 25, 2024.

The addendum also includes Questions and Responses No. 2, which further clarifies the water discharge specifications in relation to the containment system requirements. Water collected in the containment systems may be discharged onsite if it meets the specified testing requirements for heavy metals and is free of debris.

View the file

Other files

File Type Posted
Addendum No_ 1.pdf PDF
AD _ Factory Shoals.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FACTORY SHOALS TANK REPAIRS AND PERIMETER HANDRAIL PROJECT

Addendum No. 2 (01/19/2024)

ADDENDUM NO. 2

ISSUE DATE: January 19, 2024 for

COBB COUNTY-MARIETTA WATER AUTHORITY

Bids to be received until 2:00 p.m., local time, January 25, 2024, at the office of Cobb County-Marietta Water Authority, 1170 Atlanta Industrial Drive, Marietta, Georgia, 30066

Applications for Pre-qualification of Bidders will be received at the Administration and Engineering Office of the Cobb County-Marietta Water Authority, 1170 Atlanta Industrial

Drive, Marietta, Georgia 30066 until 2:00 p.m., local time, January 23, 2024.

Receipt of this addendum, and all other addenda, should be acknowledged as part of your Bid (refer to Section 00410, Bid Form). Failure to acknowledge receipt of the addenda may result in rejection of the Bid. This addendum forms a part of the Contract Documents.

Please note the following CHANGES to the above referenced Contract Documents as follows:

SPECIFICATIONS

1. Section 01560, Paragraph 2.01 General, replace paragraph A with the following: “A.

The Contractor shall provide a containment system which allows for the containment of the environmentally sensitive waste, dust and paint that will be generated during the blasting and paint operations. The containment system shall protect against contaminates escaping to the atmosphere, ground surface, and/or exceeding the physical boundary of the site. Water used for cleaning/blasting may be discharged onsite provided it is tested for heavy metals in accordance with ASTM D3335 and free of debris. Water not meeting regulatory requirements shall be removed from the site and disposed of by the Contractor in accordance with all local, State, and federal regulations.”.

END OF ADDENDUM NO. 2

Attachments: Questions and Responses No. 2

Questions and Responses No. 2 (01/19/2024)

QUESTIONS AND RESPONSES NO. 2

ISSUE DATE: January 19, 2024 for

COBB COUNTY-MARIETTA WATER AUTHORITY

The following question was asked to clarify responses provided in Addendum No. 1:

QUESTION 1: Can you provide the water discharge specifications in regard to the containment specifications provided in Addendum 1?

Q1 RESPONSE: To further clarify the response to Question 2 in Addendum 1: Water from cleaning / blasting, which is collected in containment systems specified in Addendum 1, may be discharged onsite provided the discharge water is tested for heavy metals in accordance with ASTM D3335 and free of debris. See Addendum No 2.

Please note the project title in QUESTIONS AND RESPONSES NO. 1 (issued January 17, 2024) should be changed to:

“FACTORY SHOALS TANK REPAIRS AND PERIMETER HANDRAIL PROJECT”

END OF QUESTIONS

File details come from the government source that posted it. Updated .